Shenggen Cao

Prof. Shenggen Cao


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 July 2018 in Environmental Earth Sciences
Verified
Journal Article
Closed access
PDF file
YZYun Zhang
Yun Zhang
SCShenggen Cao
Shenggen Cao
SGShuai Guo
Shuai Guo
TWTong Wan
Tong Wan
JWJijun Wang
Jijun Wang

20 May 2017 in Energies
Verified
Journal Article
Open access
PDF file
Yun ZhangYun Zhang
Yun Zhang
SCShenggen Cao
Shenggen Cao
LLLixin Lan
Lixin Lan
RGRui Gao
Rui Gao
Hao YanHao Yan
Hao Yan
In order to effectively recover the residual coal resources, such as coal pillars and irregular coal blocks induced by large-scale extensive mining, in this study, we proposed a shortwall block mining (SBM) technology and examined the development pattern of the water-flowing fissure zone (WFZ) in the overlying strata during the SBM process. By analyzing the overlying rocks’ movement rules in SBM, the main controlling factors affecting the development of the height of the water-flowing fissure zone (HWFZ) determined are as follows: mining height, block length, and the width of the protective coal pillar among the blocks. Moreover, based on the elastic foundation beam theory, the mechanical model for the calculation of HWFZ in SBM was established. Based on the first strength theory, the calculation formula of the development HWFZ was derived. Using this model, the calculated HWFZ after SBM was 50.3 m, whereas the measured heights of the leakage of drilling washing fluid were 47.98 and 50.06 m, respectively. The calculated values almost fit well with the field-measured data, verifying the reliability of the proposed mechanical model. The results of this study can provide a significant reference for enhancing the recovery ratio of coal resources and optimizing water protection mining theory.

18 May 2018 in Sustainability
Verified
Journal Article
Open access
PDF file
Yun ZhangYun Zhang
Yun Zhang
SCShenggen Cao
Shenggen Cao
RGRui Gao
Rui Gao
SGShuai Guo
Shuai Guo
LLLixin Lan
Lixin Lan
Longwall mining leaves pillars and irregular blocks of coal behind in its aftermath. In this study, a shortwall block mining (SBM) technique for recovering these coal resources has been proposed. A mechanical analysis model for calculating the heights of the water-conducting fracture zone (HWFZ) in overlying strata of SBM was established based on the theory of beams on elastic foundations. Using this model and the data acquired from a working face in the experimental area, a height of 50.30 m was calculated for HWFZ corresponding to this working face. This observation indicates that the equation for predicting HWFZ in working faces specified by the Hydrogeological Procedures for Mines (HPM) standard is not suitable for application in SBM. For this reason, the Universal Distinct Element Code (UDEC) modeling program was used to analyze the developmental behavior of the water-conducting fracture zone under various determining factors in SBM. The UDEC simulations indicated that the HWFZ increase linearly with an increase in mining height, decrease linearly with an increase in the width of the protective coal pillars, and increase logarithmically with block length. A nonlinear regression analysis of HWFZ was performed using the SPSS software suite, from which a model for predicting HWFZ in SBM was constructed. This model predicted that the HWFZ was 52.58 m in the experimental area, while field measurements yielded HWFZ values varying from 47.98 to 50.06 m, which was basically consistent with the results of the prediction model and the mechanical model, thus confirming the accuracy of the mechanical model and the reliability of the regression model. The results of this study will provide critical practical references for the enhancement of coal recovery rates in mining areas and enhance theories on aquifer protection during mining operations.

4 October 2018 in Geofluids
Verified
Journal Article
Open access
PDF file
YZYun Zhang
Yun Zhang
SCShenggen Cao
Shenggen Cao
TWTong Wan
Tong Wan
JWJijun Wang
Jijun Wang
Short-wall block filling mining (SBBM) technology has become an effective way to recover coal resources beneath the aquifer, which are unsuitable, or cannot be used by long-wall mining, such as corner coal pillars, industrial square pillars, and irregular coal blocks as well as the coal beneath buildings, railways, and water bodies. The SBBM method can not only enhance the recovery ratio but also provide a solution for the environment problems associated with gangues on the surface. However, whether the height of water flowing fractures will reach to the aquifer to cause water loss during SBBM has always been a key problem. Therefore, based on the theory of elastic foundation beam and SBBM characteristics, a mechanical model for calculating the height of a water flowing fracture zone in the overlying strata of SBBM was established, and this model calculated that the height of the water flowing fracture zone was 27.0 m in the experimental working face, and the height of the water flowing fracture zone was measured as 26.8 m according to washing fluid loss in the hole, core damage analysis, and drilling TV imaging detection. The comparison results demonstrated that the calculated value almost fit well with the field-measured data, validating the accuracy of the proposed mechanical model, while the predicted value (48.7 m) in the Regulations of coal mining under building, railways and water-bodies deviates greatly from the measured results. This reveals that the prediction formula in Regulations is not effective in predicting the height of the water flowing fracture zone in SBBM. The present research results are of great significance to further enhancing the recovery ratio of coal resources and improving the water-preserved mining theory.

1 April 2019 in Energies
Verified
Journal Article
Open access
PDF file
YSYu Suo
Yu Suo
ZCZhixi Chen
Zhixi Chen
Hao YanHao Yan
Hao Yan
DWDaobing Wang
Daobing Wang
SCShenggen Cao
Shenggen Cao
Hydraulic fracturing is a widely used production stimulation technology for conventional and unconventional reservoirs. The cohesive element is used to explain the tip fracture process. In this paper, the cohesive zone model was used to simulate hydraulic fracture initiation and propagation at the same time rock deformation and fluid exchange. A numerical model for fracture propagation in poro-viscoelastic formation is considered. In this numerical model, we incorporate the pore-pressure effect by coupling fluid diffusion with shale matrix viscoelasticity. The numerical procedure for hydraulically driven fracture propagation uses a poro-viscoelasticity theory to describe the fluid diffusion and matrix creep in the solid skeleton, in conjunction with pore-pressure cohesive zone model and ABAQUS was used as a platform for the numerical simulation. The simulation results are compared with the available solutions in the literature. The higher the approaching angle, the higher the differential stress, tensile stress difference, injection rate, and injection fluid viscosity, and it will be easier for hydraulic fracture crossing natural fracture. These results could provide theoretical guidance for predicting the generation of fracture network and gain a better understanding of deformational behavior of shale when fracturing.