Primary energy sources are running out due to the increase in electrical energy consumption. Environmental problems caused by primary energy sources are also increasing. Using more renewable energy resources (RES) can be considered as one of the most powerful solutions to address these problems. Today, required photovoltaic power systems (PVPS) and wind energy systems (WES) are widely used as RES for addressing these problems. Because of their high costs, feasibility studies are required for locating large systems associated with these resources. In this study, various suggestions are determined about location selection, which is an important stage in the PVPS’s establishment. Hence, the criteria for selecting the appropriate location are analyzed by the multicriteria decision making (MCDM) methods and the results are evaluated for 5 cities in the Central Anatolian Region of Turkey. In conclusion, it is determined which city is the most suitable place for installation of solar power plants.
31 December 2022 in Uluslararası Muhendislik Arastirma ve Gelistirme Dergisi
Solar power prediction is an important problem that has gained significant attention in recent years due to the increasing demand for renewable energy sources. In this paper, we present the results of using four different regression models for solar power prediction: linear regression, logistic regression, Lasso regression, and elastic regression. Our results show that all four models are able to accurately predict solar power, but Lasso regression and elastic regression outperform linear and logistic regression in terms of predicting the maximum solar power output. We also discuss the advantages and disadvantages of each model in the context of solar power prediction.
19 February 2024 in Electric Power Components and Systems
Nowadays, there are many problems with the electricity system, such as increasing consumption, short-time overload during the intra-day, environmental problems caused by fossil fuel, and foreign-source dependency. Therefore, it is necessary to meet these increasing energy needs, minimize environmental impacts, and develop cost optimization solutions. In order to meet these requirements, it is necessary for the network to have a more dynamic structure and to have real-time monitoring and control systems. Furthermore, to develop the aforementioned system, it is necessary to estimate the load of the users in the system. Therefore, the developed artificial neural network-based load estimation algorithm is capable of high accuracy load estimates, and high precision data were obtained for use in the demand side management system
15 June 2014 in Uluslararası Muhendislik Arastirma ve Gelistirme Dergisi
En tr In this study, wind energy potential of the campus of Kırıkkale University is analyzed by using wind speed data which is obtained from the project within the scope of Müsiad and Ahiler Development Agency. Firstly, the concepts related to wind energy are explained, then energy and cost analyses are made through wind speed data for different hub heights of Enercon-53 wind turbine which has 800 kW rated power. The effect of hub height to the energy production amount, capacity factor, and repayment period of investment is examined by the means of analyses. Bu çalışmada, Müsiad'ın Ahiler Ajansı ile ortak yürüttüğü proje kapsamında, Kırıkkale Üniversitesi kampüs alanında bulunan ve rüzgar hızı belirlenen bir bölgenin verileri kullanılarak, bölgenin rüzgar enerjisi potansiyeli analiz edilmiştir. Çalışmada ilk olarak rüzgar enerjisiyle alakalı kavramlar açıklanmış, daha sonra belirlenen rüzgar verisi yardımıyla bölgede kurulabilecek 800 kW'lık anma gücüne sahip Enercon-53 rüzgar türbinin farklı kule yükseklikleri için enerji analizi ve maliyet analizi yapılmıştır. Bu analiz yardımıyla kule yüksekliğinin enerji üretim miktarına, kapasite faktörüne ve yatırımın amorti edilebileceği süreye etkisi incelenmiştir.