Vijay Babu Electronics Pamshetti

Dr. Vijay Babu Electronics Pamshetti


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 July 2019 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
Shailendra SinghShailendra Singh
Shailendra Singh
VPVijay Babu Electronics Pamshetti
Vijay Babu Electronics Pamshetti
SSS. P. Singh
S. P. Singh
This paper investigates on the need of coordinated operation of Conservation Voltage Reduction (CVR) in the presence of Electric Vehicle (EV) penetration in the active distribution network. In order to analyze the impact of both the technologies (CVR and EV), a time horizon-based model predictive Volt/VAR optimization (MP-VVO) methodology has been introduced in smart grid framework. The proposed VVO methodology operates in centralized as well as local controls under different time scale of operation including cloud transient effects on solar photovoltaic (PV) power output. Moreover, the control algorithms also consider the uncertainties in load demand and PV power generation. The VVO includes the impact of different EV charging loads having the ability of participation in reactive power support at selected charging points. This is also referred as Vehicle to Grid (V2G) operation in terms of reactive power dispatch only. Besides, the voltage and VAR regulation through smart inverters of PVs and EV charging station has been fruitfully utilized in global as well as local domain. A real-time Volt/VAR droop-based controller has been introduced to control the smart inverters reactive power dispatch. To validate the developed methodology, a real-time co-simulation framework using real-time digital simulator (RTDS) and Python interface has been built. The proposed MP-VVO algorithm has been validated on a modified IEEE 34 test system. The simulated results reveal that significant CVR energy savings and losses reduction has been achieved without violating the system constraints. The voltage control algorithm works well in both slow &fast time scale.

3 March 2021 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
VPVijay Babu Electronics Pamshetti
Vijay Babu Electronics Pamshetti
Shailendra SinghShailendra Singh
Shailendra Singh
ATAmit Kumar Thakur
Amit Kumar Thakur
SSS. P. Singh
S. P. Singh
The conservation voltage reduction (CVR) technique is a well-established technique for peak demand reduction and energy savings in the presence of voltage-sensitive loads. However, intermittent and uncertain nature of renewable energy sources such as photovoltaic generation may produce some operational issues under real-time CVR operation, which results in major problems such as undervoltage as well as increase in power losses in an active distribution network. Advanced power-electronics-based devices such as inverter-based distributed generators (IDGs) and soft open point (SOP) devices emerge as potential solutions for the aforementioned issues by providing the volt-ampere reactive (VAR) support. However, an efficient CVR methodology is much needed for proper coordination of multiple traditional volt/VAR control devices and advanced power-electronics-based devices. Therefore, this article introduces a multistage coordinated CVR methodology incorporating IDG and SOP devices for offline (i.e., day-ahead scheduling) and online (i.e., real-time dispatch) studies. For day-ahead scheduling, stochastic CVR formulation has been developed considering intermittency and uncertainties in power loads and generations. In contrast, online simulations have been performed in two stages for near-real-time operation using an inner-day rolling control model based on model-predictive control and real-time control through modified volt/VAR droop (VVD) control by optimal VVD curve selection. To validate the proposed scheme, a real-time cosimulation platform using a real-time digital simulator and a MATLAB-GAMS interface has been built. The efficacy of the proposed method has been validated on various case studies and also tested on sudden external disturbances such as sudden cloud transient, cloud cover, and substation voltage changes. Furthermore, the robustness of the proposed method has also been checked under faulty conditions. The test results demonstrate the significance of the proposed methodology on voltage violation mitigation, energy loss, energy consumption minimization, and service restoration.

5 September 2019 in IEEE Systems Journal
Verified
Journal Article
Closed access
VPVijay Babu Electronics Pamshetti
Vijay Babu Electronics Pamshetti
Shailendra SinghShailendra Singh
Shailendra Singh
SSShiv P. Singh
Shiv P. Singh
Reduction of energy consumption and energy losses is a major concern of the distribution network operator in the present scenario. Traditionally, on-load tap changers, a shunt capacitor bank, and a voltage regulator have been employed as volt-var control (VVC) devices for savings in energy consumption and losses. In this paper, an efficient and optimally coordinated operation of traditional VVC devices, a distribution network reconfiguration (DNR), and a photovoltaic smart inverter (PVSI) for energy savings has been proposed. In order to achieve the optimal solution, a modified binary gray wolf optimization (MBGWO) algorithm has been proposed. Besides, the proposed method in association with PVSI droop control has been employed to control the voltage violations during cloudy day condition. Furthermore, the proposed method has been employed for service restoration considering voltage regulation and peak demand reduction under faulty condition. For validation, the performance of the proposed algorithm has been tested on balanced as well as unbalanced distribution systems. The test results demonstrate the significance of the DNR associated with VVC devices and PVSI for energy savings under different load models. Outcome of the proposed algorithm has been compared with other existing metaheuristic algorithms and test results demonstrate the benefit of the proposed method.

