Doaa Ahmed Abdel Naeem

Dr. Doaa Ahmed Abdel Naeem

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 March 2023 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
DNDoaa Ahmed Abdel Naeem
Doaa Ahmed Abdel Naeem
MGMohamed Gheith
Mohamed Gheith
AEAmr Eltawil
Amr Eltawil

3 December 2022 in Logistics
Verified
Journal Article
Open access
PDF file
DNDoaa Ahmed Abdel Naeem
Doaa Ahmed Abdel Naeem
AEAmr Eltawil
Amr Eltawil
JIJunichi Iijima
Junichi Iijima
MGMohamed Gheith
Mohamed Gheith
Background: The key performance index for the container terminals is the vessel berthing time which is highly affected by the scheduling of the different handling equipment. Proper integrated scheduling of the handling equipment is crucial, especially in automated container terminals, where all the handling equipment is automated and must be coordinated to avoid interference. One of the most challenging problems both scholars and terminal operators face is introducing a proper scheduling plan for different equipment, considering the buffer capacity of dual-trolley quay cranes (QCs) and the limited storage locations of import containers. Methods: A mathematical model is proposed to integrate the scheduling of automated yard cranes and automated guided vehicles (AGVs), considering the limited buffer capacity beneath dual-trolley QCs and the storage allocation of import containers. Results: different instances were solved to evaluate the proposed model’s performance and investigate the impact of using dual-trolley QCs instead of single-trolley QCs, and the impact of using different buffer capacities. Conclusions: The results show that the model provides detailed scheduling and assigning plans for the YCs and AGVs besides allocating import containers. Additionally, the dual-trolley QCs can significantly decrease the completion time and increase AGVs’ utilization compared to the single-trolley QCs.

23 April 2021
Verified
Conference Paper
Closed access
DNDoaa Ahmed Abdel Naeem
Doaa Ahmed Abdel Naeem
MGMohamed Gheith
Mohamed Gheith
AEAmr Eltawil
Amr Eltawil
Automated container terminals are more efficient than conventional terminals, as they lead to a remarkable decrease in the operational costs of human and equipment resources. However, since there is a lack in labor interference in the Automated Container Terminals (ACTs) as the equipment is controlled automatically, detailed scheduling and efficient planning of each piece of equipment is crucial to smoothly perform the various operations. Therefore, this paper proposes a Mixed Integer Programing model to consider the integrated schedule of Quay Cranes (QCs), Automated Guided Vehicles (AGVs) and Yard Cranes (YCs) to minimize the total waiting time of QCs and the number of needed AGVs, also the storage locations of import containers are determined.