Evrencan Özcan

Prof. Evrencan Özcan

Kırıkkale University
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2017 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
Evrencan ÖzcanEvrencan Özcan
Evrencan Özcan
SÜSultan Ünlüsoy
Sultan Ünlüsoy
TETamer Eren
Tamer Eren

17 October 2020 in International Journal of Information Technology & Decision Making
Verified
Journal Article
Closed access
PDF file
EÖEmir Hüseyin Özder
Emir Hüseyin Özder
Evrencan ÖzcanEvrencan Özcan
Evrencan Özcan
TETamer Eren
Tamer Eren

1 January 2021 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
MBMerve Bulut
Merve Bulut
Evrencan ÖzcanEvrencan Özcan
Evrencan Özcan

20 March 2019 in Processes
Verified
Journal Article
Open access
PDF file
BUBuse Uslu
Buse Uslu
TETamer Eren
Tamer Eren
ŞGŞeyda Gür
Şeyda Gür
Evrencan ÖzcanEvrencan Özcan
Evrencan Özcan
The rapid development of technology has increased the desire of all to be on the Internet. The discovery that objects born of the Internet communicate with each other without external factors revealed, with the fourth industrial revolution, the concept of the Internet of Things (IoT). The communication of objects with each other means minimum labor and minimum cost for enterprises. Enterprises that want to transition to the Internet of Things face many difficulties. Identifying and correcting these difficulties can lead to both lost time and high cost. In this study, we investigated the difficulties encountered in the Internet of Things. As a result of the study, the degree of importance of the factors causing these difficulties was determined by multi-criteria decision-making methods and was presented to the enterprises. The main criteria, and the sub-criteria related to these main criteria, were determined. The main purpose of the enterprises transitioning to Industry 4.0 is the communication of things with each other. In this study, we aimed to determine which criteria caused difficulties in the transition to Industry 4.0. Then, the degree of importance of the criteria was determined using the analytic hierarchy process (AHP) and analytic network process (ANP) methods, in the multi-criteria decision-making. Through the study, we determined which criteria should be taken into consideration by the enterprises that want to transition to the Internet of Things. In this way, enterprises will be able to accelerate that transition by minimizing time and monetary loss.

30 September 2020 in Eksploatacja i Niezawodność – Maintenance and Reliability
Verified
Journal Article
Closed access
Evrencan ÖzcanEvrencan Özcan
Evrencan Özcan
TDTuğba Danışan
Tuğba Danışan
RYRabia Yumuşak
Rabia Yumuşak
TETamer Eren
Tamer Eren
Power plants are the large-scale production facilities with the main purpose of realizing uninterrupted, reliable, efficient, economic and environmentally friendly energy generation. Maintenance is one of the critical factors in achieving these comprehensive goals, which are called as sustainable energy supply. The maintenance processes carried out in order to ensure sustainable energy supply in the power plants should be managed due to the costs arising from time requirement, the use of material and labor, and the loss of generation. In this respect, it is critical that the fault dates are forecasted, and maintenance is performed without failure in power plants consisting of thousands of equipment. In this context in this study, the maintenance planning problem for equipment with high criticality level is handled in one of the large-scale hydroelectric power plants that meet the quintile of Turkey’s energy demand as of the end of 2018. In the first stage, the evaluation criteria determined by the power plant experts are weighted by the Analytical Hierarchy Process (AHP), which is an accepted method in the literature, in order to determine the criticality levels of the equipment in terms of power plant at the next stage. In order to obtain the final priority ranking of the equipment in terms of power plant within the scope of these weights, Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is used because of its advantages compared to other outranking algorithms. As a result of this solution, for the 14 main equipment groups with the highest criticality level determined on the basis of the power plant, periods between two breakdowns are estimated, and maintenance planning is performed based on these periods. In the estimation phase, an artificial neural network (ANN) model has been established by using 11-years fault data for selected equipment groups and the probable fault dates are estimated by considering a production facility as a system without considering the sector for the first time in the literature. With the plan including the maintenance activities that will be carried out before the determined breakdown dates, increasing the generation efficiency, extending the economic life of the power plant, minimizing the generation costs, maximizing the plant availability rate and maximizing profit are aimed. The maintenance plan is implemented for 2 years in the power plant and the unit shutdowns resulting from the selected equipment groups are not met and the mentioned goals are reached.

1 June 2017 in Konya Journal of Engineering Sciences
Verified
Journal Article
Open access
PDF file
Evrencan ÖzcanEvrencan Özcan
Evrencan Özcan
SÜSultan Ünlüsoy
Sultan Ünlüsoy
TETamer Eren
Tamer Eren
ANP VE TOPSIS YÖNTEMLERİYLE TÜRKİYE'DE YENİLENEBİLİR ENERJİ YATIRIM ALTERNATİFLERİNİN DEĞERLENDİRİLMESİ