Isabelle Viole

Ms. Isabelle Viole


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 February 2025 in Astronomy & Astrophysics
Verified
Journal Article
Open access
PDF file
TMTony Mroczkowski
Tony Mroczkowski
PGPatricio A. Gallardo
Patricio A. Gallardo
MTMartin Timpe
Martin Timpe
AKAleksej Kiselev
Aleksej Kiselev
MGManuel Groh
Manuel Groh
TZThomas Zimmerer
Thomas Zimmerer
The (sub)millimeter sky contains a vast wealth of information that is both complementary and inaccessible to other wavelengths. Over half the light we receive is observable at millimeter and submillimeter wavelengths, yet we have mapped only a small portion of the sky at sufficient spatial resolution and sensitivity to detect and resolve distant galaxies or star-forming cores within their large- scale environments. For decades, the astronomical community has highlighted the need for a large, high-throughput (sub)millimeter (λ ~ 0.35–10 mm) single dish. The Atacama Large Aperture Submillimeter Telescope (AtLAST), with its 50-m aperture and 2° maximal field of view, aims to be such a facility. We present here the preliminary design concept for AtLAST, developed through an EU Horizon 2020-funded design study. Our design approach begins with a long lineage of (sub)millimeter telescopes, relies on calculations and simulations to realize the optics, and uses finite element analysis to optimize the conceptual designs for the mechanical structure and subsystems. The demanding technical requirements for AtLAST, set by transformative science goals, have motivated the design effort to combine novel concepts with lessons learned from previous efforts. The result is an innovative rocking chair design with six instrument bays, two of which are mounted on Nasmyth platforms, inside a large receiver cabin. Ultimately, AtLAST aims to achieve a surface accuracy of a ≤20 µm root mean square half wavefront error, corresponding to the goal of a Ruze efficiency of >50% at 950 GHz. We conclude that a closed-loop metrology of the active primary surface will be required to achieve our surface accuracy goal. In the next phase of the project, we shall prototype and test such a metrology on existing platforms, with the goal of delivering a mature, construction-ready design by the end of this decade.

31 July 2023 in Energy
Verified
Journal Article
Open access
IVIsabelle Viole
Isabelle Viole
GVGuillermo Valenzuela-Venegas
Guillermo Valenzuela-Venegas
MZMarianne Zeyringer
Marianne Zeyringer
Sabrina SartoriSabrina Sartori
Sabrina Sartori

30 August 2024 in International Journal of Hydrogen Energy
Verified
Journal Article
Open access
CCC. Cheng
C. Cheng
KGK. van Greevenbroek
K. van Greevenbroek
IVIsabelle Viole
Isabelle Viole

11 October 2024 in Nature Sustainability
Verified
Journal Article
Closed access
PDF file
GVGuillermo Valenzuela-Venegas
Guillermo Valenzuela-Venegas
MLMaria Luisa Lode
Maria Luisa Lode
IVIsabelle Viole
Isabelle Viole
AFAlex Felice
Alex Felice
AAAnder Martinez Alonso
Ander Martinez Alonso
MZMarianne Zeyringer
Marianne Zeyringer

9 May 2024 in The International Journal of Life Cycle Assessment
Verified
Journal Article
Open access
PDF file
IVIsabelle Viole
Isabelle Viole
LSLi Shen
Li Shen
LCLuis Ramirez Camargo
Luis Ramirez Camargo
MZMarianne Zeyringer
Marianne Zeyringer
SSSabrina Sartori
Sabrina Sartori
Purpose: Supplying off-grid facilities such as astronomical observatories with renewable energy–based systems (RES) instead of diesel generators can considerably reduce their environmental impact. However, RES require oversized capacities to counter intermittency and comply with reliability requirements, hence shifting the environmental impact from operation to construction phase. We assess whether 100% RES scenarios are favorable from an environmental point of view and discuss the trade-offs in systems with backup fossil generators versus 100% renewable ones. Methods: In this comparative life cycle assessment (LCA), we study various RES supply systems to power a new telescope in the Atacama Desert, Chile. We compare six setups, including 100% RES scenarios, namely, photovoltaics (PV) with batteries and hydrogen energy storage; high-renewable scenarios, with fossil fuel power generation next to RES and storage; and a system combining PV with diesel generation. We base system sizing on a techno-economical optimization for the start of operation in 2030. Foreground data stem from life cycle inventories of RES components since 2015 and 2030 electricity mix assumptions of production countries. We assess environmental impact in the categories climate change, mineral resource depletion, and water use. Results and discussion: We find that 100% RES and high-renewable scenarios result in emissions of 0.077–0.115 kg CO2e/kWh supplied, compared to 0.917 kg CO2e/kWh in the reference case with solely diesel generation. One hundred percent RES scenarios have a lower CO2e impact than high-renewable scenarios. However, the latter lower the mineral resource depletion and water use by about 27% compared to 100% RES scenarios. Applying hybrid energy storage systems increases the water use impact while reducing the mineral resource depletion. Conclusions: None of the six energy systems we compared was clearly the best in all environmental impacts considered. Trade-offs must be taken when choosing an energy system to supply the prospective off-grid telescope in Chile. We find high-renewable systems with some fossil generation as the better option regarding power reliability, mineral resource depletion, and water use, while inducing slightly higher greenhouse gas emissions than the 100% RES scenarios. As remote research facilities and off-grid settlements today are mainly supplied by fossil fuels, we expect to motivate more multifaceted decisions for implementing larger shares of RES for these areas. To advance the LCA community in the field of energy systems, we should strive to incorporate temporal and regional realities into our life cycle inventories. To ease the path for upcoming studies, we publish this work’s inventories as detailed activity level datasets.

6 May 2024 in Applied Energy
Verified
Journal Article
Open access
IVIsabelle Viole
Isabelle Viole
GVGuillermo Valenzuela-Venegas
Guillermo Valenzuela-Venegas
Sabrina SartoriSabrina Sartori
Sabrina Sartori
MZMarianne Zeyringer
Marianne Zeyringer