Yonggang Xiao

Dr. Yonggang Xiao

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
YXYonggang Xiao
Yonggang Xiao
XLXiaomin Liu
Xiaomin Liu
JZJunlong Zhou
Junlong Zhou
LSLiwei Song
Liwei Song
Pretensioned prestressed high strength concrete (PHC) pipe piles are widely used in various engineering foundations, which have the advantages of high single pile bearing capacity, strong adaptability to geological conditions and high degree of construction mechanization. In order to study the vertical compressive bearing performance and settlement characteristics of ultra-long PHC pipe piles, high strain dynamic detections and static load tests were carried out on four PHC piles with a diameter of 0.9 m on site. It can be seen from the field test that the bearing capacity of the prefabricated pipe piles was time-dependent. By the end of the dynamic test, the bearing capacity of each test pile increased by 27% to 66%. The static load test also verified the rationality of the value of the restitution coefficient. Therefore, the final bearing capacity of the pile foundation can be predicted by using the high strain initial driving results and the restitution coefficient, which can reduce the repeated driving process, effectively save the cost and improve the engineering efficiency. Under 2.1 times the design load, the change range of the pile concrete modulus is from 37.5 GPa to 52 GPa, the change range of the pile side friction resistance is from 0 kPa to 97 kPa and the change range of the pile end to pile bottom load ratio is from 0% to 7.54%. During the test, the shaft friction and end bearing of the lower part of the piles were not fully mobilized. The shaft friction resistance, the end resistance and the movement behavior of the pile top and the end of the piles can provide parameter references for the subsequent design and construction of the piles.

1 January 2021 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
YHYongyue Hu
Yongyue Hu
JZJingjie Zhang
Jingjie Zhang
CLChanghong Li
Changhong Li
ZSZhengyang Song
Zhengyang Song
YXYonggang Xiao
Yonggang Xiao
Yu WangYu Wang
Yu Wang
Due to the lack of relevant investigation research on the evolution of mining stress in high stope of metal mines, the understanding of how to ensure the safety during mining process is not clear at all. In this paper, by monitoring the mining‐induced pressure of the surrounding rock in the 16‐2# stope of Lilou Iron Mine, the evolution of the mining‐induced pressure of the subsequent filling and mining method of the high‐stage empty field is obtained. The study shows that there are three stages of pressure change in the second‐step stope of Lilou Iron Mine: I (stress rising stage), II (stable stage), and III (pressure relief stage), and the mining stress in the surrounding rock is transferred from the top to bottom. The stress transfer model of stope is proposed, and the variation of vertical stress versus the depth is fitted; the four horizontal sections are fitted, respectively. By establishing the three‐dimensional numerical model and distributed excavation simulation, the time‐space evolution of mining stress is obtained and compared with the in‐site measuring result. The two results show high consistency, and the effectiveness of numerical simulation is verified.

18 March 2022 in Geofluids
Verified
Journal Article
Open access
PDF file
YXYonggang Xiao
Yonggang Xiao
JCJie Cao
Jie Cao
XLXiaomin Liu
Xiaomin Liu
CLChang-Hong Li
Chang-Hong Li
With the increase in the depth of large-scale open-pit mining, many mines have to face problems such as what is the effect of open-pit blasting on the rock slope and how to ensure the stability of a high-steep slope. The east slope of the Beizhan iron mine in Hejing County, Xinjiang, belongs to the typical open-pit high and steep slope of mined hanging-wall ore. To study the effect of open-pit blasting vibrations on hanging-wall slope stability, the intelligent blasting vibration detector was used to monitor the open-pit blasting wave of the Beizhan iron mine and the corresponding numerical model was established. We fitted the transmission law of slope blasting vibration by Sodev’s regression formula and calculated stress, strain, and vibration velocity of the whole slope by numerical simulation. The result showed that the fitting functional relationship was correct and could be the basic rule of predicting the maximum charge amount per delay interval and minimum safe distance for this area. The estimated open-pit blasting charge weight was reasonable and blasting vibrations would have little effect on the hanging-wall slope. The research method and conclusions in this article have numerous reference values for studying the hanging-wall slope’s kinetic stability.

