Purpose: Facilities Management (FM) is a dynamic profession, which supports core business functions by creating cost-effective and risk-free built environment aligned with the strategic business directives throughout the building life cycle. This study aims to investigate and position the Facilities Manager’s role during building life cycle based on the stages of RIBA Plan of Work 2013. Design/methodology/approach: A literature survey and in-depth interviews with experts were used to investigate the role of a Facilities Manager at the different stages of RIBA Plan of Work 2013. The gathered data were analysed using content analysis technique to explore the role of a Facilities Manager. Findings: Research findings assert that advising the Client on cost-effective building expansion options as a vital role of a Facilities Manager at Strategic Definition stage. Further, briefing the Client’s requirement is a foremost undertaking of a Facilities Manager at Preparation and Brief stage. During the Concept Design and Developed Design stages, Facilities Manager plays a key role in value engineering exercises to ensure value for client?s money and also prepares operations and maintenance strategies to be used at the In Use stage. Moreover, Facilities Manager must have a technical training on buildings, services and systems at Handover stage to manage them at the In Use stages. Originality/value: The role of a Facilities Manager identified in this study can be used as a guide by the Clients and project teams in obtaining their services during the building life cycle to enhance building performance.
16 November 2017 in Built Environment Project and Asset Management
Purpose: Increasing demand for the best value for client’s money necessitates waste reduction while enhancing the project functionality in construction industry. The purpose of this paper is to propose Lean integrated Value Engineering (LiVE) approach by establishing the synergy between Lean and Value Engineering (VE) concepts for construction industry. Design/methodology/approach: A literature survey and in-depth un-structured interviews with six subject matter experts in three steps were used to investigate the synergy between Lean principles and VE job plan to develop LiVE approach for the construction industry. The gathered data were analysed using code-based content analysis and the LiVE approach was finally validated using interviews by two additional subject matter experts representing industry and academia. Findings: Research findings established that there is a synergy between Lean principles and VE job plan. Accordingly, the study developed a LiVE approach, which specify client’s value, identify the value stream, make value flow without interruption, let the client pull functional requirements and pursue perfection during “value establishment”, “value analysis of functional requirements”, “value creativity”, “value evaluation”, “value development”, “value verification” and “value achievement” phases. Originality/value: The novel LiVE approach will guide construction industry practitioners on how to integrate Lean concept with VE in order to reduce unnecessary costs and wastes, to enhance project functionality and ultimately to achieve value for client’s money.
30 March 2021 in Built Environment Project and Asset Management
Purpose: This paper investigates the lean enabling human capacities and develops a framework integrating individual, organisational and environmental level strategies to build human capacities for successful lean implementation of small and medium contractors (SMCs) in Sri Lanka.Design/methodology/approach: An interpretivism stance is adopted, and a qualitative research approach is used. The data collection technique adopted is semi-structured interviews. In total, 24 experts with experience in lean implementation of SMCs were interviewed, and data were analysed through code based content analysis using NVivo10.Findings: Team working skills, critical thinking, leadership, communication skills, work ethics, knowledge and positive attitudes were identified as lean enabling human capacities for SMCs. The framework developed in this study provides individual, organisational and environmental level strategies that can be used to build human capacities necessary for enabling lean in construction SMCs.Practical implications: The study will be beneficial to construction SMCs, academics, researchers and government institutions in developing countries, which share socio-economic, demographic or cultural traits similar to Sri Lanka.Originality/value: A novel lean enabling human capacity building framework is developed with the strategies required for building those capacities in order to accelerate the lean implementation in construction SMCs. This contributes to the body of knowledge as it uncovers individual, organisational and environmental level strategies for enabling lean through human capacity building in Sri Lankan SMCs.
16 July 2008 in The International Journal of Advanced Manufacturing Technology
Purpose: Knowledge-based economies are popular in the present world. Simultaneously, universities are becoming more responsible for leading economic development through research. As a key contributor to the national economy, it is vital for the construction industry to move beyond outdated practices, and hence, reviewing the role of academic research in empowering the construction industry with knowledge is essential. The purpose of this paper is to focus on how relevant theories conceptualise the expected role of academic research in the innovative development of an industry and the specific location in the Sri Lankan construction industry. Design/methodology/approach: Following a comprehensive literature review, empirical data were collected from the Sri Lankan context with a mixed approach informed by a pragmatist philosophical stance. The perspective of academia and industry practitioners were deductively obtained through surveys and inductively explored through qualitative interviews. Findings: This study provides evidence that academic research in Sri Lanka does not contribute effectively to innovative construction management. Due to the absence of industry-focussed knowledge dissemination strategies, the academic–industry relationships are mostly non-research based. The industry lacks in research-informed-decision making, leading to lesser innovations. Research limitations/implications: The research conclusions are more applicable to the developing country construction industry contexts. Practical implications: The research urges the need for improved academic–industry research collaborations and strategic knowledge dissemination movements. Originality/value: The research confirms that academic research is a major integral part of the developing construction industry in a knowledge-based economy. In establishing the expected role of academic research, the research revealed the current practice to be under-located. Hence, the research prescribes the necessary actions; research collaborations in major and subsequent requirements.
13 July 2017 in Built Environment Project and Asset Management
The purpose of this paper is to develop a collaborative facilities management (CFM) model incorporating facilities management (FM) functions that can be shared and performed collaboratively by two or more organisations to enhance the performance of FM functions of collaborating organisations. A critical literature review followed by a preliminary investigation was used to identify main categories of FM functions that can be performed collaboratively and dimensions that affect FM collaboration. Subsequently, a detailed list of FM functions that can be performed collaboratively under eight different contexts based on three dimensions identified through observations, document reviews and in-depth interviews with experts who have experience in each context. The paper introduces a novel concept of CFM to share utility/infrastructure facilities, facility services and information by two or more organisations to maintain, improve, adapt and ensure functionality of the built environments of the collaborating organisations. The study identified core business, geographical location and ownership as the key dimensions that affect CFM concept. The outcome of the study, which is CFM model, proposes FM functions that can be performed collaboratively and benefits of collaborating utilities/infrastructure facilities, facility services and information under the aforementioned key dimensions to create a win-win situation for the organisations. The paper highlights the FM functions that can be performed collaboratively in order to provide favourable solutions for operational issues faced by facilities managers, while optimising the FM performance of the organisations. The CFM model offers original insights to the FM functions that can be shared and performed collaboratively by organisations under different contexts to optimise the FM performance.