Human interference with the Earth’s climate cannot be ignored any longer. Renewable energy sources need utmost attention in all energy sectors. For buildings, geothermal energy for heating, cooling, and domestic hot water is a sustainable solution. Horizontal ground heat exchangers (HGHE) demonstrate promising results with low installation costs. Research is focused on increasing their thermal performances by structural improvements and ground thermal proprieties improvements, with little research on using auxiliary heat to increase their performances. A numerical model for an HGHE was established to investigate the effects of auxiliary heat sources on the performances of the HGHE. The results demonstrate that heat transfer into the HGHE increases the overall ground temperature at the end of the heating season by 138.50% compared with no heat transfer from auxiliary heat sources. The ground freezing period decreased by approximately 24.74% by having a heated basement, approximately 40.20% by transferring heat with solar thermal panels, and approximately 62.88% by using both auxiliary heat sources. The difference between the undisturbed ground temperature and the ground temperature with no auxiliary heat sources at the end of the season was 3.45 °C. The difference between the undisturbed ground temperature and the ground temperature with all auxiliary heat sources resulted in 0.92 °C.
High-rise building facades offer an alternative site for installing photovoltaic panels, which are traditionally placed on rooftops. The unique spatial configuration of high-rise buildings, characterized by a small footprint area relative to their height, supports the application of vertical facades for this purpose. Photovoltaic panels installed in these areas not only generate electricity but also enhance the aesthetic dimension of the urban landscape. The proposed methodology uses the EnergyPlus software to simulate the electricity generation of photovoltaic panels mounted on the walls of high-rise buildings in the city of Kragujevac, Serbia. A technical, economic, and environmental analysis was conducted for two scenarios: (1) photovoltaic panels installed on two facade areas with the highest solar potential, and (2) photovoltaic panels installed on all four available facade areas. In Scenario 1, the annual reduction in electricity consumption, annual cost savings in electricity consumption, and investment payback period range from 13 to 38%, 11 to 31%, and 8.4 to 10.6 years, respectively. In Scenario 2, these values range from 23 to 58%, 18 to 47%, and 10.9 to 12.9 years, respectively. The results indicate that southeast and southwest facades consistently achieve higher levels of electricity generation, underscoring the importance of prioritizing high-performing orientations rather than maximizing overall surface coverage. The methodology is particularly efficient for analyzing the solar potential of numerous buildings with comparable shapes, which is a characteristic commonly found in Eastern European architecture from the late 20th century. The study demonstrates the applicability of the proposed methodology as a practical and adaptable tool for assessing early-stage solar potential and providing decision support in urban energy planning. The approach addresses the identified methodological gap by offering a low-cost, flexible framework for assessing solar potential across diverse urban contexts and building typologies, while significantly simplifying the modeling process.
The objective of the project was the rehabilitation and expansion of one bridge, located on the DN28 (a national road) in Sarca, Iasi County. The solution includes an atypical use of the flexible galvanized steel structure. The main challenge in this case was to finish the works without any traffic interruption on this section of the national road, as well as the assembly of the said corrugated steel structure under the existing bridge. The work was executed in record time and with reduced costs in comparison with the classic alternative solutions, such as concrete bridges. The paper highlights practical aspects from the key moments of the project and presents the major challenges and how they were solved for both the design and the construction stages.