IOSIF KAPELLAKIS

Dr. IOSIF KAPELLAKIS

Civil Engineering, Neapolis University Pafos, Paphos, Páfos, Cyprus
orcid

Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 April 2007 in Reviews in Environmental Science and Bio/Technology
Verified
Journal Article
Closed access
PDF file
IOSIF KAPELLAKISIOSIF KAPELLAKIS
IOSIF KAPELLAKIS
Konstantinos P. TsagarakisKonstantinos P. Tsagarakis
Konstantinos P. Tsagarakis
JCJohn C. Crowther
John C. Crowther

1 April 2006 in Agricultural Water Management
Verified
Journal Article
Closed access
IOSIF KAPELLAKISIOSIF KAPELLAKIS
IOSIF KAPELLAKIS
Konstantinos P. TsagarakisKonstantinos P. Tsagarakis
Konstantinos P. Tsagarakis
CACh. Avramaki
Ch. Avramaki
AAA.N. Angelakis
A.N. Angelakis

1 January 2004 in Resources, Conservation and Recycling
Verified
Journal Article
Closed access
NHN. Hytiris
N. Hytiris
IOSIF KAPELLAKISIOSIF KAPELLAKIS
IOSIF KAPELLAKIS
RDR.La Roij de
R.La Roij de
Konstantinos P. TsagarakisKonstantinos P. Tsagarakis
Konstantinos P. Tsagarakis

12 March 2012 in Water
Verified
Journal Article
Open access
PDF file
IOSIF KAPELLAKISIOSIF KAPELLAKIS
IOSIF KAPELLAKIS
Nikos ParanychianakisNikos Paranychianakis
Nikos Paranychianakis
Konstantinos P. TsagarakisKonstantinos P. Tsagarakis
Konstantinos P. Tsagarakis
AAAndreas N. Angelakis
Andreas N. Angelakis
The objective of this study was to investigate the application of constructed wetlands as a mean to manage olive mill wastewater (OMW). Two free water surface (FWS) constructed wetlands, one without (CW1) and one with effluent recirculation (CW2), were operated for a two-year period with diluted OMW (1:10) and evaluated in terms of the removal of COD, TSS, TKN, NH4+-N, NO3−-N, TP and total phenols. The organic loading rate of CWs was adjusted to 925 kg BOD/ha·d. In CW1 the removal efficiency averaged 80%, 83%, 78%, 80%, and 74% for COD, TSS, TKN, TP, and total phenols, respectively, during the operation period. Effluent recirculation further improved the treatment efficiency which approached 90%, 98%, 87%, 85%, and 87% for COD, TSS, TKN, TP, and total phenols, respectively. Constructed wetlands also showed high removal efficiency for NH4+-N. Nitrate concentration maintained low in both CWs basins, probably due to the prevalence of high denitrification rates that efficiently removed the NO3--N produced by NH4+-N oxidation. Despite the increased removal percentages, pollutant concentration in effluent exceeded the allowable limits for discharge in water bodies, suggesting that additional practices, including enhanced pre-application treatment and/or higher dilution rates, are required to make this practice effective for OMW management.

22 January 2015 in Water
Verified
Journal Article
Open access
PDF file
IOSIF KAPELLAKISIOSIF KAPELLAKIS
IOSIF KAPELLAKIS
Vasileios TzanakakisVasileios Tzanakakis
Vasileios Tzanakakis
AAAndreas N. Angelakis
Andreas N. Angelakis
Land application of olive mill wastewater (OMW) is considered a promising low-cost practice for olive-oil producing countries. The objectives of this work were to investigate: (i) OMW treatment potential of a land treatment system (LTS), planted with a E. camaldulensis species, regarding N, P, C, and phenols; (ii) the effects of OMW on chemical properties of soil and soil solution characteristics; and (iii) the performance of E. camaldulensis in terms of biomass production and N and P recovery. E. camaldulensis received OMW for two growing seasons at rates based on maximum organic loading. These rates were almost equivalent to the reference evapotranspiration of the area. Soil solution and soil samples were collected from three different depths (15, 30 and 60 cm) at specified time intervals. -Also, samples of plant tissues were collected at the end of application periods. OMW land application resulted in significant reduction in inorganic and organic constituents of OMW. At 15 cm of soil profile, the average removal of COD, TKN, NH4+-N, TP, In-P, and total phenols approached 93%, 86%, 70%, 86%, 82%, and 85%, respectively, while an increase in soil depth (30 and 60 cm) did not improve significantly treatment efficiency. Furthermore, OMW increased soil organic matter (SOM), total kjeldahl nitrogen (TKN), and available P, particularly in the upper soil layer. In contrast, low inorganic N content was observed in the soil throughout the study period caused probably by increased competition among soil microorganisms induced by the organic substrate supply and high C/N ratio. Also, electrical conductivity (EC) and SAR increased by OMW addition, but at levels that may do not pose severe risk for soil texture. Enhancement of soil fertility due to OMW application sustained eucalyptus trees and provided remarkable biomass yield. In conclusion, land application of OMW has a great potential for organic matter and phenol assimilation and can be effectively used for OMW detoxification.

27 March 2024 in Energies
Verified
Journal Article
Open access
PDF file
ACAndreas Constantinides
Andreas Constantinides
Martha KatafygiotouMartha Katafygiotou
Martha Katafygiotou
Thomas DimopoulosThomas Dimopoulos
Thomas Dimopoulos
IOSIF KAPELLAKISIOSIF KAPELLAKIS
IOSIF KAPELLAKIS
The energy efficiency of existing buildings is a crucial factor in addressing energy consumption challenges in European countries, accounting for nearly 40% of the total energy usage. One such country is Cyprus, which faces significant challenges in transforming its existing building stock into energy-efficient and sustainable structures. To face this situation, extensive focus has been made by the government on the energy-efficient retrofit of non-residential public buildings erected before 2010, which lack any energy efficiency measures. This study examines the case of the Pano Polemidia Cultural Hall (PPCH), which represents the building stock of that period. Through the simulation of two scenarios, before and after the adoption of retrofit measures, the existing energy performance is initially evaluated and then the adoption of sustainable solutions, which improve substantially the energy efficiency and can be easily adopted from the relevant authorities, is explored. These retrofit measures include installation of HVAC system, covering of the shell of the building with external thermal insulation, lighting replacement with LED devices, installation of PV system and solar panels, and replacement of the external openings with aluminum windows. The results derived show that the energy consumption of the building was reduced from 468 to 218 kWh/m2·yr, with renewable energy sources (RESs) contributing 177 kWh/m2·yr, the CO2 emissions were reduced from 136.73 to 11.5 kg/m2·yr, while the reduction in energy consumption per sector ranged from 25% in lighting to 83% in hot water. Therefore, it is evident that a comprehensive retrofitting plan can transform the PPCH into a near-zero energy consumption building that also provides value to the local community and can act as a successful example for any other non-residential buildings with similar characteristics.