Yunhong Lin

Prof. Yunhong Lin

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 November 2022 in Water
Verified
Journal Article
Open access
PDF file
XWXiaorui Wang
Xiaorui Wang
JXJian-Hang Xiao
Jian-Hang Xiao
TZTao Zhang
Tao Zhang
YLYunhong Lin
Yunhong Lin
Rainfall usually leads to soil slope sliding and instability, which affects the safety of foundation pit, especially in the case of heavy rainfall. This study took the 7.20 Henan rainstorm as the background, where in the process of construction, after three days of rainstorm of 617.7 mm deep, the horizontal displacement of supporting structures of a foundation pit in Zhengzhou city increased by 6.3 mm. Therefore, it is of great significance to study the mechanism of deformation induced by rainstorm of foundation pits. Five numerical models considering different rainfall factors were developed to simulate the rainstorm process based on the monitoring data. The deformation mechanism and the effect factors of deformation on the foundation pit during rainstorm were analyzed, and some preventive measures were put forward for when the foundation pit engineering faces a heavy rainstorm. Under the action of the rainstorm, the supporting structure and the surface settlement had a signification deformation caused by the heavy rainfall on this typical foundation pit, and the maximum bending moment and maximum displacement of the supporting structure shifted up to different degrees. The main factors affecting the deep foundation pit of the metro by heavy rain are the steel strut falling off and the whole foundation pit filling with water, while the influence caused by the rise in the groundwater level, water standing load, and soil softening is small.

8 May 2024 in Buildings
Verified
Journal Article
Open access
PDF file
ZLZhenfeng Li
Zhenfeng Li
XYXiaoxiao Yang
Xiaoxiao Yang
SZShuai Zhang
Shuai Zhang
YYYao Yu
Yao Yu
YLYunhong Lin
Yunhong Lin
JWJiacheng Wu
Jiacheng Wu
Current challenges in collecting and analyzing subway vibration data include the absence of standardized data collection methods, limitations in data analysis techniques, and an unclear understanding of the effects of geological conditions on vibrations. This study investigated vertical vibrations of tunnel walls and the ground above tunnels under different geological conditions of soft soil and rock strata at horizontal distances of 0, 15 m, and 30 m from the tunnel center line during train passages. The collected data underwent Fourier transformation and 1/3 octave processing to extract spectral characteristics and analyze transmission losses across different frequency bands. Our findings revealed two vibration peaks in the transmission process for both soft soil and rock formation geology. Specifically, high-frequency vibrations in soft soil experienced greater attenuation when transmitted from the tunnel wall to the ground at 0 m, while low-frequency vibrations in rock formations showed greater attenuation. We also observed a vibration amplification phenomenon at 15 m under soft soil geology conditions. Although low-frequency vibrations below 12.5 Hz showed slight attenuation within a 30 m test distance under both geological conditions, vibrations above 40 Hz experienced significant attenuation. These results offer valuable insights for reducing vibrations in subway superstructures and planning subway lines under diverse geological conditions. Furthermore, this study serves not only as a basis for mitigating vibrations in metro spans and designing metro lines in various geological contexts but also establishes a scientific foundation for future research.

13 November 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YLYunhong Lin
Yunhong Lin
QJqianqian Jin
qianqian Jin
QZQirui Zhang
Qirui Zhang
JYJinghui Yang
Jinghui Yang
Tunneling under existing underground buildings has become a common issue in densely populated urban areas. The current elastic analysis for ground displacement from new tunnel construction focuses on circular tunnels. However, theoretical analysis for non-circular chamber excavations is lacking. This paper aims to develop an elastic analysis for ground deformation from non-circular chamber excavations using the ‘equivalent radius’ theory, Verruijt’s formula, and Park’s model. It adjusts the ellipticization parameter δ and uniform radial displacement ε in Verruijt’s formula. Additionally, equivalent stiffness values for diverse existing hollow structures are considered using various approaches. A comparison of the theoretical results from field measurements and simulations shows the modified equations predict ground deformation well. Finally, parametric analysis explores the impacts of non-circular cavern excavations on existing structures under different factors.

