The multi-aquifer and multi-aquitard system (MAMA) is a typical geological structure in deltas. Thus, the risks and challenges to settlement control and environmental protection are increased when demand for underground space extends to deeper strata. In this study, dewatering-induced stratified settlement in MAMA is divided into three stages according to whether the overlying aquitard is coupled with groundwater seepage. Subsequently, large physical model tests were carried out. Seepage and compression in the overlying strata come after the compression in the confined aquifer and the coordinated deformation in the overlying strata. The soil is compressed under the seepage drive within the hydraulic gradient range, while the soil above it is still affected by coordinated deformation and shows expansion. Dewatering-induced uneven settlement will cause damage to existing foundations and underground structures. Large-scale and uninterrupted excavation and dewatering are the main reasons for the continuous development of land subsidence. Although artificial groundwater recharging can reduce the settlement of the existing building, underground structure, and surrounding strata, a reasonable space arrangement is needed.
The drawdown outside of a deep foundation pit has to be controlled during excavation. However, the vertical curtain cannot cutoff a deep and thick confined aquifer during deep excavation. In this study, a microbial-induced carbonate precipitation (MICP) horizontal seepage reducing body (HSRB) was proposed to control drawdown combined with a partially penetrating curtain. MICP HSRB is formed by using the seepage field generated by the recharge wells to drive the migration of a Sporosarcina pasteurii solution, stationary solution, and cementation solution into the deep confined aquifer. The migration of each solution was numerically simulated to study the HSRB formation process. The influence of different factors on solute migration was studied. The results show that the solutes in the fixed fluid and cementation fluid can reach the area under the driving of the seepage field, which proves that MICP HSRB can be formed. The calcium ions and urea in the cementation solution are more likely to migrate to the designated area than the bacterial solution. Increasing the injection rate of bacterial solution and adding recharge wells both made the bacterial solution migrate more quickly to the designated area. In the case of multiple grouting, the solute migration in the later stage will be hindered by the plugging of pores caused by calcium carbonate generated in the earlier stage. Therefore, different grouting methods need to be designed to drive the seepage field so that the solute injected in the later stage can continue to migrate. The MICP HSRB grouting technology can be used in foundation pit dewatering, providing reference for similar engineering.
Ultra-shallow-buried and large-span double-arch tunnels face complex risks during construction. The risk sources are hidden, complicated, and diverse. The dynamic risk assessment problem cannot be solved satisfactorily by using the static method as an insufficient amount of research has been conducted. The land part of the Xiamen Haicang double-arch tunnel was selected as the background for the dynamic risk assessment of ultra-shallow-buried and large-span double-arch tunnel construction. The construction process was divided into five stages: pre-construction preparation; ground and surrounding rock reinforcement; pilot tunnel excavation; and the single-and the double-tunnel excavations of the main tunnel. Through consultation with tunnel experts, six first-level and thirty second-level risk evaluation indexes were proposed. The benchmark weight of the dynamic risk assessment index was determined by using the analytic hierarchy process. The weight of the risk evaluation index was revised according to the monitoring data and the construction stage. The fuzzy evaluation matrix of the construction risk membership degree was obtained by using the fuzzy comprehensive assessment method, and the calculation results were analyzed using the subsection assignment method. Control measures were suggested according to the risk assessment results. The risk assessment result of the double tunnel excavation stage of the main tunnel was level II, and the risk level was the highest among the five construction stages. The risk assessment result of the ground and surrounding rock reinforcement stage was level IV, and the risk level was the lowest. The dynamic construction safety risk assessment based on the fuzzy comprehensive assessment method is more timely, accurate, and reasonable than the traditional assessment method. The method can be adopted in similar engineering projects.
