Luis Mayo-Alvarez

Dr. Luis Mayo-Alvarez

Escuela de Posgrado, Universidad Tecnológica del Perú, Lima, Peru
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 November 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
Luis Mayo-AlvarezLuis Mayo-Alvarez
Luis Mayo-Alvarez
Aldo Alvarez-RiscoAldo Alvarez-Risco
Aldo Alvarez-Risco
Shyla Del-Aguila-ArcentalesShyla Del-Aguila-Arcentales
Shyla Del-Aguila-Arcentales
MSM. CHANDRA SEKAR
M. CHANDRA SEKAR
JYJaime A. Yañez
Jaime A. Yañez
Successful project management depends on ensuring the project’s objectives. Within these objectives, technical success is associated with achieving the expectations of the project baseline. The baseline of the project is made up of the definition of the scope (WBS), time (schedule) and costs (S curve) of the project. Directly, the project is expected to be technically successful if it manages to deliver its full scope on schedule and without associated cost overruns. Baseline performance management is how project managers track and control the progress of deliverables, timelines and associated costs. In a traditional approach, for waterfall-type projects that use the critical path paradigm, the baseline performance management tool par excellence is earned value management (EVM). Earned value management, in practice, works well when project costs are monitored and controlled; however, applying this approach to measure the status of the schedule presents serious inconsistencies. Over the last several decades, different variations of the original earned value have been developed to overcome some of these inconsistencies when used to measure project schedule status. Within these variations, we have the critical path earned value; the work in progress earned value; the critical path earned value and the work in progress; the earned schedule; and the critical path earned schedule. Each of these proposals tries to address some weakness of the original earned value management applied to time monitoring and control, for example, considering critical tasks as a focus on monitoring the progress of the schedule, solving the problem of task recognition late finishers, reporting schedule variances in time units and measuring adherence to the project’s schedule (P factor). Due to the exposed situation, it is necessary to determine which alternative of the versions of the original earned value is the most appropriate for the management of the project schedule, considering that there are several evaluation criteria that must be considered. In the present research, a systematic review and comparison of EVM and its variations for measuring project baseline schedule performance are performed to determine the most suitable methods for monitoring and controlling the project baseline schedule. For this purpose, the analytic hierarchy process (AHP) is used, and five comparison criteria are considered: schedule variation focused on critical tasks, recognition and measurement of the delay of tasks that finish late, schedule variation in time units, measurement of schedule adherence (P factor) and software support and development. The result of the AHP performed for comparing the methods shows that the best method for monitoring and controlling the project baseline schedule is the critical path earned schedule because it behaves adequately in comparison with the other methods for the evaluated comparison categories.

11 March 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
Luis Mayo-AlvarezLuis Mayo-Alvarez
Luis Mayo-Alvarez
MGMario Galván-Ávila
Mario Galván-Ávila
EQEnrique Quesquén-Fernández
Enrique Quesquén-Fernández
ÁUÁlvaro Uribe-Heredia
Álvaro Uribe-Heredia
Over the last decade, prefabrication has emerged as a strategic alternative to address the global construction industry’s challenges concerning sustainability, productivity, and the housing deficit. This study analyzes the advances, benefits, limitations, and research gaps associated with its application in real estate projects between 2015 and 2025. A systematic literature review was conducted under the PRISMA protocol, which allowed for the selection of 58 high-quality articles sourced from Scopus, Web of Science, SciELO, and Redalyc. The findings highlight Asia as the leader in innovation and industrialization, while Latin America is identified as an emerging region with applications in social housing, education, and modular infrastructure. Reported benefits include reduced time and costs, improved environmental performance, and the integration of digital technologies such as BIM, 3D printing, and digital twins. Nevertheless, regulatory gaps, cultural resistance, and limited coordination among industry, government, and academia persist. The study concludes that prefabrication constitutes a transformative engine for the real estate sector, but its consolidation requires stronger regulatory frameworks, broader empirical research in Latin America, and the adoption of circular economy and digitalization strategies to ensure a sustainable and socially accepted impact.

