The excavation of a shallow buried tunnel may cause stress redistribution in surrounding rock, and cause deformation, damage, and even destruction of adjacent underground pipelines. The land part of the Haicang undersea tunnel in Xiamen of China was a super shallow buried large span double-arch tunnel. Its construction was restricted by both underground excavation safe and adjacent pipeline protection. Multiple groups of working conditions were designed considering the relative position of pipe and tunnel, pipeline and tunnel construction parameters. Numerical simulation was used to study the influence of pipeline horizontal distance, buried depth, pipeline diameter, pipeline wall thickness, pipeline shape, pipeline material and excavation method on the response of adjacent underground pipelines. The results show that the relative position of pipe and tunnel, and the construction method of the double-arch tunnel have a great influence on pipeline deformation. Pipeline material, pipeline diameter and excavation method have a great influence on pipeline stress. The construction method was the key factor affecting the stress and deformation of the pipeline. The three-step reserved core soil method can effectively control the stress and deformation of underground pipelines. The research results can provide a reference for similar projects.
1 July 2022 in International Journal of Geomechanics
The dynamic failure characteristics and fracture process of brittle materials such as rock involves a complex crack propagation process, the underlying mechanics of which is not yet fully understood. At present, the combination of high-speed photography and Digital Image Correlation (DIC) technology is considered to be the most promising and ideal means to observe crack growth and analyze the failure mechanism of rock-like materials. In this work, ultra-high-speed photography is used to investigate the dynamic failure characteristics of fine-grained sandstone, and scanning electron microscope (SEM) is used to investigate the relationship between the mechanical properties and failure law of fine sandstone and strain rate from the micro perspective. Finally, the failure mechanism of the rock is analyzed by combining the DIC technology. It is found that the fine-grained sandstone undergoes five critical moments under impact load, namely, initiation of the first crack, initiation of the second crack, crack penetration, local crushing, and thorough breaking. With the increase of strain rate, the whole failure process of rock specimen is shortened, and the time between two critical moments is shorter and shorter, indicating that the more severe the failure of the rock specimen in a time interval between the critical moments, the shorter the time required for the process, and the less obvious the strain rate effect. The first crack on the rock surface initiates from the direction of the transmission rod. With the increase of the strain rate, the angle between the crack on the rock surface and the axial direction is larger, and the second crack will penetrate the specimen first.
Close excavation section spacing, the mutual influence and interpenetration of various processes, and the multiple disturbances of the middle rock pillar in a small clear-distance tunnel pose great difficulty to construction. This study adopted the small clear-distance tunnel of Xiamen Haicang Evacuate Channel as the research object. The tunnel belonged to a small clear-distance tunnel in an urban super large and complex underground interchange hub where complex adjacent small clear-distance tunnels were adopted. ABAQUS was used to analyze the influence of different excavation schemes, lithological grades, and footage lengths for tunnel stability. The deformation and stress characteristics of the tunnel’s surrounding rock and lining structure in different excavation schemes (full section method, bench method, center diaphragm (CD) method, and double wall heading method), lithological grades (III, IV and V), and footage lengths (3 m, 4 m and 5 m) were introduced. The results showed that the double wall heading method could effectively control the horizontal displacement of the hance, and the overall stress state of the lining in the CD and double wall heading methods were reasonable. The vertical displacement of the surface and vault was positively correlated with the elastic modulus of the rock mass. When no temporary support was present in the grade V rock mass, the area from the hance to the arch foot was prone to large deformation. Reducing the footage was beneficial to controlling the deformation of the vault and hance. This study can provide a reference for the on-site construction of small clear-distance tunnels.
