Jianhang Xu

Jianhang Xu

Auto-generated profile, based on publicly available information

Jianhang Xu

M.E., Eng., School of Safety Engineering and Emergency Management, Shijiazhuang Tiedao University, Shijiazhuang,China

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 February 2026 in Archives of Civil Engineering
Verified
Journal Article
Closed access
PDF file
XLXiaofeng Li
Xiaofeng Li
BWBinghua Wang
Binghua Wang
JXJianhang Xu
Jianhang Xu
XZXianmeng Zhang
Xianmeng Zhang
Improper disposal of foundation pit dewatering can cause engineering problems such as uneven settlement, slope instability, quicksand, piping, etc., and pose a huge threat to construction safety. Therefore, it is necessary to optimize the design of foundation pit dewatering engineering. This paper introduces a simulation-optimization model for this problem, establishes a groundwater flow simulation model using MODFLOW-2005 as a platform, and uses LGR local grid densification technology to densify the dewatering area of foundation pits with different curtain depths. Under the premise of ensuring construction safety, the minimum cost is the objective function, and GWM-2005 is used to solve the optimization model of the foundation pit engineering example. The results show that with the increase of the curtain depth, the optimal design can effectively reduce the number of pumping wells and the total amount of pumping water in the foundation pit dewatering project, reasonably optimize the layout of the pumping well position, significantly improve the safety of foundation pit construction, effectively reduce the impact of foundation pit dewatering project on the surrounding geological environment, and effectively control the land subsidence problem in the precipitation process.

30 June 2026 in Archives of Civil Engineering
Verified
Journal Article
Open access
JXJianhang Xu
Jianhang Xu
XZXianmeng Zhang
Xianmeng Zhang
XLXiaofeng Li
Xiaofeng Li
BWBinghua Wang
Binghua Wang
It is of great significance to predict the displacement and deformation of surface settlement during the construction of short-distance double-hole metro tunnels to prevent dynamic disasters caused by surface settlement during construction. The stochastic medium theory is studied in this paper, the optimal algorithm of stochastic medium theory is proposed, which is considered the tunnel section convergence mode, the tunnel space position and the different sections of the tunnel. The accuracy of settlement monitoring data and theoretical prediction values in tunnel construction is analyzed in combination with three engineering cases. The research shows that the applicable condition of the formula is space span ratio (L/B) less than 7; the stochastic medium simplified theoretical prediction curve and the settlement monitoring curve are better fitted, the maximum settlement position and the trend It is basically consistent with the settlement monitoring curve. The theoretical prediction curve settlement groove width is basically consistent with the settlement monitoring curve settlement groove width. The optimal algorithm and the settlement monitoring data have good consistency, which can provide some reference for the project.