3 March 2023 in Water
Verified
Journal Article
Open access
PDF file
XWXiaorui Wang
Xiaorui Wang
XLxu liu
xu liu
YLYunhong Lin
Yunhong Lin
Fei TanFei Tan
Fei Tan
Small curved metro shield tunnels located in fine sand layers are sensitive to the response of horizontal and vertical cyclic loads from train operations, especially for centrifugal horizontal loads. The majority of Zhengzhou’s strata are dominated by this geological composition. Therefore, the dynamic response of the fine sand layer under the train vibration load will lead to the settlement of the sand layer, which brings great hidden danger to the train operation. Long-term pore water monitoring was carried out in this paper, and the use of MIDAS-GTS (Multi-candidate Iterative Design with Adaptive Selection) finite element calculation platform to establish the metro ballast-lining-soil coupling dynamic model for mutual verification. The variation patterns of pore water pressure and super pore water pressure during train operation and the vibration response pattern of the soil layer around the tunnel were investigated. The results suggest that: (1) The pore and excess pore water pressures generated at the start of vibration are not easily dissipated and transferred, making them larger in the early stages of train operation. In contrast, the fine-grained powdered sandy soil has a small amount of clay particles, giving strength and cohesion to the soil layer. Vibrating hole pressure and excess pore water pressure stabilize with the train at a later stage; (2) The low probability of liquefaction in the silt layer surrounding the tunnel; (3) Under vibrating loads, areas of significant soil settlement are concentrated on the soil surface, on the upper side of the tunnel in the silty sand layer and at the bottom 3 m of the tunnel, however, its low variation in settlement has a low impact on the tunnel.

7 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
LSLijuan Sun
Lijuan Sun
QZQilong Zhao
Qilong Zhao
LLLianjie Liu
Lianjie Liu
LMLiyong Ma
Liyong Ma
KZKehang Zhou
Kehang Zhou
MOMaolin Ouyang
Maolin Ouyang
In recent years, the pipe shed advanced support method has emerged as a new technique for excavating tunnels in weak surrounding rock. However, the necessity to maintain a certain inclination angle when constructing large pipe sheds unavoidably increases the excavation and lining quantities. Consequently, as the length of the pipe shed increases, construction errors also grow, resulting in larger excavations and backfilling works, thereby making it difficult to control the quality of pipe shed installations and limiting the development of the pipe shed method. Faced with the challenges presented by tunnel support construction as part of subway tunnel construction, this paper is based on the Songhuai Youyuan Station tunnel project involving Zhengzhou Metro Line 9. Field experiments were conducted, using high-torque horizontal drilling machines and pipe shed guiding technology to successfully complete the installation of a 208 m long pipe shed in a single operation (the longest in the world). Through case analysis and technological innovation, a feasible and effective drilling technology scheme was proposed. Compared with traditional methods, the key technology for installing super-long pipe sheds in a single operation reduced the construction time by 35% and construction costs by 25%, providing valuable insights for similar projects.

14 March 2025 in Frontiers in Earth Science
Verified
Journal Article
Open access
PDF file
YLYunhong Lin
Yunhong Lin
GCGuoxu Cao
Guoxu Cao
XGXiaodong Guo
Xiaodong Guo
The shield crossing an anchor cable zone can cause the anchor cable to wrap around the cutter, creating construction problems. To address this issue, we developed an improved cutterhead technology for the shield machine which was successfully used during the Zhengzhou Metro Line four tunnel project that crossed a large anchor cable zone. Our research outlines the technology’s configuration and provides a detailed analysis of the tunneling parameters in the anchor cable section. This innovative technology directly cuts anchor cables during construction and improves both the shield machine and tunneling parameters.