The temporal and spatial effects of a complicated excavation process are vital for an ultra-shallow buried large-span double-arch tunnel excavated under an expressway in service. Numerical simulations are urgent and necessary to understand the effect of the total construction process. Taking Xiamen Haicang tunnel as a research object, the total excavation process of three pilot tunnels and the three-bench reserved core soil method of an ultra-shallow buried large-span double-arch tunnel with a fault fracture zone under an expressway was simulated using software FLAC3D. The deformation of the surface, surrounding rock, underground pipelines, tunnel support structure and partition wall of the three pilot tunnels and the main tunnel was analyzed, and the dangerous areas and time nodes were obtained. When the tunnel was excavated to the fault fracture zone, the deformation of the surface and surrounding rock increased significantly. The rock and soil within 20 m behind the excavation surface of the pilot tunnel were greatly disturbed by the excavation. During the excavation of the main tunnel, the horizontal displacement of the middle partition wall moved slightly towards the main tunnel excavated first. The research results can provide a reference for the construction design of double-arch tunnels.
Ultra-shallow-buried and large-span double-arch tunnels face complex risks during construction. The risk sources are hidden, complicated, and diverse. The dynamic risk assessment problem cannot be solved satisfactorily by using the static method as an insufficient amount of research has been conducted. The land part of the Xiamen Haicang double-arch tunnel was selected as the background for the dynamic risk assessment of ultra-shallow-buried and large-span double-arch tunnel construction. The construction process was divided into five stages: pre-construction preparation; ground and surrounding rock reinforcement; pilot tunnel excavation; and the single-and the double-tunnel excavations of the main tunnel. Through consultation with tunnel experts, six first-level and thirty second-level risk evaluation indexes were proposed. The benchmark weight of the dynamic risk assessment index was determined by using the analytic hierarchy process. The weight of the risk evaluation index was revised according to the monitoring data and the construction stage. The fuzzy evaluation matrix of the construction risk membership degree was obtained by using the fuzzy comprehensive assessment method, and the calculation results were analyzed using the subsection assignment method. Control measures were suggested according to the risk assessment results. The risk assessment result of the double tunnel excavation stage of the main tunnel was level II, and the risk level was the highest among the five construction stages. The risk assessment result of the ground and surrounding rock reinforcement stage was level IV, and the risk level was the lowest. The dynamic construction safety risk assessment based on the fuzzy comprehensive assessment method is more timely, accurate, and reasonable than the traditional assessment method. The method can be adopted in similar engineering projects.
For an ultra-shallow buried double-arch tunnel with a large cross-section, the arching effect is difficult to form in surrounding rock, and grouting method is often adopted to reinforce the surrounding rock. Hence, examining the grouting reinforcement parameters is of great significance for potential failure and collapse prevention. The land part of Haicang undersea tunnel was selected as a case study; laboratory experiments, theoretical analysis, and numerical simulation were performed to determine the grouting solid strength and grouting reinforcement parameters. The effects of different water–cement ratios on slurry fluidity, setting time, bleeding rate, and sample strength were studied by laboratory experiments. A method was proposed to determine the shear strength parameters of grouted surrounding rock through the grout water–cement ratio and the unconfined compressive strength of the rock mass. Numerical simulations were performed for grouting reinforcement layer thickness and the water–cement ratios. The deformation and stability law of tunnel surrounding rock and its influence on surrounding underground pipelines were obtained considering the spatial effect of tunnel excavation and grouting reinforcement. The reasonable selection range of grouting reinforcement parameters was proposed. The initial setting time and bleeding rate of cement slurry increased with the increasing water–cement ratio, while the viscosity of cement slurry and sample strength decreased with the increasing water–cement ratio. The shear strength parameters of grouted surrounding rock were determined by the water–cement ratio of grout and unconfined compressive strength of rock mass before grouting. When the thickness of grouting reinforcement layer h = 1.5 m and the water–cement ratio of grout was suggested η = 0.85, the surface settlement, the deformation of the vault, and the deformation of the nearby pipeline all met the design. Moreover, the construction requirements were more economical. Research results can provide a reference for the selection of grouting reinforcement parameters for similar projects.