Although mélanges are exciting, puzzling, and controversial to geologists, it is geopractitioners and contractors who must work with them to engineer the constructed works of Society. Geopractitioners include geotechnical engineers, geological engineers, engineering geologists, and rock engineers. Mélanges are the most intractable bimrocks (block-in-matrix rocks), complex geological mixtures composed of hard blocks of rocks surrounded by weaker matrix, and are famously exemplified by those within the Franciscan Complex of Northern California. Bimrocks also include olistostromes, weathered rocks, fault rocks, and lahars. The conventional characterization, design, and construction procedures used by geopractitioners for well-behaved stratified rocks and soils are not well suited to mélanges. The considerable engineering and construction difficulties related to mélanges burden Society to the extent that they can be considered “antisocial.” Case histories exemplify a recommended systematic procedure for characterization, design, and construction with mélanges. Geopractitioner approaches to characterizing California's chaotic Franciscan mélanges are applicable to geologists and geopractitioners working in fault zones, weathered rocks, lahars, and other bimrocks, and suggestions are offered for collaborative research between geologists and geopractitioners.
Serious deficiencies in ground characterization, analysis and design at engineering works can occur when working with bimrocks (block-in-matrix rocks) and bimsoils (block-in-matrix soils). Since the 1990s, serious technical problems at engineering works performed in bimrocks/bimsoils spurred practical research, which revealed that the behavior of these geomaterials is directly related to the volumetric block proportions (VBPs). However, the way that VBPs can be confidently and correctly estimated remains an ongoing critical issue that still frustrates designers, contractors and owners. Stereological techniques can be applied to overcome this challenge by inferring 3D block contents from in situ 1D and 2D measurements, but the estimates have often been demonstrated to be erroneous. This paper presents findings from a computer-aided reinvestigation, revalidation and extension of Medley’s work of 1997 and subsequent researchers to provide approachable yet statistically robust methods to limit the uncertainty associated with estimates of 3D VBPs generated from 1D boring/scanline measurements. To this aim, a specialized Matlab code was created and virtual drilling programs were performed through 3D computer-generated bimrock models. Supported by extensive statistical-based investigations, a design chart is provided that updates and extends Medley’s 1999 chart relating uncertainty in estimates of VBP as a function of total boring/scanline lengths.