The ITER Test Blanket Modules (TBMs) are installed and operated inside the vacuum vessel (VV) at the equatorial ports located within port plugs (PP), and each of them includes two TBMs. After each plasma operation campaign, the TBM research plan testing program requires the replacement of the TBMs by new ones during the ITER long-term shutdown (LTM). The replacement of a TBM requires the removal/reinstallation of all test blanket system (TBS) equipment present in the port cell (PC), including those in the port interspace called pipe forest (PF). The TBS equipment in PC shall be designed so that occupational radiation exposure can be as low as reasonably achievable (ALARA) over the life of the plant to follow the ITER Policy. To implement ALARA process requirements, a design shall consider careful integration assessment since early phase to address all engineering aspects of the replacement sequence. The design of the TBS equipment in PC shall optimize the reconfiguration operation by including human factor considerations and providing adequate space. Provisions for dose reduction measures (DRMs) considering protection means and minimization of occupancy times in radiation fields are also investigated by assessing remote technics to reduce operator exposure. This article describes engineering investigations for optimized PF replacement operations in various engineering fields. Results on the design of the TBS equipment in the TBM-PC are discussed. The PF design shall implement nuclear engineering aspects. Design options shall demonstrate constructability and maintainability meaning compliance with ALARA process and adequate construction codes (RCC-MRx, EN 13480). TBM-PP replacement sequence drives several elements of the TBM-PC component design and associated integration. Concepts are discussed with regard to nuclear engineering and operation aspects. Use of prototyping demo, including virtual reality (VR), will support the preliminary validation during the system engineering process in order to prepare the full-scale mock-up validation phase.
The objective of the ITER test blanket module (TBM) program is to provide experimental data on the performance of the breeding blankets in the integrated fusion nuclear environment. The ITER test blanket modules are installed and operated inside the vacuum vessel (VV) at the equatorial ports located within port plugs (PP), and each PP includes two TBMs. After each 18-month-long plasma operation campaign, the TBM research plan testing program requires the replacement of the TBMs with new ones during the ITER long-term shutdown, called long-term maintenance (LTM). The replacement of a TBM requires the removal/reinstallation of all test blanket system (TBS) equipment present in the port cell (PC), including those in the port interspace (PI), called pipe forest (PF). TBSs shall be designed so that occupational radiation exposure (ORE) can be as low as reasonably achievable (ALARA) over the life of the plant to follow the ITER policy. To implement ALARA process requirements, design activities shall consider careful integration investigations starting from the early phase to address all engineering aspects of the replacement sequence. The case study focuses on the PF replacement, in particular the port cell operations. This paper describes the investigations and findings of the ALARA optimisation process implementation in the early engineering phase of the PF.
4 October 2024 in IEEE Transactions on Plasma Science
The use of Extended Reality (XR) technologies virtual and augmented reality (AR) is establishing itself more and more in design, construction and operation applications in industrial and research sectors that aim to employ digital technologies with a human-centered design approach. At ITER, a methodology that includes these technologies is applied in the design study of test blanket module (TBM) port cell (PC) components and replacement operation. The use of virtual prototyping at early design phases permits anticipating issues related to human operation and accessibility. Therefore, design optimization is performed before manufacturing the actual feasibility mock-ups. XR sessions are organized involving several design experts interacting with the various components 3-D models at the same time to facilitate the design decisions and to optimize the procedures. The main asset of this XR approach is to offer different means to support the decisions and onboard all participants. The simulations are prepared by building a virtual mock-up based on native CAD models available in databases for the different systems integrated into the Tokamak building. The complexity of the systems and the large amount of data to display require data preprocessing in order to ensure a reliable representation of the scenarios to be simulated. The reliability of the 3-D data and the consideration of the risks and the environmental conditions of the areas to be simulated are essential for making applicable and sound decisions. The aim of this article is to provide a method to realize reliable XR simulations following a documented workflow usable across the ITER project. The method is based on the realization of an XR-maintenance verification plan as an input for the XR simulation and of a maintainability verification document based on the results available from XR simulations. The experience and the results gained from the TBM PC design activities involving virtual reality (VR) simulations are also discussed.
ITER is an international collaborative effort towards the realization of fusion energy via the magnetic confinement concept. Two of the equatorial ports in the facility are dedicated to the testing of tritium breeding concepts, which is essential for the tritium self-sufficiency of future fusion reactors. The concerned Test Blanket System (TBS) consists of a Test Blanket Module (TBM) residing inside the TBM–Port Plug (TBM-PP) and its associated ancillary systems in the Tokamak facility. In this paper, the results of a full suite of nuclear analyses concerning the shielding performance of the Pipe Forest (PF) and Bioshield Plug (BP), to reflect on the evolution of their designs, are discussed. On the BP side, the design of the peripheral part has been reviewed considering the ventilation openings and butterfly doors, to assure the design compliance with the Radiation Map (RadMap) requirements for the neutron flux in the Port Cell (PC), behind the BP. On the PF side, the pipes routing and maintenance corridor door have been redesigned, by taking into account results from previously concluded nuclear analyses. The neutronics model was developed from CAD and was used to perform transport simulations in two plasma modes: on and off. For plasma-on mode, the plasma neutron field in the Port Interspace (PI) as well as behind the BP was assessed and few shielding options were explored. The responses due to decay neutrons from 17N in activated cooling water were also considered. For the plasma-off mode, the focus was shifted to further refine the ShutDown Dose Rate (SDDR) maps, which is of importance for maintenance operations that are foreseen to take place at various stages of ITER operation, in particular following the FPO-1, FPO-2, and Short operation scenarios. In addition, detailed activation analyses were carried out to provide a provisional waste classification.