18 December 2020 in IEEE Systems Journal
Verified
Journal Article
Closed access
VPVijay Babu Electronics Pamshetti
Vijay Babu Electronics Pamshetti
SSS. P. Singh
S. P. Singh
This article investigates the coordinated allocation of battery energy storage system (BESS) and soft open point (SOP) in high photovoltaic penetrated distribution network incorporating demand response (DR), and conservation voltage reduction (CVR) schemes. To do so, a new two-stage coordinated optimization framework has been developed for integrated planning of BESS and SOP considering DR and CVR schemes. In stage 1, optimal location and size determination of BESS and SOP devices has been carried out simultaneously. Whereas, stage 2 performs the optimal operation of BESS and SOP corresponding to CVR and DR schemes. The objective of the proposed methodology is to minimize the total investment and operating cost of BESS and SOP devices. Besides, it includes the cost of purchased power from substation, cost of energy not served and cost of $\text{CO}_2$ emission. Meanwhile, to address high-level uncertainties related to PV generation and load demands, a stochastic module has been adopted, which produces several scenarios by Monte Carlo simulation at each hour. Furthermore, K-means clustering technique has been employed to determine the reduced scenarios with high quality and diversity. The proposed framework has been implemented on IEEE 33-bus distribution system for different cases and solved by using hybrid optimization solver. The test results demonstrate the effectiveness of proposed framework in improving the system efficiency, enhancing the flexibility, reliability and reducing carbon emission footprint of distribution systems.

21 November 2022 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
VPVijay Babu Electronics Pamshetti
Vijay Babu Electronics Pamshetti
Shailendra SinghShailendra Singh
Shailendra Singh
ATA K Thakur
A K Thakur
SSS P Singh
S P Singh
TBT Sudhakar Babu
T Sudhakar Babu
GKG Hari Krishna
G Hari Krishna
In this paper, optimal cooperative operational planning of distributed energy resources (DER) in an active distribution network (ADN) with soft open points (SOP) has been investigated. To do so, a new two-layer coordinated optimization framework ADN has been proposed considering SOP. In the upper layer, the location and sizing of the DERs and SOPs has been optimised. While inner layer executes simultaneous optimal functioning of volt/var control (VVC) devices, remote controlled switches (RCS), DERs, and SOPs. The main objective of proposed methodology is to reduce total investment cost of DERs and SOPs as well as operating costs of the system over the planning horizon. Besides, objective function considers the cost of energy not served (ENS), the cost of substation-purchased electricity, and the cost of carbon emissions. Meanwhile, a stochastic module has been employed to address high-level uncertainties associated to renewables and load demands. Besides, the effects of distribution network reconfiguration (DNR) and conservation voltage reduction (CVR) have been taken into account. For various instances, the suggested framework was implemented on an IEEE 119-bus distribution system and solved using a proposed hybrid optimization solver. The efficacy of proposed DER with SOP methodology has been validated on various cases and also tested on sudden external disturbances such as under voltage and over voltage problem conditions. When compared to standard planning schemes, the test results show that it is beneficial in boosting system efficiency, increasing reliability, and lowering the carbon footprint of distribution systems.

25 May 2020 in IEEE Systems Journal
Verified
Journal Article
Closed access
Shailendra SinghShailendra Singh
Shailendra Singh
VPVijay Babu Electronics Pamshetti
Vijay Babu Electronics Pamshetti
ATAmit Kumar Thakur
Amit Kumar Thakur
SSS. P. Singh
S. P. Singh
This article investigates the need of coordinated operation of multiple voltage regulation devices under different time scales to enhance energy efficiency via conservation voltage reduction (CVR) in distribution networks in the presence of high photovoltaic (PV) penetration. A multistage multiobjective Volt/VAR control strategy for smart grid-enabled CVR has been proposed. In order to maximize the benefits of CVR, the method has been implemented in multiple stages of slow and fast time scale control periods for planning and real-time operations, respectively. The stochastic multiobjective Volt/VAR optimization considering uncertainty and forecasting errors has been formulated for the planning stage. However, in real-time operation, an adaptive Volt/VAR droop-controlled approach has been proposed for fast time controllers to mitigate voltage fluctuations during the sudden change in PV active power output. Besides, the economic impact of CVR in terms of cost savings has been investigated. The proposed control algorithms have been validated in real-time co-simulation platform. The simulated results demonstrate a higher reduction in peak demand, daily energy demand, and system losses. Further, a higher reduction in power purchase cost has been achieved in the presence of PV system with CVR in comparison to PV alone. Moreover, the proposed control algorithms work well in real-time operation under intermittency in PV power output also.