Xianmeng Zhang

Dr. Xianmeng Zhang

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 July 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
XZXianmeng Zhang
Xianmeng Zhang
WWwangminghao wangminghao
wangminghao wangminghao
DFDan Feng
Dan Feng
JWJIngchun Wang
JIngchun Wang
Tunnel engineering is an important aspect of developing and utilizing underground spaces. Tunnel water inrush became a common problem that restricts the safe and efficient construction of tunnels. This paper focuses on a karst water-rich tunnel in Chongqing and establishes a seepage field distribution model around the tunnel, analyzing the evolution law of the seepage field. The water balance method and underground runoff modulus method are used to predict tunnel water inflow. The prediction method for tunnel water inflow in water-rich karst areas is combined with long-term on-site tunnel hydrology observations. The distribution of groundwater in front of the tunnel face is drawn using the software, successfully predicting the larger karst area in front of the face. The prediction of water inrush risk level for karst tunnels is carried out using the SVR model. An expression formula for the water head around the tunnel is established by using the conformal mapping relationship, and the distribution status of the seepage field around the tunnel is ultimately determined. The overall prediction accuracy of the underground runoff modulus method is better than that of the water balance method in predicting the water inrush volume of the tunnel. The prediction of the large karst area ahead of the heading is successfully achieved by using the SVR model. This prediction method can provide reference and guidance for the construction of other karst-rich water tunnels in the region.

7 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
XZXianmeng Zhang
Xianmeng Zhang
JWJIngchun Wang
JIngchun Wang
DFDan Feng
Dan Feng
WWwangminghao wangminghao
wangminghao wangminghao
This paper aims to provide the basis of the parameters and data interpretation for some important problems, such as the identification of the type of overlying strata and the analytical calculation, where the coal mine is employed as the object of the study. Particularly, the rock structure and fracture development characteristics of the overlying strata were observed, and the development conditions of the fracture zone were counted. By utilizing the on-site stress data, the inclination of the broken zone based on the rock fracture theory was calculated. The study shows that the distribution of the mining fissure is related to the rock and integrity degree of the strata, and that the native maximum expansion angle of fissure is 70.54°. With mining influence, small angle native shallow fissures will be bound to expansion, and the deep-mined fissure extension will be developed in the same direction. Moreover, it is easy to form the abscission layer, and then eventually form the fracture zone. The research results of this paper will not only provide an important foundation for the engineering practice, but also benefit the study of the simultaneous extraction of coal and gas.

3 March 2026 in Scientific Reports
Verified
Journal Article
Open access
PDF file
JXJianhang Xu
Jianhang Xu
XZXianmeng Zhang
Xianmeng Zhang
SLShangyue Lin
Shangyue Lin
DFDan Feng
Dan Feng
With the continuous development of urban underground space development, shield tunnel engineering inevitably intersects with existing traffic trunk lines, municipal pipe networks and buildings in the construction process, and often faces many difficulties, such as sensitive response of surrounding environment to construction disturbance, serious consequences of risk accidents and so on. Based on practical engineering, this paper conducts the following research: (1) Numerical simulation analysis of subway shield tunnel construction under existing bridge pile foundations is carried out to preview various mechanical responses during the construction process; (2) A scientific safety evaluation system and classification standard for the construction of subway shield tunnel under the existing bridge pile foundation are constructed. At the same time, the combination evaluation method of AHP-Entropy weight method and TOPSIS method based on game theory is used to evaluate it, and it is concluded that the risk level of the construction scene is grade III; (3) Numerical simulation is used to verify the scientificity and effectiveness of four safety measures: pre-grouting reinforcement of bridge pile foundations, pile foundation active underpinning, compensation for strength of pile foundation, and replacement of steel segments. Combined with practical engineering analysis, it is concluded that the optimal safety measure for this construction scenario is the replacement of steel segments.

27 February 2026 in Archives of Civil Engineering
Verified
Journal Article
Closed access
PDF file
XLXiaofeng Li
Xiaofeng Li
BWBinghua Wang
Binghua Wang
JXJianhang Xu
Jianhang Xu
XZXianmeng Zhang
Xianmeng Zhang
Improper disposal of foundation pit dewatering can cause engineering problems such as uneven settlement, slope instability, quicksand, piping, etc., and pose a huge threat to construction safety. Therefore, it is necessary to optimize the design of foundation pit dewatering engineering. This paper introduces a simulation-optimization model for this problem, establishes a groundwater flow simulation model using MODFLOW-2005 as a platform, and uses LGR local grid densification technology to densify the dewatering area of foundation pits with different curtain depths. Under the premise of ensuring construction safety, the minimum cost is the objective function, and GWM-2005 is used to solve the optimization model of the foundation pit engineering example. The results show that with the increase of the curtain depth, the optimal design can effectively reduce the number of pumping wells and the total amount of pumping water in the foundation pit dewatering project, reasonably optimize the layout of the pumping well position, significantly improve the safety of foundation pit construction, effectively reduce the impact of foundation pit dewatering project on the surrounding geological environment, and effectively control the land subsidence problem in the precipitation process.

30 June 2026 in Archives of Civil Engineering
Verified
Journal Article
Open access
JXJianhang Xu
Jianhang Xu
XZXianmeng Zhang
Xianmeng Zhang
XLXiaofeng Li
Xiaofeng Li
BWBinghua Wang
Binghua Wang
It is of great significance to predict the displacement and deformation of surface settlement during the construction of short-distance double-hole metro tunnels to prevent dynamic disasters caused by surface settlement during construction. The stochastic medium theory is studied in this paper, the optimal algorithm of stochastic medium theory is proposed, which is considered the tunnel section convergence mode, the tunnel space position and the different sections of the tunnel. The accuracy of settlement monitoring data and theoretical prediction values in tunnel construction is analyzed in combination with three engineering cases. The research shows that the applicable condition of the formula is space span ratio (L/B) less than 7; the stochastic medium simplified theoretical prediction curve and the settlement monitoring curve are better fitted, the maximum settlement position and the trend It is basically consistent with the settlement monitoring curve. The theoretical prediction curve settlement groove width is basically consistent with the settlement monitoring curve settlement groove width. The optimal algorithm and the settlement monitoring data have good consistency, which can provide some reference for the project.