Several fire risk evaluation, fire tracking, and fire response resources are available. The risk metrics and fire response programs are sometimes modified to include a power system context. The risk metrics often evaluate the risk of fires causing power system faults or outages, especially on transmission systems. The response programs are modified to ensure the safety of power system equipment and first responders as well as to coordinate power system outages to both ensure safety during an active fire and prevent fire ignition during high risk periods. Although some aspects of wildfire responses have been adapted to include power system concerns, adaptations to power system operations and maintenance to include wildfire risks and responses are still nascent. In particular, a risk metric that evaluates the potential for power system components to ignite wildfires is needed to help guide power system upgrade efforts and power system fire safety measures. This document serves as a brief literature review of wildfire risk metrics and response programs and how they relate to power systems. It also includes a proposed risk metric and structure for describing the risk of a power system component igniting a fire.
This work describes the Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI) architecture for the co-simulation of distribution and transportation systems to evaluate EV charging impacts on electric distribution systems of a large metropolitan area and the surrounding rural regions with high fidelity. The current co-simulation is applied to Oakland and Alameda, California, and in future work will be extended to the full San Francisco Bay Area. It uses the HELICS co-simulation framework to enable parallel instances of vetted grid and transportation software programs to interact at every model timestep, allowing high-fidelity simulations at a large scale. This enables not only the impacts of electrified transportation systems across a larger interconnected collection of distribution feeders to be evaluated, but also the feedbacks between the two systems, such as through control systems, to be captured and compared. The findings are that with moderate passenger EV adoption rates, inverter controls combined with some distribution system hardware upgrades can maintain grid voltages within ANSI C.84 range A limits of 0.95 to 1.05 p.u. without smart charging. However, EV charging control may be required for higher levels of charging or to reduce grid upgrades, and this will be explored in future work.
29 May 2024 in International Journal of Electrical Power & Energy Systems
Adding energy storage capacities equivalent to several hours of demand can lower operating costs of independent power providers and reduce reliance on the regional utility network. Energy storage compounds the mixed-integer unit commitment problem by coupling the scheduling decisions within the dispatch horizon, making otherwise straightforward problems highly computationally intensive. A sufficiently trained artificial neural network (ANN) can altogether void the mixed-integer unit-commitment problem and facilitate dispatch receding horizon control in applications with significant energy storage assets. Neural networks with varying layers are trained to replicate the optimal binary unit commitment status of the micro-grid generators as determined by a non-linear mixed integer solver. The combined approach proposed uses an ANN to determine the unit-commitment solution and quadratic programming to determine the active generation and storage set points. The accuracy in replicating the mixed-integer unit commitment exhibits depreciating improvement with additional network layers. The single layer ANN reduced dispatch time by a factor of 40 while replicating unit commitment with 95.3% accuracy. A two-layer ANN reduces dispatch time by a factor of 20 with a 97.3% accuracy.