Ariovaldo Denis Granja

Prof. Ariovaldo Denis Granja

orcid

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2019 in Journal of Management in Engineering
Verified
Journal Article
Closed access
FCFederica Costa
Federica Costa
AGAriovaldo Denis Granja
Ariovaldo Denis Granja
AFAndrea Fregola
Andrea Fregola
FPFlavio Picchi
Flavio Picchi
ASAlberto Portioli Staudacher
Alberto Portioli Staudacher
The construction industry is lagging behind other industries in terms of efficiency and performance. Lean-oriented supply chain management (SCM) initiatives have not yet led to significant improvements because of the peculiarities of the industry. In this regard, the construction industry is characterized by poor collaboration, conflicts, disputes, and a lack of customer focus and end-user involvement. These peculiarities make partnering in construction industry projects somewhat difficult. Practitioners, researchers, and societies at large have, therefore, called for a change in attitudes, behaviors, and procedures to increase the chances of a project’s success. First, this study performed a systematic literature review followed by eight structured interviews to understand the most important barriers that prevent the collaboration in customer–supplier relationships in construction supply chains. Second, the Decision-Making Trial and Evaluation Laboratory (DEMATEL) analysis provided a new understanding of the barriers by showing cause–effect associations among them to promote collaboration in the construction industry’s SCM. This new understanding can be used to orient more effective actions to improve the customer–supplier relationship in the construction supply chain. The main findings show that three of the four barriers that act as causes are industry-related barriers, and the main finding depends on the specific temporary configuration that characterizes a project-based industry. Among the causes, there is also an organizational barrier that highlights how a clear definition of a project’s roles and responsibilities impacts collaboration.

19 July 2017 in Construction Management and Economics
Verified
Journal Article
Open access
APAntti Peltokorpi
Antti Peltokorpi
HOHylton Olivieri
Hylton Olivieri
AGAriovaldo Denis Granja
Ariovaldo Denis Granja
Olli SeppänenOlli Seppänen
Olli Seppänen
Modularization has recently attracted considerable interest among academics and practitioners. In the construction industry, several modular solutions have been introduced and examined; however, hardly any study comprehensively classifies the different modularization strategies according to their possibility to achieve various objectives of building investments. This research aims to develop a framework for identifying and classifying modularization strategies in construction according to their suitability to achieve the specific outcomes intended for a building or its subsystem. Using the literature on product modularity, product platforms and production strategies as a basis, this study has developed a theoretical framework that proposes connections between the main objectives of a building investment and the dimensions of modularization strategies. The framework is elaborated by testing the propositions, based on an empirical analysis of nine real-life case studies. The findings reveal that modularization can be a suitable approach to develop an innovative design solution; improve a project’s quality, cost and schedule performance; and enable flexibility in building use and maintenance. However, suggestions for achieving these objectives vary from project organization-driven to collaborative, integrated or supplier-driven modularization strategies. Developers, owners, contractors and module suppliers can use the framework when positioning and developing their roles in the construction supply chain.

10 May 2018 in Building Research & Information
Verified
Journal Article
Closed access
DKDoris Catharine Cornelie Knatz Kowaltowski
Doris Catharine Cornelie Knatz Kowaltowski
EMElisa Atália Daniel Muianga
Elisa Atália Daniel Muianga
AGAriovaldo Denis Granja
Ariovaldo Denis Granja
DMDaniel de Carvalho Moreira
Daniel de Carvalho Moreira
SBSidney Piochi Bernardini
Sidney Piochi Bernardini
MCMariana Rios Castro
Mariana Rios Castro
A recent expansion of mass-housing programmes has occurred in emerging economies. The analysis of research on programmes raises questions about what type of research is produced and what its impact is on housing. The Brazilian ‘My House, My Life’ (Minha Casa, Minha Vida – MCMV) programme demonstrates that more of the same type of housing is produced and that the focus of most research repeats the same mistakes. Three million homes have been built and the research community has examined the programme’s social, economic and environmental impacts. A total of 2477 scientific studies on MCMV are analyzed. Few studies were found to assess living conditions from a user perspective at the residential unit scale. Although improvements have occurred on some social issues, the siting of housing on the urban periphery is problematic for urban mobility, social segregation and aesthetic monotony. Also, the design model does not respond to the diverse needs of inhabitants. Opportunities are identified for actions and essential missing research on mass housing. Retrofit strategies are urgent and social cost studies should induce change to the design model. Evidence-based research is needed to support policies and design processes for affordable and quality housing solutions that value users, their needs and aspirations.

2 July 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
ACAdrieli Carvalho
Adrieli Carvalho
AGAriovaldo Denis Granja
Ariovaldo Denis Granja
VSVanessa Gomes da Silva
Vanessa Gomes da Silva
The construction industry is increasingly moving towards the adoption of sustainable strategies and increased efficiency targets. Lean thinking (LT) aims at removing waste, increasing value, reducing costs, and improving the overall quality of products and processes. Sustainability, in turn, is concerned with the environmental, social, and economic impacts made by the construction industry. Both philosophies share efficient resource usage concerns. A systematic literature review (SLR) was carried out to cover the existing primary research and characterize its evolution and setting; to discuss the available empirical evidence to identify the LT and sustainability benefits and trade-offs; and to provide a holistic setting to promote those synergies. To catalyze the synergies between LT and sustainability, this paper highlights the potential application of LT elements throughout a building’s lifecycle. Knowledge synthetized is helpful for decision-makers to understand and explore combinations of the performance-oriented LT philosophy for the provision of environmentally responsive buildings.

1 December 2019 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
HOHylton Olivieri
Hylton Olivieri
Olli SeppänenOlli Seppänen
Olli Seppänen
TAThais da C. L. Alves
Thais da C. L. Alves
NSNatalie M. Scala
Natalie M. Scala
VSVincent Schiavone
Vincent Schiavone
AGAriovaldo Denis Granja
Ariovaldo Denis Granja
In construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last planner system (LPS), and location-based techniques (LB). Studies have addressed these systems, mostly in isolated fashions. This study aims to compare and contrast their use in terms of PM and PPM and clarify industry benefits in order to eliminate potential misunderstandings about their use. A survey was administered to construction professionals in Brazil, China, Finland, and the United States. No single system addresses all needs of PM and PPM. CPM is the dominant system when considering the following characteristics: primary industry types, type of organization, size of organization, professional position within the organization, and area of work. Contributions to knowledge include that CPM is a contract requirement with perceived benefits associated with critical path analysis; LB and LPS have perceived benefits regarding continuous flow and use of resources, treatment of interferences, and improving production control. All systems were found to have a similar level of benefits for management of contracts, delay and change, and evaluation of the root causes of delays. The industry can benefit from aligning project scheduling methods with project needs.

1 July 2011 in Habitat International
Verified
Journal Article
Closed access
DKDoris C.C.K. Kowaltowski
Doris C.C.K. Kowaltowski
AGAriovaldo Denis Granja
Ariovaldo Denis Granja