Ardiaty Arief

Dr. Ardiaty Arief

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 February 2023 in Energies
Verified
Journal Article
Open access
PDF file
MNMuhammad Bachtiar Nappu
Muhammad Bachtiar Nappu
AAArdiaty Arief
Ardiaty Arief
WAWilly Akbar Ajami
Willy Akbar Ajami
Since the power grid grows and the necessity for higher system efficiency is due to the increasing number of renewable energy penetrations, power system operators need a fast and efficient method of operating the power system. One of the main problems in a modern power system operation that needs to be resolved is optimal power flow (OPF). OPF is an efficient generator scheduling method to meet energy demands with the aim of minimizing the total production cost of power plants while maintaining system stability, security, and reliability. This paper proposes a new method to solve OPF by using incremental particle swarm optimization (IPSO). IPSO is a new algorithm of particle swarm optimization (PSO) that modifies the PSO structure by increasing the particle size, where each particle changes its position to determine its optimal position. The advantage of IPSO is that the population increases with each iteration so that the optimization process becomes faster. The results of the research on optimal power flow for energy generation costs, system voltage stability, and losses obtained by the IPSO method are superior to the conventional PSO method.

1 January 2022 in Electric Power Systems Research
Verified
Journal Article
Closed access
AAArdiaty Arief
Ardiaty Arief
MNMuhammad Bachtiar Nappu
Muhammad Bachtiar Nappu
ZDZhao Yang Dong
Zhao Yang Dong

29 April 2018 in International Journal of Technology
Verified
Journal Article
Open access
AAArdiaty Arief
Ardiaty Arief
MNMuhammad Bachtiar Nappu
Muhammad Bachtiar Nappu
AAAntamil Antamil
Antamil Antamil
This paper presents a novel analytical methodology to determine location for reactive power devices placement in power systems. The proposed method modifies modal analysis technique and develops new formulation to compute the Reactive Contribution Factor (RCF) of each load buses based on the inversed reduced Jacobian matrix. The objective of this research is to achieve the most stable condition as well as to minimize network losses. The proposed method is implemented at the modified IEEE 30-bus Reliability Test System (RTS) and compared with different placement. This work compares the voltage profile, eigenvalue and network losses to assess the method. The simulation results show the proposed method can provide a solution to the ideal shunt compensator placement to improve the system’s voltage stability and minimizing losses.

1 October 2019 in Journal of Physics: Conference Series
Verified
Conference Paper
Open access
PDF file
FRF Ratuhaji
F Ratuhaji
AAArdiaty Arief
Ardiaty Arief
MNMuhammad Bachtiar Nappu
Muhammad Bachtiar Nappu
This study aims at giving descriptive computation of determining the optimal location and capacity of Distributed Generation (DG) for the compensation of active and reactive power on the electric power system using Artificial Bee Colony and minimizing the power losses. It employed the IEEE 34-Bus Reliability Test System (RTS) as the case study focusing on the determination of the location and capacity of Distributed Generation using Artificial Bee Colony algorithm. The data analysis shows that the placement of DG on the IEEE 34-bus system employing ABC can reduce the real power losses and the real power losses at the optimal location and capacity is minimum.

31 October 2022 in Energy Reports
Verified
Journal Article
Open access
AAArdiaty Arief
Ardiaty Arief
MNMuhammad Bachtiar Nappu
Muhammad Bachtiar Nappu
SMSyahrul Mustafa
Syahrul Mustafa
ERErwin
Erwin
STSarma Thaha
Sarma Thaha

1 March 2020 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
AAArdiaty Arief
Ardiaty Arief
MNM B Nappu
M B Nappu
ASA Sultan
A Sultan
The Government of Indonesia is encouraging investments in renewable energy based power plants in Indonesia, including wind power plants (WPPs). Two large WPPs in the Southern Sulawesi interconnected power system are Sidrap WPPs and Jeneponto WPPs. Both Sidrap WPP and Jeneponto WPP are the largest WPPs in Indonesia and they account for significant contribution for the Southern Sulawesi power generation mix. Considering the intermittency characteristics of WPPs and system’s failure probability, therefore it is essential to assess the system’s stability after their integration. This work evaluates the frequency stability of the Southern Sulawesi interconnected power system with the integration of both Sidrap WPPs and Jeneponto WPPs.