The reliability of energy supply is an important factor for end-users of electricity. Although many advances and efforts have been made by distribution companies to guarantee energy quality, weak feeders and grids are still usually found. As an alternative to minimize such problems, Battery Energy Storage Systems (BESSs) can be used to supply energy to users in the case of power outages or major energy quality problems. This paper presents test results on a real application scenario in a microgrid with different load configurations in the moment of interruption. The tests were compared to each other to analyze the impact found in each scenario. In addition to those, real unpremeditated cases of power quality problems were also discussed, and the performance of the utilized BESS was evaluated.
This article addresses the development of the energy compensation method used for the design of hybrid energy storage systems—HBESS. The combination of two battery technologies offers better cost and performance when considering microgrid systems to provide uninterrupted power to sensitive loads (substation auxiliary system) and also provides greater energy security. In the event of a failure, the load needs to continue operating, and batteries such as lithium ions have a fast response, but are expensive for large-scale systems. However, some technologies offer low-cost and good availability of energy for long hours of discharge, such as lead–acid batteries. Consequently, different battery technologies can be used to meet all the needs of the sensitive loads. A specific method for sizing a HBESS was developed for islanded microgrids to support sensitive loads. This method was developed to meet the demand for substations outside the Brazilian standard of power systems that lack an uninterrupted and reliable energy source. The method is validated by designing a microgrid to support the auxiliary systems of a transmission substation in northeastern Brazil. The results showed a system with a capacity of 1215 kWh of lead-carbon and 242 kWh of lithium ions is necessary to maintain an islanded microgrid for at least 10 h. Furthermore, the microgrid comprises a PV plant with an AC output power of 700 kW in connected operation and 100 kW when islanded from the grid.
The transition to a low-carbon energy matrix has driven the electrification of vehicles (EVs), yet charging infrastructure—particularly fast direct current (DC) chargers—can negatively impact distribution networks. This study investigates the integration of Battery Energy Storage Systems (BESSs) with the power grid, focusing on the E-Lounge project in Brazil as a strategy to mitigate these impacts. The results demonstrated a 21-fold increase in charging sessions and an energy consumption growth from 0.6 MWh to 10.36 MWh between June 2023 and March 2024. Compared to previous findings, which indicated the need for more robust systems, the integration of a 100 kW/138 kWh BESS with DC fast chargers (60 kW) and AC chargers (22 kW) proved effective in reducing peak demand, optimizing energy management, and enhancing grid stability. These findings confirm the critical role of BESSs in establishing a sustainable EV charging infrastructure, demonstrating improvements in power quality and the mitigation of grid impacts. The results presented in this study stem from a project approved under the Research and Development program of the Brazilian Electricity Regulatory Agency (ANEEL) through strategic call No. 022/2018. This initiative aimed to develop a modular EV charging infrastructure for fleet vehicles in Brazil, ensuring minimal impact on the distribution network.
Substation (SS) auxiliary systems (SAux) are facilities responsible for hosting the alternating (AC) and direct current (DC) busbar to serve the equipment and systems that perform the substation’s protection, control, and supervision. External and internal power supplies typically ensure the continuity of such a facility. The electricity support will be restricted to diesel emergency generators (DG) if the external power supply is unavailable due to a contingency. The DG present a slower response time and are susceptible to starting failures. Microgrids with Battery Energy Storage Systems (BESS) paired with photovoltaic systems (PV) are presented as an innovative and reliable solution for powering the SAux. In this article, tests were carried out on the microgrid of the Edson Mororó Moura Institute of Technology (ITEMM) in Brazil to support the use of microgrids BESS/PV in the SAux of a transmission SS of the São Francisco Hydroelectric Company (Chesf). Without an external power supply, BESS commands the action of islanded operation, maintaining both voltage and frequency requirements of the microgrid without load shedding. It was possible to observe all operations of the microgrid. The experimental results showed that the solution proposed in the paper implements a dependable self-dispatchable autonomous power supply.
The search for charging electric vehicles using renewable energy sources and ensuring the stability of the electrical system has been growing. This has led to the development of charging stations that integrate photovoltaic systems, energy storage systems in batteries, and charging stations. The storage system allows for applications that increase the reliability of the electrical network. The objective of this work is to study, based on real operational scenarios, the impacts, and criteria of energy quality of a charging solution containing a photovoltaic system, a storage system, and a charging station. In the solution, the batteries are lead-carbon type and photovoltaics have priority in energy supply, using excess generation to charge the batteries. In this aspect, the work presents relevant contributions to the study of energy quality. An improvement in energy quality is pointed out with the use of batteries, proving that even in the most diverse operating situations, such as partial shading of the photovoltaic modules, with 20% shading relative to the nominal power, charging is not impacted and reductions in distortions are achieved, with a 50% reduction in voltage imbalance, when the storage system is a voltage reference and reference to the microgrid.
This paper presents the field deployment and operational evaluation of a hybrid photovoltaic–battery energy storage system (PV–HBESS) designed to enhance the resilience and energy autonomy of auxiliary services in a high-voltage transmission substation. The system integrates photovoltaic generation with two complementary battery chemistries, Lead-Carbon (PbC) and Lithium Iron Phosphate (LFP), managed by a dedicated energy management system (EMS). Installed at the 500 kV Messias substation operated by Eletrobras Chesf in Brazil, the microgrid architecture enables seamless transitions between grid-connected and islanded modes. Real-time field validation tests demonstrate the system’s capability to deliver uninterrupted backup power, perform demand control, execute energy shifting, regulate reactive power (Volt-Var), and smooth PV power fluctuations. Results confirm the effectiveness of the hybrid system in improving power quality and reliability under dynamic grid and solar conditions, making it a replicable solution for critical infrastructure support in transmission networks.