Noemi Alejandra Schclar Leitão

Dr. Noemi Alejandra Schclar Leitão

National Laboratory of Civil Engineering (LNEC)
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 January 2022 in Geotechnics
Verified
Journal Article
Open access
PDF file
Maria Luísa Braga FarinhaMaria Luísa Braga Farinha
Maria Luísa Braga Farinha
Nuno Monteiro AzevedoNuno Monteiro Azevedo
Nuno Monteiro Azevedo
Noemi Alejandra Schclar LeitãoNoemi Alejandra Schclar Leitão
Noemi Alejandra Schclar Leitão
JAJoao R Almeida
Joao R Almeida
SOSérgio Oliveira
Sérgio Oliveira
Evaluation of the sliding stability of concrete dams requires the use of numerical tools not only able to simulate the coupled hydromechanical behavior but also able to adequately represent the foundation discontinuities and the specific features of dam foundations. The formulation of a three-dimensional (3D) small displacement finite element model based on interface elements to simulate the discontinuities is presented. In this model, the hydraulic behavior is simulated assuming that the water flow occurs only along channels located at the edges of the triangular interface elements that simulate the discontinuities. The model is used to perform coupled hydromechanical analysis of a large arch-gravity dam and to assess safety against dam base sliding, assuming different constitutive models at the dam/foundation interface and two different approaches: (i) strength reduction method and (ii) amplification of the hydrostatic pressure, assuming an increase in the reservoir level. The present study shows that consistent results are obtained with the proposed numerical model and that stability analysis should preferably be carried out using the method of increasing the hydrostatic pressure and the corresponding uplift pressures, as this methodology leads to significantly lower safety factors.

1 May 2018 in Journal of Engineering Mechanics
Verified
Journal Article
Closed access
Carlos SerraCarlos Serra
Carlos Serra
Nuno Monteiro AzevedoNuno Monteiro Azevedo
Nuno Monteiro Azevedo
ABAntónio Lopes Batista
António Lopes Batista
Noemi Alejandra Schclar LeitãoNoemi Alejandra Schclar Leitão
Noemi Alejandra Schclar Leitão
Detailed models of concrete mesostructure can be used to understand the interactions between its components and predict complex deterioration scenarios. The discrete or distinct element method (DEM) is currently being used for modeling the fracture process of quasibrittle materials, such as rock and concrete. An explicit formulation of a DEM contact model that includes aging viscoelastic behavior based on the solidification theory is proposed, allowing the DEM particle model to be applied to delayed concrete analysis. Because of the timestep constraints of the DEM, a fast numerical procedure for the analysis of long-term aging viscoelastic behavior of concrete is also proposed. A calibration procedure for the aging viscoelastic contact model parameters is presented, including new expressions for the delayed deformability macro properties. The presented validation tests using a one-contact particle assembly show good agreement between the fast numerical procedure, the fully explicit DEM procedure with small timestep, and the creep compliance analytical solution. The contact aging model validation tests using larger regular and random particle assemblies show that the fast numerical procedure significantly reduces the computational costs by introducing large timesteps in which the solution is computed while giving the same accuracy as the fully explicit procedure. The DEM aging concrete model is validated using a B3 model fit to Ward et al.’s experimental results for different loading ages. The obtained numerical results show that the DEM aging viscoelastic particle model, considering the concrete mesostructure can predict the long-term behavior of concrete once the contact properties of each component are properly calibrated (mortar, aggregate, and interfacial transition zone).

22 April 2023 in Eng
Verified
Journal Article
Open access
PDF file
Noemi Alejandra Schclar LeitãoNoemi Alejandra Schclar Leitão
Noemi Alejandra Schclar Leitão
ECEloísa Castilho
Eloísa Castilho
Most of the larger hydropower plants in Western Europe, the former Soviet Union, North America and Japan were constructed between the 1940s and 1970s. This implies that the rehabilitation or repair of existing dams is a top priority, which entails new challenges for the dam engineering community. Since no two dams are the same, in cases in which abnormal behavior is suspected, an in-depth diagnosis of the state of the dam to define the causes and consequences of the damage is required. To illustrate the diagnostic process, an old concrete arch dam is presented which showed signs of reservoir water seepage through some construction joints, resulting in a buildup of calcium carbonate on the downstream face. After analyzing the available data, we put forward a hypothesis that the high temperature gradient promoted the opening of some construction joints on the upstream face during the first filling of the reservoir. Over time, water penetration expanded the cracks, reaching the downstream face. To prove our diagnosis, a chemo-thermo-mechanical finite element analysis was carried out in order to simulate the behavior of the dam during its construction and initial impoundment.

23 October 2023 in Thermo
Verified
Journal Article
Open access
PDF file
Noemi Alejandra Schclar LeitãoNoemi Alejandra Schclar Leitão
Noemi Alejandra Schclar Leitão
SOSérgio Oliveira
Sérgio Oliveira
In order to conduct thermal analysis of concrete dams, it is necessary to assess and validate the spatiotemporal representations used for modeling the solar radiation and the water temperature boundary conditions. To illustrate this procedure, the thermal analysis of a concrete multiple-arch dam is presented. The article starts by providing an overview of the problem before focusing explicitly on the estimation of solar radiation distribution. Within this section, a comparison between the solar irradiance computed on the downstream face of the dam with or without considering the beam radiation shading at different times of the year is presented. This is followed by an analysis of the seasonal behavior of the water temperature of the dam’s reservoir based on measured data. After calibrating an empirical/statistical law based on temperatures measured at different depths, it is compared with the values estimated by a hydrodynamic model and some temperature profiles measured upstream of the dam. Finally, the article compares the results obtained with the thermal analysis versus the temperature measured by thermometers installed in the concrete.

3 February 2023 in CivilEng
Verified
Journal Article
Open access
PDF file
Noemi Alejandra Schclar LeitãoNoemi Alejandra Schclar Leitão
Noemi Alejandra Schclar Leitão
ECEloísa Castilho
Eloísa Castilho
Maria Luísa Braga FarinhaMaria Luísa Braga Farinha
Maria Luísa Braga Farinha
During the first filling, the reservoir is gradually raised in multiple stages. At each stage, the filling is paused to allow adequate time for monitoring and evaluating the performance of the dam and its foundation. The analysis of the monitored behavior and assessment of security conditions is performed by comparing the values measured by the monitoring system installed in the dam with the values predicted by numerical models representing the structural behavior, the material properties, and the loads. This article addresses the main aspects related to the safety control of concrete arch dams during the first filling of the reservoir. Special attention is given to the nonlinear behavior induced by the opening/closing of the contraction joints. An example of numerical simulation of the behavior of an arch dam during the first filling of the reservoir is also presented. The validation of the computed temperatures, the induced displacements and the induced stresses was performed by comparison with the values measured with the monitoring system installed in the dam.