Taking the Zigaojian tunnel, Hangzhou–Huangshan high-speed railway, China, as background, the rock mass structure effect on smooth blasting quality was studied. Four rock mass structures were determined on the basis of the information collected on the tunnel site. Smooth blasting finite element models were established using LS-DYNA. The accuracy of the numerical calculation model was verified by comparing the overbreak and underbreak between the numerical simulation and monitoring. Orthogonal numerical test was used to study the rock mass structure effect through single factor and main effect analysis methods. With the decrease in rock mass integrity, the smooth blasting overbreak of tunnels with massive integrity structure, massive structure, layered structure, and cataclastic structure increased. For massive integrity structure and cataclastic structure, the peripheral hole spacing should be emphatically considered. Meanwhile, in massive structure and layered structure, the included angle and spacing of structural planes had a great influence on the smooth blasting quality. The research results could provide a reference to improve the quality of similar tunnel smooth blasting.
Using a soil improvement biotechnology based on microbial-induced carbonate precipitation (MICP) to form a horizontal water barrier in foundation pit dewatering can not only achieve a good dewatering control effect, but also control the cost and obtain good economic and environmental benefits. In this study, taking the Shanghai layer ⑨ sand as the research object, the solution injected into the layer ⑨ sand by MICP grouting technology includes bacterial solution (Sporosarcina pasteurii) and cementation solution (urea and CaCl2 solution). The migration mechanism of the bacterial solution and cementation solution in groundwater was analyzed through batch experiment and column test, and the mathematical model of migration was established. The dynamic adsorption characteristics of the S. pasteurii, Ca2+, and urea were obtained by dynamic adsorption test. Through isothermal adsorption test, the Freundlich isotherm was used to describe the isothermal adsorption of S. pasteurii onto fine sand, and the partition coefficient of the S. pasteurii was found to be 1.5 × 10−7 L/mg. The Langmuir isotherm can be used truly reflect the isothermal adsorption of Ca2+ onto fine sand. The distribution coefficient of the Ca2+ was 7 × 10−8 L/mg. The maximum adsorption capacity of the solute was 2404.8 mg/kg. The adsorption capacity of the urea was very small. According to the sand column test, the vertical dispersion was 11.5 cm. Due to the obvious size effect of dispersion, the sensitivity of dispersion in actual working conditions should be analyzed in a subsequent numerical simulation. The determined solute transport parameters provide support for the further study of the numerical simulation of the solute transport process of the HSRB formed by MICP grouting technology and provide a basis for further field application.
Large section tunnels have huge excavation spans, complex excavation procedures, mutual influence among various procedures, multiple disturbances of the surrounding rock, and discontinuous connection among linings under different procedures, which bring great difficulties to their construction. The Caijianwei Mountain No. 2 tunnel of the Xiamen Haicang Evacuate-channel project in China belongs to a super large section tunnel. The tunnel’s maximum excavation section span reaches 30.52 m, and the excavation area reaches 421.73 m2. Its excavation sequence, the timing of the second primary lining support, temporary support disassembly, and secondary lining support of the double-side heading method were analyzed using numerical methods. The excavation sequence of the double side-heading method from the right pilot tunnel to the left pilot tunnel and then to the middle pilot tunnel can avoid a large horizontal displacement at the arch waist and control the deformation of the lining. The excavation sequence from the middle pilot tunnel to the two side pilot tunnels was conducive to the bearing performance of the concrete at the arch crown. The excavation sequence from the two side pilot tunnels to the middle pilot tunnel can better protect the concrete safety at the arch waist. The timing of the second primary lining support, temporary support removal, and secondary lining support have different effects on the deformation and stress of the surrounding rock and support structures. In the construction process, the timing of the second primary lining support, temporary support disassembly, and secondary lining support should be determined according to the actual deformation and stress of the site section. The research results can provide a reference for the construction design of the double-side heading method for large section tunnels.
About Me
Yanxia Long, female, born in 1994 in Guangdong Province, China, doctoral candidate.
Yanxia Long, female, born in 1994 in Guangdong Province, China, doctoral candidate.