Weican Tian

Dr. Weican Tian

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 September 2024 in Journal of Hydrology
Verified
Journal Article
Closed access
WWWenchuan Wang
Wenchuan Wang
WTWeican Tian
Weican Tian
XHXiao-Xue Hu
Xiao-Xue Hu
YHYang-Hao Hong
Yang-Hao Hong
FCFu-Xin Chai
Fu-Xin Chai
DXDong-Mei Xu
Dong-Mei Xu

21 July 2025 in Journal of Hydrology
Verified
Journal Article
Closed access
WTWeican Tian
Weican Tian
WWWen-Chuan Wang
Wen-Chuan Wang
YWYi-Yang Wang
Yi-Yang Wang
CSCan-Can Shi
Can-Can Shi
QMQiang Ma
Qiang Ma

25 March 2023 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
WWWenchuan Wang
Wenchuan Wang
WTWeican Tian
Weican Tian
DXDongmei Xu
Dongmei Xu
Kwok-wing ChauKwok-wing Chau
Kwok-wing Chau
Qiang MaQiang Ma
Qiang Ma
Liu ChangjunLiu Changjun
Liu Changjun
1

23 September 2025 in Journal of Hydrology
Verified
Journal Article
Closed access
WWWenchuan Wang
Wenchuan Wang
WTWeican Tian
Weican Tian
MRMing-Lei Ren
Ming-Lei Ren
DXDong-Mei Xu
Dong-Mei Xu

9 February 2023 in Water
Verified
Journal Article
Open access
PDF file
WWWenchuan Wang
Wenchuan Wang
WTWeican Tian
Weican Tian
Kwok-wing ChauKwok-wing Chau
Kwok-wing Chau
HZHongfei Zang
Hongfei Zang
Mingwei MaMingwei Ma
Mingwei Ma
DXDongmei Xu
Dongmei Xu
The reservoir flood control operation problem has the characteristics of multiconstraint, high-dimension, nonlinearity, and being difficult to solve. In order to better solve this problem, this paper proposes an improved bald eagle search algorithm (CABES) coupled with ε-constraint method (ε-CABES). In order to test the performance of the CABES algorithm, a typical test function is used to simulate and verify CABES. The results are compared with the bald eagle algorithm and particle swarm optimization algorithm to verify its superiority. In order to further test the rationality and effectiveness of the CABES method, two single reservoirs and a multi-reservoir system are selected for flood control operation, and the ε constraint method and the penalty function method (CF-CABES) are compared, respectively. Results show that peak clipping rates of ε-CABES and CF-CABES are both 60.28% for Shafan Reservoir and 52.03% for Dahuofang Reservoir, respectively. When solving the multi-reservoir joint flood control operation system, only ε-CABES flood control operation is successful, and the peak clipping rate is 51.76%. Therefore, in the single-reservoir flood control operation, the penalty function method and the ε constraint method have similar effects. However, in multi-reservoir operation, the ε constraint method is better than the penalty function method. In summary, the ε-CABES algorithm is more reliable and effective, which provides a new method for solving the joint flood control scheduling problem of large reservoirs.

6 December 2024 in The Journal of Supercomputing
Verified
Journal Article
Closed access
PDF file
WWWenchuan Wang
Wenchuan Wang
WTWeican Tian
Weican Tian
Kwok-wing ChauKwok-wing Chau
Kwok-wing Chau
HZHongfei Zang
Hongfei Zang