Construction progress monitoring involves a set of inspection tasks with repetitive in-person observations on the site. The current manual inspection process in construction is time-consuming, inefficient and inconsistent mainly due to human limitations in the ability to persistently and accurately walkthrough the job site and observe the as-built status of which robots are considerably better. Enabling the process of visual inspection with a real-time and remote inspection capability using robots can provide more frequent and accessible construction progress data for inspectors to improve the quality of inspection and monitoring. Also, integrating remote inspection with an Augmented Reality (AR) platform can help the inspector to verify as-planned BIM data with the as-built status. This paper proposes a new approach to perform remote monitoring of the construction progress in real-time using a quadruped robot and an AR solution. The proposed computational framework in this study uses a cloud-based solution to integrate the quadruped robot’s control for remote navigation through the construction site with 360° live-stream video of the construction status, as well as a real-time AR solution to visualize and compare the as-built status with as-planned BIM geometry. The implementation of the proposed framework is discussed, and the developed framework is evaluated in two use cases through experimental investigations.
Owners of multiple facilities who maintain large capital portfolios are challenged with efficient maintenance to streamline operational processes and costs. Clearly defined and structured information documentation standards are needed before a project even starts to develop appropriate as-built documentation to support postconstruction operations. This paper documents a case study of a large educational institution that is exploring methods for adopting a building information model (BIM) for facility management (FM) approach for information management as a way to overcome inefficiencies in its current information processing methods. A multiphase process has been used in the development of a proposed BIM-based solution. This paper presents the data needs analysis that has been conducted with the first phase of the research project. The preliminary data capture and documentation methods are discussed in terms of a spreadsheet-based methodology that allows for easily identifying and tracking sources of information. A pilot study is also discussed that was used to validate the information needs and overall process. Future research steps of converting the spreadsheet-based methodology into a model-based approach allowing the FM department to directly link a BIM to its computerized maintenance and management system (CMMS) are also included. Specific challenges and lessons learned in the information collection process are also discussed in terms of how they have affected the overall process development.
1 January 1997 in Journal of Computing in Civil Engineering
Current intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC—Space-Constrained and Resource-Constrained knowledge-based system—for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
28 February 2023 in Journal of Information Technology in Construction
Changes in the local and global markets are forcing A/E/C/FM (Architecture, Engineering, Construction, and Facility Management) organizations to deliver more robust and innovative operational BIMs (Building Information Models). It is hypothesized that BIMs will transform from a static 3D model to a Digital Twin providing a truly digital representation of the physical asset or the building it represents. This transformation to a dynamic Digital Twin will allow the A/E/C/FM industry to visualize, monitor, and optimize operational assets and processes to support better inspection and analysis for a more efficient facility operations and maintenance. To support the adoption and implementation of Digital Twin in A/E/C/FM, the authors have defined two clear objectives. First, we discuss requirements for a functionality-based canonical architecture to create a digital twin followed by proposing two tool-based system architecture options for its implementation. Second, we use a case study approach to develop a proof-of-concept Digital Twin of an operating room in a healthcare facility using Power BI Desktop and Azure Services. The prototype aims to monitor room air quality as per INAIL (National Institute for Insurance against Accidents at Work) and ISO (International Organization for Standards) standards. Multiple sensors connected to a Raspberry Pi 4 are used to capture real-time data for various air quality parameters including temperature, humidity, airflow, particulate contamination, and Nitrous Oxide (N2O) gas. Multiple dashboards are also created to visualize, monitor, and analyze the data harnessed from the OR sensors. The implementation addresses critical issues including security, data storage, visualization, processing, data streaming, collection, and analysis. As an initial validation, the Digital Twin prototype was presented and discussed with a healthcare BIM manager. Initial feedback from the industry expert indicated that the prototype could decrease the required time to respond to facility maintenance issues such as decreased air flow due to possible obstructions.
1 January 2022 in Organization, Technology and Management in Construction: an International Journal
Facility management (FM) requires multidisciplinary activities, and thus has extensive information requirements. Much of that information is created during the design, construction, and commissioning phases of a project. Providing the owner of a facility with usable life cycle asset information after construction has been a challenge to the industry. Traditional methods of manually inputting data into FM systems are time consuming and error prone. Various automated approaches and workflows continue to be developed to respond to specific owner needs. This research developed a unique workflow that uses Dynamo within Revit to automatically extract asset management data from the model and export the data to a proprietary format required by the facility owner. The formatted spreadsheet allows for direct linking of the data to the owner's FM system, hence eliminating time wasted in manual data entry and avoiding missing any maintenance cycles that would result if the FM system is not populated with critical information in a timely manner. This article utilizes a case study approach to demonstrate this novel Dynamo workflow. The required case study asset data identified and captured include asset groups, their properties and attributes, and corresponding metadata. A basic three-dimensional representation of the facility and all its equipment are modeled in Revit and asset data are input to corresponding model elements. This article also describes the complexity of the owner's proprietary information needs and the resulting automated workflow that extracts and exports data from Revit into an Excel format that can directly link into the FM system.