Energy situation in Malawi is continuing facing critical challenges to satisfy the existing demand. However, energy consumption and energy conservation studies have been neglected to help overcome this problem. In this paper, electric energy audit was conducted for a commercial building in Mchinji, Malawi, in order to identify energy-saving opportunities. The study employed a mixed method research which involved a series of surveys, observation, data collection, and analysis. The current energy consumption was determined and compared with the proposed energy consumption after replacing some equipment. The proposed system saved up to 33.46% of energy. The study also suggested behavior change towards energy saving. Additionally, an alternative energy system was also suggested. Thus, the HOMER software was employed to design, optimize, and analyze a solar-battery-grid-connected energy system. The proposed system has a simple payback period of 9.8 years. The system’s cost of energy was estimated as 0.0372 $/kWh, and the capital cost was $ 150,887.
Lao PDR faces seasonal power supply problems due to its heavy reliance on hydropower. Thus, the aim of this paper was to prioritize renewable energy (RE) resources for sustainable electricity generation in Lao PDR using the analytic hierarchy process (AHP) method, and to further estimate the energy available for the prioritized RE to enhance the seasonal power supply. Four RE alternatives were assessed considering technological, economic, environmental, and social criteria with twelve overall sub-criteria. The results indicated that hydropower was the most highly prioritized alternative, followed by solar. The resulting weights of the RE prioritization were in agreement with the Lao energy policy and plan. In order to address the seasonal power supply problem, setting-up floating photovoltaic (FPV) units in the existing hydropower reservoirs was proposed. The FPV potential was estimated, and the results revealed that the predicted power demand by 2030, as calculated in the latest Lao national power development strategy, could be fully covered by integrating the FPV output from 10% coverage of the water surface in four existing hydropower reservoirs with the existing power supply in 2020. The proposed FPV technology would provide a solution to enhance the seasonal power supply and reduce the power import.