Most inhabited islands in Indonesia are powered by expensively known diesel generators and isolated from the primary grid due to either geographical or economic reasons. Meanwhile, the diesel generator can be combined with a photovoltaic (PV) system and Battery Energy Storage (BES) system to form a hybrid power generation system to reduce the energy cost and increase renewable energy penetration. For this, proper sizing of each power generation component is required, one of which is influenced by the applied control strategy. This paper proposes an optimal BES dispatch (OBD) control strategy that optimizes the power generation components’ sizing. The method examines the shortcomings of the other popular control strategies, such as load following, cycle charging, or combination. The optimization objectives are to minimize the Levelized Cost of Energy (LCOE) and maximize the renewable energy (RE) penetration, which can be achieved by prioritizing the BES to supply the load over other available generations and charge the BES every time the generator operates. The proposed method is implemented at two different systems with different load profiles. As a result, the proposed control strategy provides lower LCOE while maintaining higher RE penetration than the other control strategies in both locations.
Interest in DC microgrids is rapidly increasing along with the improvement of DC power technology because of its advantages. To support the integration process of DC microgrids with the existing AC utility grids, the form of hybrid AC/DC microgrids is considered for higher power conversion efficiency, lower component cost and better power quality. In the system, AC and DC portions are connected through interlink bidirectional AC/DC converters (IC) with a proper control system and power management. In the stand-alone operation mode of AC/DC hybrid microgrids, the control of power injection through the IC is crucial in order to maintain the system security. This paper mainly deals with a coordination control strategy of IC and a battery energy storage system (BESS) converter under stand-alone operation. A coordinated control strategy for the IC, which considers the state of charge (SOC) level of BESS and the load shedding scheme as the last resort, is proposed to obtain better power sharing between AC and DC subgrids. The scheme will be tested with a hybrid AC/DC microgrid, using the tool of the PSCAD/EMTDC software.
A hybrid alternate current/direct current (AC/DC) microgrid consists of an AC subgrid and a DC subgrid, and the subgrids are connected through the interlink bidirectional AC/DC converter. In the stand-alone operation mode, it is desirable that the interlink bidirectional AC/DC converter manages proportional power sharing between the subgrids by transferring power from the under-loaded subgrid to the over-loaded one. In terms of system security, the interlink bidirectional AC/DC converter takes an important role, so proper control strategies need to be established. In addition, it is assumed that a battery energy storage system is installed in one subgrid, and the coordinated control of interlink bidirectional AC/DC converter and battery energy storage system converter is required so that the power sharing scheme between subgrids becomes more efficient. For the purpose of designing a tracking controller for the power sharing by interlink bidirectional AC/DC converter in a hybrid AC/DC microgrid, a droop control method generates a power reference for interlink bidirectional AC/DC converter based on the deviation of the system frequency and voltages first and then interlink bidirectional AC/DC converter needs to transfer the power reference to the over-loaded subgrid. For efficiency of this power transferring, a linear quadratic regulator with exponential weighting for the current regulation of interlink bidirectional AC/DC converter is designed in such a way that the resulting microgrid can operate robustly against various uncertainties and the power sharing is carried out quickly. Simulation results show that the proposed interlink bidirectional AC/DC converter control strategy provides robust and efficient power sharing scheme between the subgrids without deteriorating the secure system operation.
12 September 2024 in Journal of Electrical Engineering & Technology
Renewable energy sources have become one of the important roles for sustainable energy development. One of the promising mechanisms to deploy renewable energy is through a Virtual Power Plant (VPP), which can integrate various distributed renewable energy resources into a single controllable and deployable entity. This paper examines the opportunity for VPP adoption in Indonesia, which investigates the minimum implementation criteria, provides a gap analysis for VPP implementation, and proposes recommendations for VPP implementation in Indonesia. The implementation criteria are obtained from the literature review, including the lessons learned from other countries, and categorized into four aspects: regulatory, technical, economic, and social. The gap analysis is performed by evaluating the current state of Indonesia’s utility network in correlation with the VPP minimum implementation criteria and then provides a scoring matrix for each criterion. Lastly, the recommendations are arranged to narrow these gaps, organized into ten key focus points, and divided into four phases, initiation, preparation, piloting, and deployment, across a ten-year timeframe.
30 September 2017 in International Journal of Fuzzy Logic and Intelligent Systems