Jasmina Ćetković

Dr. Jasmina Ćetković


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
SLSlobodan Lakić
Slobodan Lakić
JĆJasmina Ćetković
Jasmina Ćetković
BPBojan Pejovic
Bojan Pejovic
SRSrdjan Redzepagic
Srdjan Redzepagic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
Balancing of different dimensions of development—economic, environmental, social, is an imperative of policies and strategies of sustainable growth, which are practiced today in the EU and globally. The main aim of our paper is to investigate the relationship between renewable (REC) and non-renewable energy consumption (NREC), greenhouse gas (GHG) emissions and share of ICT in total exports, on one hand, and GDP p.c. on the other. We created a model for EU countries divided in two groups—old and new EU members, by using PMG and ARDL models. Considering the size and structure of the sample of countries, the selected variables in the model and the relevant period (2000–2020), to a certain extent, we filled the research gap in the existing literature. Our results indicate that a 1% increase in the share of REC and ICT in total exports leads to GDP p.c. growth in the long run by 0.151% and 0.168% in old EU countries, i.e., 0.067% and 0.039% in new EU countries, respectively. Contrary, an increase of NREC by 1% has a significant and negative impact on GDP p.c. in the long run, in both groups, leading to a decrease of economic growth by 0.512% in the old and 1.306% in the new EU group. We find a 1% increase of GHG emissions was accompanied by an increase of GDP p.c. in new EU countries by 0.939%, while that impact is insignificant in old EU countries in the long run. We conclude our paper with final remarks and policy implications.

5 January 2022 in Water
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
MKMiloš Knežević
Miloš Knežević
SLSlobodan Lakić
Slobodan Lakić
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
JCJelena Cvijović
Jelena Cvijović
Improved Cost-Benefit Analysis (CBA) analysis requires a broader analytical framework, in order to perceive each project individually from the perspective of potentially measurable and significant effects on the environment and society as a whole. The main goal of our paper is to assess the financial and economic justification for variant V3 (as the most technically optimal) of the wastewater treatment plant (WWTP) construction project in Nov Dojran, North Macedonia, with the purpose of advancing municipal infrastructure and environmental benefits from improved water treatment. Based on the economic analysis conducted, we conclude that the investment in the WWTP project is justified, because the economic internal rate of return is higher than the opportunity cost of capital (EIRR = 16.38%), the economic net present value is higher than 0, and EBCR (benefit-cost ratio) is greater than 1 (EBCR = 2.11). The highest environmental benefit of 49.2% in total environmental benefits is associated with nitrogen, while phosphorus is the next pollutant in the structure of environmental benefits at 46.1%. The environmental benefits of removing biological oxygen demand (BOD) and chemical oxygen demand (COD) are significantly less important, despite the removal of significant amounts of these pollutants during treatment. The situation is similar with suspended particles.

23 April 2023 in Water
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
MKMiloš Knežević
Miloš Knežević
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
ETEsad Tombarević
Esad Tombarević
MGMarija Grujić
Marija Grujić
Wastewater treatment is a process that reduces pollution to those quantities and concentrations at which purified wastewater is no longer a threat to human and animal health and safety and does not cause unwanted changes in the environment. Municipal wastewater is classified as biodegradable water. Special importance should be given to wastewater with a high content of organic matter (COD), phosphorus (P) and nitrogen (N). MBBR technology, developed on the basis of the conventional activated sludge process and the bio filter process, does not take up much space and does not have problems with activated sludge, as in the case of conventional biological reactors, and has shown good results for the removal of organic matter, phosphorus and nitrogen. The aim of this paper is to optimize the wastewater treatment process in the municipality of Dojran, North Macedonia. Three alternative solutions for improving the capacity for wastewater treatment in the municipality of Dojran were analyzed. The shortlist of variants was made on the basis of several criteria, including: analysis of the system in the tourist season and beyond, assessment of the condition and efficiency of the existing wastewater treatment plant (WWTP) in combination with a new treatment plant, treatment efficiency when using different wastewater treatment technologies, the size of the site needed to accommodate the capacity, as well as the financial parameters for the proposed system. The selection of the most favorable solution for the improvement of the wastewater treatment system was made using the AHP (analytic hierarchy process) method. In order to select the optimal solution, a detailed analysis was conducted, considering several decision-making criteria, namely the initial investment, operating costs and management complexity. Based on the obtained results, Variant 3 was recommended, that is, the construction of a completely new station with MBBR technology, with a capacity for 6000 equivalent inhabitants.

5 February 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
SLSlobodan Lakić
Slobodan Lakić
AŽAngelina Živković
Angelina Živković
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
The European Union, as a signatory to the Paris Agreement, has approached the action against greenhouse gas (GHG) emissions and climate change quite ambitiously, striving to achieve climate neutrality by 2050. Extension of the European Green Deal policy implementation to the Western Balkans can only increase the chances of the climate neutral agenda. Expectations from Montenegro in the coming period are transposable to other Western Balkans countries as they are urged to start implementing the Paris Agreement by establishing appropriate policies and measures. In this regard, this paper presents the analysis of the financial and economic analysis results of measures to reduce GHG emissions in Montenegro. With this respect, least cost analysis—cost effectiveness analysis and cost–benefit analysis were conducted. The analysis results indicated that due to the thermal power plant reconstruction, increased use of renewable energy sources and measures to increase energy efficiency, the largest reduction in GHG emissions in Montenegro in the next 10 years is expected in the energy sector.

17 April 2022 in Processes
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
SLSlobodan Lakić
Slobodan Lakić
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
MKMiloš Knežević
Miloš Knežević
JCJelena Cvijović
Jelena Cvijović
Montenegro faces serious challenges in terms of waste tire management. The main goal of our paper is to consider the financial and economic justification of the implementation of the first phase of the project of collection, takeover and transport, sorting, and storage of waste tires from the three municipalities in Montenegro. The financial feasibility analysis pointed out the need to organize the second phase of the project and the production of commercially usable and energy efficient products. That phase would lead to the desired commercial effects and will probably ensure the financial sustainability of the project. The economic feasibility analysis of the project included an assessment of the socio-economic benefits from the emission reduction of the first group of pollutants (PM, SOX, NOX, VOC, CO) as a consequence of the waste tires’ destruction, predominantly by combusting them. Unit values of pollution costs by types of gases, adjusted for Montenegro, were defined in the interval from 192 EUR/t for CO to 24,294 EUR/t for PM. We proved that the direct socio-economic benefits of this project are savings in the cost of environmental pollution. The total present value of discounted costs in the observed time period was calculated at the level of EUR 1,620,080, while the total present value of the positive socio-economic effects was estimated at EUR 1,991,180. Dynamic justification indicators suggest that this investment has a satisfactory socio-economic justification, i.e., the economic rate of return is higher than the opportunity cost of capital (ERR = 15.82%), the economic net present value is greater than 0 (ENPV = 371,100 EUR), and the benefit–cost ratio is greater than 1 (B/C ratio = 1.23).