18 February 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Luis Mayo-AlvarezLuis Mayo-Alvarez
Luis Mayo-Alvarez
ÁAÁlvaro Apaza-Surco
Álvaro Apaza-Surco
WQWalter Quispe-Bellido
Walter Quispe-Bellido
JPJiulliana Paredes-Soria
Jiulliana Paredes-Soria
The adoption of Lean Construction has become established as an effective strategy for improving efficiency and reducing waste in construction projects; however, its implementation faces numerous challenges. The objective of this study is to analyze, through a systematic literature review, the critical factors that influence the implementation of Lean Construction, based on the analysis of 52 articles published between 2015 and 2025. The search was conducted in the Scopus database, and the selection of studies followed the PRISMA methodology. The results are organized into six key aspects that influence the execution of construction projects, grouped into three main categories: human, which includes managerial (42.3%) and educational (21.2%) factors; technical, which encompasses technological (23.1%) and safety (5.8%) factors; and management-related factors, comprised of financial (1.9%) and logistical (5.8%) factors. The evidence shows a greater relevance of human-related factors, followed by associated technical factors and, to a lesser extent, management-related factors. Taken together, these results highlight the need to address these factors through integrated strategies, training programs, and committed leadership to achieve a successful and sustainable implementation of Lean Construction.

1 April 2026 in Designs
Verified
Journal Article
Open access
PDF file
Luis Mayo-AlvarezLuis Mayo-Alvarez
Luis Mayo-Alvarez
JCJorge Córdova-Maraví
Jorge Córdova-Maraví
DGDiego García-Gómez
Diego García-Gómez
IPIván Paredes-Julca
Iván Paredes-Julca
Lean Construction has become a key strategy for improving productivity, reducing waste, and increasing efficiency in civil engineering projects. In parallel, advances in digital technologies have transformed the way engineering design and project planning processes are conceived and managed. However, there remains a limited systematic understanding of how emerging technologies support engineering design practices and influence the implementation and performance of Lean Construction in diverse civil engineering scenarios. This study presents a systematic literature review of 70 peer-reviewed articles published between 2019 and 2025, following the PRISMA 2020 guidelines. The selected studies were examined using a structured classification framework consisting of three analytical categories: Technologies and Tools, Construction Methods and Sustainability, and Production Philosophies and Management. From an engineering design perspective, this framework allows the identification of technological trends, design-support tools, and management strategies that influence the planning, modeling, and optimization of construction processes. The results show that digital technologies, such as Building Information Modeling (BIM), automation systems, Artificial Intelligence, and Industry 4.0 tools, play a significant role in supporting engineering design activities by improving project visualization, coordination, and decision-making during the design and planning stages. These technologies contribute to more integrated design processes aligned with Lean Construction principles. At the same time, the analysis reveals that the adoption of Lean Construction technologies varies depending on project characteristics, levels of digital maturity, and regional industry conditions. The main barriers identified in the literature include interoperability limitations, insufficient workforce training, and organizational resistance to technological change. Overall, the review provides a structured synthesis of recent research trends and highlights the technological and managerial factors that influence the successful integration of Lean Construction with engineering design practices in civil engineering. The findings contribute to bridging the gap between technological innovation, design methodologies, and Lean Construction implementation, offering insights for both researchers and practitioners seeking to improve efficiency, sustainability, and design performance in construction projects.

18 December 2022 in Processes
Verified
Journal Article
Open access
PDF file
Shyla Del-Aguila-ArcentalesShyla Del-Aguila-Arcentales
Shyla Del-Aguila-Arcentales
Aldo Alvarez-RiscoAldo Alvarez-Risco
Aldo Alvarez-Risco
MRMercedes Rojas-Osorio
Mercedes Rojas-Osorio
Hugo Meza PerezHugo Meza Perez
Hugo Meza Perez
GRGloria Rojas-Cangahuala
Gloria Rojas-Cangahuala
JYJaime A. Yáñez
Jaime A. Yáñez
Mixed martial arts (MMA) has always been surrounded by controversy due to the unusual muscle development of its participants, so it is crucial to know the strategies that have been implemented to reduce doping cases. The main purpose of this paper is to describe the various cases of doping detected by USADA in UFC MMA participants. In addition, strategies that are being developed to reduce cases of positive doping are proposed. From the UFC USADA database, doping cases were extracted, obtaining the substance or substances involved; the formula, physiological effect and the athletes involved; the dates of the sampling; if it was out of competition or in-competition and the sanction time. The substances that were most involved were found to be Ostarine (22), Clomiphene (9), Diuretics (10) and Stanozolol (9). Some sanctions were diminished because they were treated with contamination of supplements (cases of Ostarine) and cases of contamination of meat (Clomiphene). When contaminated supplements were reported, they were added to the list of high-risk supplements maintained as part of USADA’s online dietary supplement safety education and awareness resource—Supplement 411. There were also cases in which positive doping could be avoided through the early report of therapeutic use exemptions. The methodology that the USADA has implemented allows us to register the athletes with positive doping, check the risk of the supplements before being bought and provide a teaching portal. These efforts are necessary to implement in all countries in which MMA is practiced, avoiding the participation of doped martial artists.