The current structure of electricity production in Serbia is not sustainable and it is necessary to consider the possibilities of decarbonisation of electricity production in the future. Renewable energy sources are the only sustainable resource for implementing the decarbonisation strategy. This paper presents the results of research of the potential of solar and wind energy in the territory of the Republic of Serbia. The spatial depressiveness of these sources is presented and the energy potential is estimated for each region. Based on the available global databases, the potential was considered and the possible installed capacity and gross annual electricity production for each region were defined. It was concluded that the technically usable potential of wind energy in the territory of the Republic of Serbia (excluding Kosovo and Metohija) is about 11,500 MW, from which about 29.5 TWh of electricity could be produced annually. The technically usable solar potential in Serbia is estimated at about 24 GWp, of which about half is on roof surfaces. The estimated production of electricity from solar capacities is about 30.5 TWh per year.
An optimization model which determines optimal spatial allocation of wind (WPPs) and PV power plants (PVPPs) for an energy independent power system is developed in this paper. Complementarity of the natural generation profiles of WPPs and PVPPs, as well as differences between generation profiles of WPPs and PVPPs located in different regions, gives us opportunity to optimize the generation capacity structure and spatial allocation of renewable energy sources (RES) in order to satisfy the energy needs while alleviating the total flexibility requirements in the power system. The optimization model is based on least squared error minimization under constraints where the error represents the difference between total wind and solar generation and the referent consumption profile. This model leverages between total energy and total power requirements that flexibility resources in the considered power system need to provide in the sense that the total balancing energy minimization implicitly bounds the power imbalances over the considered time period. Bounding the power imbalances is important for minimizing investment costs for additional flexibility resources. The optimization constraints bound the installed power plant capacity in each region according to the estimated technically available area and force the total energy production to equal the targeted energy needs. The proposed methodology is demonstrated through the example of long-term RES planning development for complete decarbonization of electric energy generation in Serbia. These results could be used as a foundation for the development of the national energy strategy by serving as a guidance for defining capacity targets for regional capacity auctions in order to direct the investments in wind and solar power plants and achieve transition to dominantly renewable electricity production.
Wind power plants (WPP) and photovoltaic power plants (PVPP) have a relatively small average annual capacity factor (CF), so they require significantly larger installed power in comparison to thermal power plants which are phasing out in the process of decarbonizing electricity generation. On the other hand, transmission network (TN) needs to be dimensioned based on the maximal power a power plant (PP) injects into the electric power system (EPS). For this reason, massive WPP’s and PVPP’s connection requires new transmission capacities (transmission lines, switching stations and transformer stations) which will enable evacuation of their generating power. Due to the small CF of renewable energy sources (RES), transmission capacities are underutilized, which increases RES development costs, and thereby the price of the electrical energy generated by these sources also increases. The underloaded high voltage transmission lines bring surpluses in generated reactive power, which causes the emergence of overvoltages in transmission network and jeopardize system reliability. The development of TN has significant negative influence on the environment, first of all due to the space occupied by the corridors of high voltage transmission lines, but also due to the high voltage hazard and acustic and electromagnetic pollution. The complementarity of time profiles of these sources makes them suitable for the development of hybrid PPs, i.e. the integrated solar and WPPs which have a single point of connection (POC) to the TN. Such objects can be, both in technical and regulatory aspects, treated as a single PP which time generation profile corresponds to the sum of generating powers of PV systems and wind generators. These PPs have a relatively small number of hours during which the injected powers equal to the sum of installed powers of PV systems and wind generators occur because the probability of occurrence of strong winds at the same time as high insolations is small. This fact enables us to optimize the required injection power approved for the POC to significantly smaller value than the sum of installed powers on inverter terminals of photovoltaic systems and wind generators. This way utilization of TN infrastructure can be significantly improved in comparison to the independent operation of PVPP and WPP. The current regulation requires new RES PPs to install the balancing capacities which installed power and energy capacity depend on the approved power at the POC of the PP to the TN [1]. The development of hybrid wind-solar PPs can reduce the required approved connection power, and thereby the also the required balancing capacity of the PP which reduces specific costs of the PP development. In this paper, a model for optimizing the installed powers of WPP and PVPP for the given value approved power at the POC to the TN in order to achieve, for certain level of unused energy of the PP, the maximal total annual energy the PP injects into the network.
