Influence of residual stresses on the stability of steel columns with various sections at elevated temperatures has been studied. The potential effect of residual stresses on the stability of columns should be clarified, as the stability of compression elements in fire even without explicitly regarding residual stresses is not a straightforward phenomenon. Extensive numerical study was performed utilizing non-linear finite element method. Results for models ignoring and accounting for residual stresses were compared for different steel grades, various slenderness values, temperatures and section types. Results were compared with Eurocode method.
18 November 2019 in Journal of Structural Fire Engineering
Purpose: This paper aims to reliability analysis of axially loaded steel columns at elevated temperatures considering the probabilistic features of fire. Design/methodology/approach: The response function used in the reliability analysis is based on the non-linear FEM calculations. The stochastic variability of temperature is integrated with the procedure similar to the parameters of loading and material properties. Direct Monte Carlo simulations (MCSs) are implemented for probabilistic analysis. Computational costs are reduced by polynomial approximation of the response function of the column. Findings: A design method for practical applications in the common Eurocode format is proposed. The proposed method can be used to estimate the failure probability of a steel column in fire conditions. If standard reliability criteria are applied, the results of the steel column buckling capacity in the fire according to the proposed procedure deviate from the Eurocode results in certain parameter ranges. Originality/value: The proposed method for design calculations makes use of the advantages of MCS results, while the need for the tedious amount of calculations for the end user are avoided as the predefined factors are implemented in the procedure of Eurocode format. The proposed method allows better differentiation of the fire probability in the capacity assessment compared to the existing design methods.