1 January 2024 in Advances in Civil Engineering
Verified
Journal Article
Open access
YXYonggang Xiao
Yonggang Xiao
XLXiaomin Liu
Xiaomin Liu
XHXiaopei He
Xiaopei He
CZChen Zheng
Chen Zheng
QBQiang–Qiang Bai
Qiang–Qiang Bai
YZYu Zhang
Yu Zhang
With the increasing utilization of urban underground space in densely populated cities, it is crucial to understand the interactive impact of the excavation sequence on the excavation group of foundation pits. The foundation pit of Tianta Station of Tianjin Metro Line 7 was adjacent to a deep foundation pit of an apartment, which provided a good case for the study of simultaneous excavation of foundation pits. In this paper, based on two deep foundation pit excavation projects, a finite element model was established to better understand the mutual influence of simultaneous foundation pit excavation. The responses of the two deep foundation pits under five different excavation sequences were investigated, including the horizontal displacement of the ground‐connected wall and the displacement of the top of the wall, the settlement of the ground surface, and the supporting axial force of the basement floor slab. The position of the maximum horizontal displacement in different modes is the same, and the shape of the deformation curve was fish‐bellied. When both pits B and C were excavated simultaneously, the surface settlement between adjacent pits was smaller than in other working conditions. Mode 5 is optimal among these five modes, in which not only the construction progress is the fastest but also the underground wall deformation and the ground settlement are relatively small. The findings and lessons learned from these two adjacent pits, both of which were constructed using the cap‐and‐reverse method, can help professionals optimize excavation design and construction, as well as performance prediction and control.

16 May 2023 in Buildings
Verified
Journal Article
Open access
PDF file
XLXiaomin Liu
Xiaomin Liu
YXYonggang Xiao
Yonggang Xiao
JZJunlong Zhou
Junlong Zhou
LGLongbo Ge
Longbo Ge
ZSZiwen Song
Ziwen Song
Prestressed high-strength concrete (PHC) pipe pile has the advantages of high single pile bearing capacity, a wide range of applications, good driving resistance, fast construction speed, etc. It has been widely used in high-rise buildings, bridges, ports, and other industries. The application of extra-long PHC pipe piles with a length of more than 50 m is increasing. However, there are few studies on the drivability and hammering criteria of extra-long PHC piles. To analyze the drivability of extra-long piles and predict their bearing capacity, in this paper, high-strain dynamic tests were carried out on 14 test sections with the pile foundation of Temburong Bridge in Brunei as the research background. The hammer stop control criteria calculated according to the Hiley formula would lead to excessive hammering. Three types of damage occurred during construction: pile shaft breakage, weld tearing, and pile head breakage. The weight and drop height of the piling hammer selected for this project were appropriate, and the extra-long test piles can be hammered to the design depth. The values of Cp (Compression of the pile) and n (the efficiency of the blow) were fitted based on the dynamic test data, which provided a more accurate reference for the selection of subsequent piling parameters of the project. It provides a more accurate calculation method for predicting the bearing capacity of extra-long PHC piles and provides control criteria for pile stopping and a scientific basis for their design and construction.

1 January 2021 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
YXYonggang Xiao
Yonggang Xiao
JZJubing Zhang
Jubing Zhang
JCJie Cao
Jie Cao
CLChanghong Li
Changhong Li
The prefabricated urban utility tunnels (UUTs) have many advantages such as short construction period, low cost, high quality, and small land occupation. However, there is still a lack of in‐depth analysis of the mechanical performance of the prefabricated urban utility tunnel (UUT) structure with bolted connections under different working conditions. In this paper, the force performance of a prefabricated UUT in Tongzhou District, Beijing, was studied under different working conditions using two methods: field monitoring and numerical simulation. The multichannel strain monitor was used for monitoring, and the internal wall concrete and bolt strain change data under the two conditions of installation and backfill were obtained. Combined with the construction process of the UUTs, a three‐dimensional numerical model was established by COMSOL, where the build‐in bolt assembly was used to simulate the longitudinal connection of the tunnel. The simulation results were compared with the measured data to verify the rationality of the computational model. The simulation results showed that the concrete and bolts on the inner wall of the tunnel work well under the two conditions of installation and backfilling; The deformation of the top plate of the prefabricated tunnel was approximately parabolic, with the largest vertical displacement (0.37 mm) in the middle and the most sensitive to the vertical load in the central part of the roof. The central portion of the side wall had the largest displacement (0.17 mm) in the inner concave. The tensile stress of bolt 3 increased the most (30.75 MPa) but was still much smaller than the yield strength of the bolt. The concrete and bolts of the UUT were found to work well through force analysis under operating conditions. In conclusion, analysis of structural forces and deformation failure modes will help design engineers understand the basic mechanisms and select the appropriate UUT structure.