Ports are an important driving force for world economic growth, but they consume considerable energy. The marine sector has proposed the development of green ports to achieve low-carbon sustainable development. This paper presents a green project scheduling model of port construction to optimize comprehensive economic and environmental efficiency. Various realistic constraints are considered, including investment scale, energy savings, emissions reduction, and project priority. Comprehensive efficiency involves cost reduction, energy savings, emissions reduction, and other efficiency goals. The problem is formulated as an integer program and is solved using CPLEX in a general algebraic modeling system (GAMS). We use a representative port in China as a case port in solving its green project scheduling. The results show that the port can save 6,527 tons of standard coal, reduce 40,875 tons of CO2, and save 49 million yuan per year in the five-year implementation period. The payback in investing in these green projects is less than six years. From an economic and environmental perspective, the comprehensive efficiency achieved is significant.
The collection and distribution network of ports is the main cause of carbon emissions. The carbon peak is a basic policy in China, and the subsidy policy is one of the common measures used by the government to incentivize carbon reduction. We analyzed the transportation methods and the flow direction of a port and proposed a carbon emission calculation method based on emission factors. Based on the transportation time and the cost, a generalized transportation utility function was constructed, and the logit model was used to analyze the impacts of subsidy policies on transportation, thus calculating the effects of the subsidies on carbon reduction. We used Guangzhou Port as a case study, and calculated the carbon reduction effects in six different subsidy policy scenarios and concluded that the absolute carbon reduction value was proportional to the subsidy intensity. In addition, we constructed a subsidy carbon reduction efficiency index and found that the Guangzhou Port collection and distribution network had higher subsidy carbon reduction efficiency in low-subsidy scenarios. Finally, a sensitivity analysis was conducted on the subsidy parameters, and scenario 8 was found to have the highest subsidy carbon reduction efficiency. This achievement can provide decision support for the carbon emission strategy of the port collection and distribution network.
With the increase of international trade activities, the dependence on container shipping is also increasing. The efficiency of container shipping activities will directly affect the trade exchanges between countries. However, traditional network analysis methods face many challenges, such as large-scale, highly dynamic and multi-dimensional issues. To this end, in this article, after reviewing existing network-based analysis methods and their limitations, we introduce the advanced network representation learning technology for container shipping network analysis. To demonstrate the effectiveness of the network representation learning based method, we perform a case study on container shipping network clustering, and the positive results demonstrate the potential of allying network representation learning for container shipping network analysis.
12 December 2018 in EURASIP Journal on Image and Video Processing
Due to the messy logistics goods in the port area, some automatic transport vehicles often have errors in cargo transportation due to large path identification errors. Based on this, this study is based on image recognition technology, taking the most common logistics transport vehicles in the port area as the research object and using video image recognition technology as a guiding technology to perform image recognition processing on the ground guidance path. Simultaneously, this study determined the image preprocessing method which is more favorable for visual navigation, used the morphological knowledge of the image to detect the edge of the path image, then determined the position of the path center line, and carried out simulation analysis. The research shows that the results of this study have certain practicality and can provide theoretical references for subsequent related research.