This perspectives article addresses risk in cyber defense and identifies opportunities to incorporate risk analysis principles into the cybersecurity field. The Science of Security (SoS) initiative at the National Security Agency seeks to further and promote interdisciplinary research in cybersecurity. SoS organizes its research into the Five Hard Problems (5HP): (1) scalability and composability; (2) policy‐governed secure collaboration; (3) security‐metrics–driven evaluation, design, development, and deployment; (4) resilient architectures; and (5) understanding and accounting for human behavior. However, a vast majority of the research sponsored by SoS does not consider risk and when it does so, only implicitly. Therefore, we identify opportunities for risk analysis in each hard problem and propose approaches to address these objectives. Such collaborations between risk and cybersecurity researchers will enable growth and insight in both fields, as risk analysts may apply existing methodology in a new realm, while the cybersecurity community benefits from accepted practices for describing, quantifying, working with, and mitigating risk.
1 December 2019 in Journal of Construction Engineering and Management
In construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last planner system (LPS), and location-based techniques (LB). Studies have addressed these systems, mostly in isolated fashions. This study aims to compare and contrast their use in terms of PM and PPM and clarify industry benefits in order to eliminate potential misunderstandings about their use. A survey was administered to construction professionals in Brazil, China, Finland, and the United States. No single system addresses all needs of PM and PPM. CPM is the dominant system when considering the following characteristics: primary industry types, type of organization, size of organization, professional position within the organization, and area of work. Contributions to knowledge include that CPM is a contract requirement with perceived benefits associated with critical path analysis; LB and LPS have perceived benefits regarding continuous flow and use of resources, treatment of interferences, and improving production control. All systems were found to have a similar level of benefits for management of contracts, delay and change, and evaluation of the root causes of delays. The industry can benefit from aligning project scheduling methods with project needs.
Collaborative scheduling (CS) and related practices impact the performance of construction projects which can be measured by key performance indicators (KPIs). However, little is known about which of these practices are implemented and how their combined implementation might impact KPIs. The objectives of this research are to identify perceptions of CS practices that drive project performance, define CS practices used by industry that impact KPIs, and establish practices that are more commonly implemented and have a higher potential to positively impact KPIs. The research team conducted a nationwide survey in the United States and obtained 241 usable responses. Utilizing an information theory approach to measure the uncertainty of implementation and impact of each practice, the research built a set of Chow–Liu tree models to determine the most efficient sequence of actions to improve CS. Results indicate that meeting owners’ expectation throughout the life-cycle of the project from design through construction and commissioning, using the schedule to support a strong project culture, and an effective communication plan were the top CS levers for overall KPI improvement. An innovative method was developed to help construction project managers discover the value of each CS practice, the relation between CS practices, and CS practices’ influence to project KPIs so that managers can improve KPIs efficiently by prioritizing their CS practices according to their own project needs.
1 February 2014 in IEEE Transactions on Engineering Management
This paper presents a methodology for developing a spare parts inventory management system with a focus on the nuclear power sector. Often, demand for spare parts is highly intermittent and cannot be accurately forecasted through traditional methods. Examples include nuclear power generation equipment, ground space systems, and aircraft engine parts. We take a data-driven engineering management approach and develop a four-step methodology for spare parts management in such environments. These steps comprise an influence diagram for identifying relevant factors, weighting of influences through the analytic hierarchy process, grouping parts according to inventory criticality indices, and the development of base stock inventory policies for each group. This approach allows the system to be actively managed within a continuous improvement framework through employee engagement and input, and mathematical assumptions are not made in the models. To our knowledge, no such integrated, comprehensive methodology for spare parts has been developed. The techniques employed in this research can be effectively used together to holistically manage the entire spare parts process, or they may be used separately to manage portions of the process. This paper provides an overview of the methodology, and the entire approach is illustrated via a test bed nuclear power generation facility.