Doina Negrea

Dr. Doina Negrea


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 April 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
DNDoina Negrea
Doina Negrea
CCChristiana Cazacu
Christiana Cazacu
MCMircea Conţiu
Mircea Conţiu
The objective of the project was the rehabilitation and expansion of one bridge, located on the DN28 (a national road) in Sarca, Iasi County. The solution includes an atypical use of the flexible galvanized steel structure. The main challenge in this case was to finish the works without any traffic interruption on this section of the national road, as well as the assembly of the said corrugated steel structure under the existing bridge. The work was executed in record time and with reduced costs in comparison with the classic alternative solutions, such as concrete bridges. The paper highlights practical aspects from the key moments of the project and presents the major challenges and how they were solved for both the design and the construction stages.