The regulatory framework for renewable energy sources integration into power system of Serbia requires the provision of balancing capacities in accordance with the approved installed power by the transmission system operator. Investors typically meet this requirement when developing wind farms projects by planning and constructing battery storage systems integrated with the power plant. However, forecasting errors in wind farm production often exceed the available power capacity of the battery storage system. Moreover, these errors can persistently exhibit either positive or negative values over an extended period, creating a critical condition in terms of the storage energy capacity. In this context, the key question is to what extent such planned balancing capacities can effectively meet the balancing needs of wind farms. This paper analyzes four existing wind farms in the South Banat region, for which historical data on forecasted and observed day-ahead production are available. The aim of the study is to assess the feasibility of self-balancing (covering the imbalance caused by the given power plant in the power system) for these wind farms through the integration of battery systems, in accordance with the current regulatory framework. Since these wind farms employ different forecasting models, quantitative indicators of imbalance reduction will be determined for each one, compared to the current state without a storage system. Additionally, an economic analysis will be carried out to evaluate the potential cost savings if these wind farms take on balancing responsibility. Finally, a theoretical model will be presented to evaluate the impact of wind farm balancing on battery system degradation rate over one year of operation and to estimate its lifespan. The results obtained from the analysis of real wind farms offer a dual benefit. From the investor’s perspective, the established indicators provide a basis for techno-economic analysis in the development of new wind farm projects that are subjected to balancing responsibility. On the other hand, for the transmission system operator, the results offer insights into the effectiveness of the current regulation framework in terms of reducing total balancing energy, average imbalance percentage error, and the maximum imbalance generated by the wind farms.
The integration of renewable energy sources (RES) changes the current concept of power system operation and planning. In addition to significant changes in topology and the emergence of new large centres of electricity production, which affect the change in the dominant directions of power flows, the impact on voltage profile in the power system is also changing in terms of the possibility of RES participation in voltage control. Today's inverter technologies and power electronics in RES systems allow them to participate in voltage control to help maintain grid voltage within acceptable limits and are designed to provide voltage support and reactive power control. Modern wind turbines are capable of operating in a wide range of reactive power generation/absorption at different active power setpoints, as well as in no-wind regimes, while modern PV systems are capable of providing voltage control support and reactive power control even in conditions of absence of the primary energy source. By controlling output voltage and reactive power, such systems can help maintain proper voltage values in the grid. This paper will present the results of the analysis of the impact of RES on the voltage profile of the Serbian transmission system, for a period of one year, with an hourly resolution. The analysis will be carried out for two scenarios: the existing state of the transmission system with already connected RES and the future/prospective state of the transmission system that includes future/planned projects of connection of RES to the transmission system. By comparing the results for these two scenarios, it is possible to determine the impact of RES on the voltage profile in all operating conditions of the transmission system and the possibility of RES participation in voltage control in the transmission system of Serbia.
The decarbonization process of electric energy generation in Serbia is primarily conditioned by coal reserves extinction and ecological problems related to coal combustion in thermal power plants, which requires to plan substitute capacites which could provide in the future the coal-fired thermal power plant generation in the actual power system of Serbia. The fundamental strategic assumption adopted in this paper is the maximization of the degree of energy independence, and this means that the Serbian electric energy generation system should be planned from national primary resources in the way that the energy exchange with the adjacent power systems is minimized. Under this assumption, a mathematical model is developed and an analysis is conducted regarding the optimal installed capacities of photovoltaic (PV) and wind power plants and their spatial dispersion for which the consumption covering in the Serbian electric power system is maximal for the specified degree of reduction of thermal power plants generation. Based on the defined profile of aggregated generation units and the consumption profile in the Serbian power system, the required balancing capacities in the power system of Serbia are defined for the specified decarbonization degree of electric energy generation.