Mahnaz Ensafi

Dr. Mahnaz Ensafi


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 November 2022 in Buildings
Verified
Journal Article
Open access
PDF file
SHSrijeet Halder
Srijeet Halder
KAKereshmeh Afsari
Kereshmeh Afsari
JSJohn Serdakowski
John Serdakowski
SDStephen DeVito
Stephen DeVito
MEMahnaz Ensafi
Mahnaz Ensafi
WTWalid Thabet
Walid Thabet
Construction progress monitoring involves a set of inspection tasks with repetitive in-person observations on the site. The current manual inspection process in construction is time-consuming, inefficient and inconsistent mainly due to human limitations in the ability to persistently and accurately walkthrough the job site and observe the as-built status of which robots are considerably better. Enabling the process of visual inspection with a real-time and remote inspection capability using robots can provide more frequent and accessible construction progress data for inspectors to improve the quality of inspection and monitoring. Also, integrating remote inspection with an Augmented Reality (AR) platform can help the inspector to verify as-planned BIM data with the as-built status. This paper proposes a new approach to perform remote monitoring of the construction progress in real-time using a quadruped robot and an AR solution. The proposed computational framework in this study uses a cloud-based solution to integrate the quadruped robot’s control for remote navigation through the construction site with 360° live-stream video of the construction status, as well as a real-time AR solution to visualize and compare the as-built status with as-planned BIM geometry. The implementation of the proposed framework is discussed, and the developed framework is evaluated in two use cases through experimental investigations.

18 June 2022 in Buildings
Verified
Journal Article
Open access
PDF file
AHAshit Harode
Ashit Harode
MEMahnaz Ensafi
Mahnaz Ensafi
WTWalid Thabet
Walid Thabet
Facility lifecycle data captured in BIM during design and construction are very valuable for effective facility operations and maintenance. Traditionally, model authoring and analysis tools have been used to search and query model information. These tools are not well designed to search and display needed data and they require a steep learning curve. In this paper, the authors propose the use of Power BI dashboards to facilitate easy access and display of lifecycle data embedded in the model. The implementation and use of dashboards for facility management are discussed using a case study. The effectiveness and usability of the dashboards are validated using a focus group of six industry experts that were first interviewed then asked to complete a questionnaire. Feedback from interviews indicated that customized dashboards are effective tools to view, analyze and draw insights on data from various sources and can improve facility operations and management. Numerical results from the PSSUQ using fourteen questions indicated positive responses overall with an average score of four or five from the majority of respondents. Finally, the authors tested integration of the Power BI dashboards with the HoloLens 2 to deliver relevant up-to-date facility lifecycle data in near real-time to field staff.

18 April 2024 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
MEMahnaz Ensafi
Mahnaz Ensafi
WTWalid Thabet
Walid Thabet
XGXinghua Gao
Xinghua Gao
Journal of Information Technology in Construction

30 January 2024 in Facilities
Verified
Journal Article
Closed access
MEMahnaz Ensafi
Mahnaz Ensafi
WTWalid Thabet
Walid Thabet
Deniz BesiktepeDeniz Besiktepe
Deniz Besiktepe
The aim of this paper was to study current practices in FM work order processing to support and improve decision-making. Processing and prioritizing work orders constitute a critical part of facilities and maintenance management practices given the large amount of work orders submitted daily. User-driven approaches (UDAs) are currently more prevalent for processing and prioritizing work orders but have challenges including inconsistency and subjectivity. Data-driven approaches can provide an advantage over user-driven ones in work-order processing; however, specific data requirements need to be identified to collect and process the functional data needed while achieving more consistent and accurate results. This paper presents the findings of an online survey conducted with facility management (FM) experts who are directly or indirectly involved in processing work orders in building maintenance. The findings reflect the current practices of 71 survey participants on data requirements, criteria selection, rankings, with current shortcomings and challenges in prioritizing work orders. In addition, differences between criteria and their ranking within participants’ experience, facility types and facility sizes are investigated. The findings of the study provide a snapshot of the current practices in FM work order processing, which aids in developing a comprehensive framework to support data-driven decision-making and address the challenges with UDAs. Although previous studies have explored the use of selected criteria for processing and prioritizing work orders, this paper investigated a comprehensive list of criteria used by various facilities for processing work orders. Furthermore, previous studies are focused on the processing and prioritization stage, whereas this paper explored the data collected following the completion of the maintenance tasks and the benefits it can provide for processing future work orders. In addition, previous studies have focused on one specific stage of work order processing, whereas this paper investigated the common data between different stages of work order processing for enhanced FM.