This paper innovatively proposes the Black Kite Algorithm (BKA), a meta-heuristic optimization algorithm inspired by the migratory and predatory behavior of the black kite. The BKA integrates the Cauchy mutation strategy and the Leader strategy to enhance the global search capability and the convergence speed of the algorithm. This novel combination achieves a good balance between exploring global solutions and utilizing local information. Against the standard test function sets of CEC-2022 and CEC-2017, as well as other complex functions, BKA attained the best performance in 66.7, 72.4 and 77.8% of the cases, respectively. The effectiveness of the algorithm is validated through detailed convergence analysis and statistical comparisons. Moreover, its application in solving five practical engineering design problems demonstrates its practical potential in addressing constrained challenges in the real world and indicates that it has significant competitive strength in comparison with existing optimization techniques. In summary, the BKA has proven its practical value and advantages in solving a variety of complex optimization problems due to its excellent performance. The source code of BKA is publicly available at https://www.mathworks.com/matlabcentral/fileexchange/161401-black-winged-kite-algorithm-bka.
The reservoir flood control operation problem has the characteristics of multiconstraint, high-dimension, nonlinearity, and being difficult to solve. In order to better solve this problem, this paper proposes an improved bald eagle search algorithm (CABES) coupled with ε-constraint method (ε-CABES). In order to test the performance of the CABES algorithm, a typical test function is used to simulate and verify CABES. The results are compared with the bald eagle algorithm and particle swarm optimization algorithm to verify its superiority. In order to further test the rationality and effectiveness of the CABES method, two single reservoirs and a multi-reservoir system are selected for flood control operation, and the ε constraint method and the penalty function method (CF-CABES) are compared, respectively. Results show that peak clipping rates of ε-CABES and CF-CABES are both 60.28% for Shafan Reservoir and 52.03% for Dahuofang Reservoir, respectively. When solving the multi-reservoir joint flood control operation system, only ε-CABES flood control operation is successful, and the peak clipping rate is 51.76%. Therefore, in the single-reservoir flood control operation, the penalty function method and the ε constraint method have similar effects. However, in multi-reservoir operation, the ε constraint method is better than the penalty function method. In summary, the ε-CABES algorithm is more reliable and effective, which provides a new method for solving the joint flood control scheduling problem of large reservoirs.