In this study, the safe charge per delay (kg) of explosives and Peak Particle Velocity (PPV, mm/s) are recorded for 140 blast events at various distances which relates to the dam and hydropower projects of Karoun III, Masjed –...
1 January 2022 in Rudarsko-geološko-naftni zbornik
The amount of comminution or fineness of minerals in a mill can be described by various parameters, the most important of which is d80 (80% passing size). The purpose of this study is to investigate and simulate the optimal operating conditions of a ball mill in a copper processing plant. The actual operating conditions in the intended mill are performed with a 300 tph tonnage, a 267 second retention time, and a discharge d80 = 53 μm. Laboratory studies showed that the optimal economical and metallurgical recovery of copper in this plant is achieved in 65 μm ≤ d80 ≤ 75 μm with Flotation Recovery (R) = 90.16%, Economical Efficiency (EE) = 93.04% and Separation Efficiency (SE) = 88.64%. In this study, having the optimal d80 for the concentration unit, the mill data, and utilizing Excel Software and the Morrell method, first the total power for the optimal set of d80 was calculated, which is equal to 7790 to 8005 kW. Then, according to these power values, the corresponding retention times were calculated, which are equal to 236 and 247 seconds respectively. Finally, utilizing the retention time-tonnage relationship and taking into account the specific filling of the mill, the optimal corresponding tonnages to the obtained retention times were calculated, ranging from 324 to 340 tph. The results of these studies showed that by reducing the level of comminution from d80 = 53 μm to 65 μm ≤ d80 ≤ 75 μm, in addition to increasing flotation efficiency to R = 90.16%, EE = 93.04% and SE = 88.64%, about 4.21% to 7.09% energy savings and an 8.00% to 13.33% tonnage increase will occur.
1 January 2023 in Rudarsko-geološko-naftni zbornik
Grinding aids are materials that are added to cement mixtures to improve the characteristics of the cement or increase the efficiency of the milling systems or both in the clinker grinding (finish grinding) stage. In this study, the effects of four g...
24 December 2018 in Bulletin Of The Mineral Research and Exploration
In this study, simulation aided design of grinding circuit for a gold mine in Iran is presented. The main parameters for the design of the grinding circuit are the ore specifications and the considered operating conditions. Ore specifications were characterized by grinding tests, which included the Drop – weigh test (A, b), the abrasion test (t a) and the Bond Work Index test (Wi). For this study, the operating conditions for the processing plant are the ability to process clayey minerals and the plant throughput and the d80 of the hydrocyclone overflow (leaching tank feed), which are 125 tons per hour and 45 μm, respectively. Simulation operations were performed using grinding parameters (A, b, ta, Wi), operating constraints (plant capacity, d80 of the hydrocyclone overflow and ability to work for clayey minerals), existing mathematical models for different types of crushers, mills and separators and JKSimMet software. By completing the simulation process, three different alternatives for the grinding circuit of the considered ore were predicted. These three alternatives have been compared and evaluated with each other in terms of specific energy consumption (kWh/t), sensitivity to operational variables and the ability to process clayey minerals. The optimal circuit must have the capability to process clayey minerals and must have the lowest specific energy consumption and the least sensitivity to operational variables. By considering all these factors, the Alternative 3 is selected and suggested for an efficient grinding circuit.