Eloísa Castilho

Ms. Eloísa Castilho

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2018 in Engineering Structures
Verified
Journal Article
Closed access
ECEloísa Castilho
Eloísa Castilho
NSNoemí Schclar
Noemí Schclar
CTCarlos Tiago
Carlos Tiago
Maria Luísa Braga FarinhaMaria Luísa Braga Farinha
Maria Luísa Braga Farinha

8 September 2025 in Construction and Building Materials
Verified
Journal Article
Open access
ECEloísa Castilho
Eloísa Castilho
JFJoão Firmo
João Firmo
MGMário Garrido
Mário Garrido
JCJoão R. Correia
João R. Correia
MRMarcos Roque
Marcos Roque

22 April 2023 in Eng
Verified
Journal Article
Open access
PDF file
Noemi Alejandra Schclar LeitãoNoemi Alejandra Schclar Leitão
Noemi Alejandra Schclar Leitão
ECEloísa Castilho
Eloísa Castilho
Most of the larger hydropower plants in Western Europe, the former Soviet Union, North America and Japan were constructed between the 1940s and 1970s. This implies that the rehabilitation or repair of existing dams is a top priority, which entails new challenges for the dam engineering community. Since no two dams are the same, in cases in which abnormal behavior is suspected, an in-depth diagnosis of the state of the dam to define the causes and consequences of the damage is required. To illustrate the diagnostic process, an old concrete arch dam is presented which showed signs of reservoir water seepage through some construction joints, resulting in a buildup of calcium carbonate on the downstream face. After analyzing the available data, we put forward a hypothesis that the high temperature gradient promoted the opening of some construction joints on the upstream face during the first filling of the reservoir. Over time, water penetration expanded the cracks, reaching the downstream face. To prove our diagnosis, a chemo-thermo-mechanical finite element analysis was carried out in order to simulate the behavior of the dam during its construction and initial impoundment.

3 February 2023 in CivilEng
Verified
Journal Article
Open access
PDF file
Noemi Alejandra Schclar LeitãoNoemi Alejandra Schclar Leitão
Noemi Alejandra Schclar Leitão
ECEloísa Castilho
Eloísa Castilho
Maria Luísa Braga FarinhaMaria Luísa Braga Farinha
Maria Luísa Braga Farinha
During the first filling, the reservoir is gradually raised in multiple stages. At each stage, the filling is paused to allow adequate time for monitoring and evaluating the performance of the dam and its foundation. The analysis of the monitored behavior and assessment of security conditions is performed by comparing the values measured by the monitoring system installed in the dam with the values predicted by numerical models representing the structural behavior, the material properties, and the loads. This article addresses the main aspects related to the safety control of concrete arch dams during the first filling of the reservoir. Special attention is given to the nonlinear behavior induced by the opening/closing of the contraction joints. An example of numerical simulation of the behavior of an arch dam during the first filling of the reservoir is also presented. The validation of the computed temperatures, the induced displacements and the induced stresses was performed by comparison with the values measured with the monitoring system installed in the dam.


3 January 2026 in Construction and Building Materials
Verified
Journal Article
Open access
ECEloísa Castilho
Eloísa Castilho
MSMário F. Sá
Mário F. Sá
JFJoão P. Firmo
João P. Firmo
MGMário Garrido
Mário Garrido
JCJoão R. Correia
João R. Correia
Pietro MazzucaPietro Mazzuca
Pietro Mazzuca