Studies have been performed to improve the process of waste management. They were fulfilled by changing the base of waste logistics management using a combination of intelligent algorithms and the IMPACT IoT platform instead of a human factor. The research was carried out on the example of real data with respect to waste management in a given area. The proposed solution includes a program that simulates the filling of specific waste containers located in various areas. The determined aspects are inconveniences on the routes, affecting the time of moving between the receiving points and the distances between the containers. The variability of the speed and intensity of the containers filling up over time is an additional factor taken into account. The proposed methods yielded the performance of the control of the containers’ filling status in real time, which apparently results in the possibility of a reaction to the current demand just in time. The proposed solution enables the improvement of the waste logistics management process, including avoiding the too-frequent emptying of containers or overfilling them. The combination of the device prototype, the simulation program, and the developed algorithms opens the possibility for further research in the smart city and optimization areas.
1 March 2020 in Management Systems in Production Engineering
One of the rationalization areas is the material supply process. New tasks of material supply are: integration of supply with the operation of the entire system, especially at the product design stage, effective use of material resources, reduction of the level of supply costs from the point of view of production costs. in the conditions of unit and small batch production the materials requirement needs to be carefully planned and optimized due to the use of many different kinds, types and sizes of materials and dynamic changes of demand over time. In this situation there are needed tools enabling the measurement of production costs for particular tasks on the basis of currently realized processes. One of these tools is activity based costing which is a groundwork for decision making process in the material supply area. Basing on activity based costing, a model of materials requirements planning was developed, which considers minimizing the number of different kinds and sizes of materials by using alternative materials and, consequently, lowering production costs.
1 March 2019 in Management Systems in Production Engineering
On the stage of product design there is a problem concerning production cost estimation in the moment when elements are not yet definitely designed. Depending on the amount of the available information, more or less precise cost estimation methods are applied, i.e.: variant methods, generation methods, hybrid methods. The proposed method of cost estimation is based on a formalized description of information related to construction, manufacturing and organizational characteristics concerning the designed element, the automation method of technological processes design using methods of group technology and a model of determining production costs of machine elements based on Activity Based Costing.