The contributions of sustainability to architectural designs are steadily increasing in parallel with developments in technology. Although sustainability seems to be a new concept in today’s architecture, in reality, it is not. This is because, much of sustainable architectural design principles depend on references to vernacular architecture, and there are many examples found in different parts of the world to which architects can refer. When the world seeks for more sustainable buildings, it is acceptable to revisit the past in order to understand sustainable features of vernacular architecture. It is clear that vernacular architecture has a knowledge that matters to be studied and classified from a sustainability point of view. This work aims to demonstrate that vernacular architecture can contribute to improving sustainability in construction. In this sense, the paper evaluates specific vernacular housing in Eastern Black Sea Region in Turkey and their response to nature and ecology. In order to explain this response, field work was carried out and the vernacular architectural accumulation of the region was examined on site. The features of the examples have been identified and debated in today’s sustainable architectural concept. This work holistically evaluates this architectural manifestation, in the light of current knowledge, in order to find scientific justification for its knowledge to verify and promote its application in the future.
12 September 2022 in Engineering, Construction and Architectural Management
Purpose: There are significantly fewer women than men in managerial positions, mainly project management. This problem is noticeable in the construction and engineering sectors, traditionally male-dominated industries with leadership much dependent on masculine qualities. This study examines the obstacles to the career progression of professional female project managers (PFPMs) in the Ghanaian construction industry.Design/methodology/approach: Twenty potential obstacles to women's career progression in the construction industry were identified from a comprehensive review of the literature. A questionnaire was prepared and administered among eighty project managers who work in large construction firms in Ghana. Data obtained were analysed using one sample t-test, Kendall's concordance test, Chi-square test and exploratory factor analysis.Findings: The findings suggest the significance of all the twenty factors as potential obstacles to the career progression of PFPMs. The exploratory factor analysis identified five underlying grouped obstacles: “leadership and human capital related issues”, “issues related to discrimination of all forms”, “career aspiration and planning issues”, “female related role conflicts”, and “recruitment and selection issues”.Research limitations/implications: The subjective nature of the views of the respondents could influence the evaluation of the obstacles. With this study only exploring the dimensions underlying the significant obstacles, future studies could examine the interrelationships between the various obstacles and move on to determine their impacts on the career progression of professional female PMs as well.Practical implications: Having an in-depth understanding of these obstacles, stakeholders and other industry practitioners in Ghana could make informed decisions on measures to put in place to address some of these critical issues to raise the standard of professional female PMs in the construction industry. Policymakers and gender advocates in Ghana could also take up some of the critical obstacles identified and provide suitable strategies to educate and create the needed awareness of the industry on those obstacles. Practically, the findings from this study can be valuable for informing decision-making at different management levels in the construction industry.Originality/value: With country-specific (Ghana) obstacles identified, the findings significantly contribute to the literature on the career advancement of females in the construction sector.
It is thought that there is a low level of awareness of key competencies that drive material waste reduction at the construction stage of a project which has led to the low impact of waste minimization in the construction industry. This study, therefore, explores the key competencies for driving waste minimization at the construction stage of projects. Twenty-four (24) key factors that drive CW minimization at the construction stage of projects were derived from a thorough review of existing literature. The research adopted the quantitative approach whereby a questionnaire survey involving 53 construction professionals was conducted. Factor analysis was the statistical tool employed for the analysis of the data gathered. The findings of the study revealed four major competencies that drive CW minimization: Awareness Competency (AC), Managerial Competency (MC), Personnel Ability Competency (PAC), and Communication Competency (CC). The implementation of the key competencies from the findings of the study is highly recommended for the achievement of low waste in building projects. In view of this, it is recommended that government should enact legislative and fiscal measures to instill waste management habits in the construction industry. Several studies have investigated strategies or measures for CW minimization. However, this study focused on the knowledge and skills of construction stakeholders as the main component of waste minimization competencies.
29 April 2021 in Built Environment Project and Asset Management
Purpose: This study examines occupants' satisfaction with the indoor environmental quality (IEQ) of a green-certified building [The Green Star South Africa (SA) Building] in Ghana.Design/methodology/approach: Views of 300 respondents are solicited on 15 IEQ (obtained through a critical review of the literature and complemented with a pilot interview on the subject) parameters. Data obtained are analysed using both descriptive and inferential statistics.Findings: Findings suggest that occupants are generally satisfied with five critical aspects of IEQ. The results also indicate that the occupants perceive five key IEQ parameters to have high levels of importance. Further inferential analysis of the parameters revealed that two core IEQs require the highest levels of improvement actions.Research limitations/implications: The study was conducted in Ghana and analysed occupants' perceptions of working within one green-certified building. Again, the collection of the occupants' responses was not linked with the direct measurement of physical characteristics of the IEQ parameters of the building. Hence, the findings cannot be generalised.Practical implications: Practically, the study contributes to providing all stakeholders involved in the Green Star SA Ghana certification system with the relevant feedback for their decision-making on current and future projects to be certified under this certification system.Originality/value: This study provides valuable information on the performance of IEQ parameters of the building and points out potential IEQ areas that need improvement efforts, especially concerning current and future facilities certified under this certification system.
22 September 2017 in International Journal of Engineering Technologies IJET
Today, construction practices with potential damages to the environment are carried out uncontrollably to respond to rapidly growing population needs. In the construction sector, which is one of the leading sectors closely following technological developments, steps must be taken to protect the world's ecologic balance. The goal of the professionals is not only to put up a building in accordance with its design but also to comply with environmental requirements in a respectful way. Different parameters such as erroneous design decisions, inadequate work schedules, sudden weather oppositions, defects in product supply can affect directly or indirectly the construction process, resulting in the generation of construction waste on the construction site. These wastes negatively affect the living and non-living environment. It is not technically possible to completely eliminate construction wastes generated during the construction process, but it is possible to control and recover these wastes. For this reason, innovative applications are important in the construction sector. This study examines the potential of BIM applications in preventing/reducing wastes in the construction process. For this purpose; articles that talk about the reasons of waste generation in the construction sector and the relationship between BIM technology and construction waste management practices were examined, and the findings obtained were evaluated. BIM applications have been proposed to be developed to prevent/reduce wastes on the construction site.
1 December 2016 in Revista ingeniería de construcción