Xu Shuo

Dr. Xu Shuo


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 January 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
XSXu Shuo
Xu Shuo
QXQiang Xu
Qiang Xu
YZYongquan Zhu
Yongquan Zhu
ZGZhongzheng Guan
Zhongzheng Guan
ZWZenghui Wang
Zenghui Wang
HFHaobo Fan
Haobo Fan
With the rapid development of high-speed railroads and subways, there has been an increasing number of bridge–tunnel overlapping structures. To study the dynamic response characteristics of bridge–tunnel structures under the synergistic effects of the vibration generated by high-speed railway and subway trains, the dynamic response characteristics of a bridge–tunnel structure under single-point vibration loading was analyzed by conducting numerical simulations and model tests, with the frequency response function and peak acceleration as the evaluation indices. The dynamic response characteristics of the overlapping structure under moving vibration loads of the high-speed railway and subway trains were further analyzed. The results showed that the dynamic response of the bridge–tunnel overlapping structure increased with the increase in the frequency under the full frequency domain single-point sweep vibration load. The dynamic response of the tunnel hance near the pile foundation side was significantly greater than the vault and invert. Compared with the effect of high-speed train loads alone, the dynamic response of the bridge–tunnel overlapping structure under the synergistic effects of high-speed railways and subways increased significantly and varied at different locations. This investigation provides theoretical support for the design and construction of bridge–tunnel overlapping structures under the synergistic effects of high-speed railways and subways, contributing to improving engineering quality and safety.

16 July 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
QXQiang Xu
Qiang Xu
YZYongquan Zhu
Yongquan Zhu
XSXu Shuo
Xu Shuo
HFHaobo Fan
Haobo Fan
DWDapeng Wang
Dapeng Wang
YLYong Li
Yong Li
In order to study the dynamic response characteristics of a pile-soil foundation when an adjacent tunnel exists, both model tests and numerical simulations were performed in this study. Taking the peak vibration acceleration, peak vibration velocity, and peak vibration displacement as the evaluation indexes of the dynamic response, the dynamic response of the pile-soil foundation with an adjacent tunnel under high-speed train loads is studied. A method of dividing the affected zones of the dynamic response based on the safety threshold is provided in this paper, which can evaluate the safety of the adjacent tunnel under the action of train load. Additionally, the effect of train speed on dynamic response is further analyzed. The results show that the dynamic response index inside the foundation decays significantly with increasing distance from the surface when the train load is applied, regardless of the presence or absence of the adjacent tunnel. Compared with an ordinary pile-soil foundation, the dynamic response indexes inside the foundation increase significantly when there is an adjacent tunnel. With the increase in the horizontal distance from the pile foundation, the distribution characteristics of the horizontal transverse direction of each dynamic response index inside the foundation change from a “wavy” distribution to a monotonically decreasing distribution. According to the safety threshold of vibration velocity, the foundation is divided into the hazardous affected zone, strongly affected zone, and weakly affected zone, and then the corresponding vibration reduction measures are adopted. With the increase in train speed, the effect of tunnel structure on the attenuation of dynamic response in a pile-soil foundation becomes more obvious.

14 April 2026 in Scientific Reports
Verified
Journal Article
Open access
PDF file
SLShantong Lu
Shantong Lu
ZLZhiyang Lu
Zhiyang Lu
XSXu Shuo
Xu Shuo
RWRenyuan Wang
Renyuan Wang
Mountain tunnels have the characteristics of long construction period, multiple uncontrollable factors, and high construction difficulty. To investigate collapse risks associated with complex geological conditions, a deep-buried mountain tunnel in Baise, Guangxi, China, was selected as a case study. The risk of tunnel collapse during construction was analyzed using theoretical analysis, numerical simulation, and field monitoring. The research results indicate that: (1) using intuitionistic fuzzy theory and skewed normal weighing function can better evaluate the risk of mountain tunnel collapse. The analysis shows that the consequence level of Baise Tunnel is III (severe); (2) The construction of three-bench method with temporary cross braces, combined with long anchor rod support and deep grouting, can effectively control the deformation of surrounding rock; (3) Based on the risk assessment and numerical simulation results, several on-site construction measures were proposed to mitigate the risk of mountain tunnel collapse. These include segmented excavation at tunnel entrances, increased monitoring frequency, and timely closure of the surrounding rock. The research results can effectively improve the safety of tunnel construction, save energy and costs, and promote the transformation of engineering construction towards green and low-carbon.