Milos Zarkovic

Mr. Milos Zarkovic

University of Montenegro, Faculty of Economics Podgorica
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
SLSlobodan Lakić
Slobodan Lakić
JĆJasmina Ćetković
Jasmina Ćetković
BPBojan Pejovic
Bojan Pejovic
SRSrdjan Redzepagic
Srdjan Redzepagic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
Balancing of different dimensions of development—economic, environmental, social, is an imperative of policies and strategies of sustainable growth, which are practiced today in the EU and globally. The main aim of our paper is to investigate the relationship between renewable (REC) and non-renewable energy consumption (NREC), greenhouse gas (GHG) emissions and share of ICT in total exports, on one hand, and GDP p.c. on the other. We created a model for EU countries divided in two groups—old and new EU members, by using PMG and ARDL models. Considering the size and structure of the sample of countries, the selected variables in the model and the relevant period (2000–2020), to a certain extent, we filled the research gap in the existing literature. Our results indicate that a 1% increase in the share of REC and ICT in total exports leads to GDP p.c. growth in the long run by 0.151% and 0.168% in old EU countries, i.e., 0.067% and 0.039% in new EU countries, respectively. Contrary, an increase of NREC by 1% has a significant and negative impact on GDP p.c. in the long run, in both groups, leading to a decrease of economic growth by 0.512% in the old and 1.306% in the new EU group. We find a 1% increase of GHG emissions was accompanied by an increase of GDP p.c. in new EU countries by 0.939%, while that impact is insignificant in old EU countries in the long run. We conclude our paper with final remarks and policy implications.

29 January 2018 in Complexity
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
SLSlobodan Lakić
Slobodan Lakić
MLMarijana Lazarevska
Marijana Lazarevska
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
SVSaša Vujošević
Saša Vujošević
MGMladen Gogić
Mladen Gogić
Using an artificial neural network, it is possible with the precision of the input data to show the dependence of the property price from variable inputs. It is meant to make a forecast that can be used for different purposes (accounting, sales, etc.), but also for the feasibility of building objects, as the sales price forecast is calculated. The aim of the research was to construct a prognostic model of the real estate market value in the EU countries depending on the impact of macroeconomic indicators. The available input data demonstrates that macroeconomic variables influence determination of real estate prices. The authors sought to obtain correct output data which show prices forecast in the real estate markets of the observed countries.

5 January 2022 in Water
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
MKMiloš Knežević
Miloš Knežević
SLSlobodan Lakić
Slobodan Lakić
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
JCJelena Cvijović
Jelena Cvijović
Improved Cost-Benefit Analysis (CBA) analysis requires a broader analytical framework, in order to perceive each project individually from the perspective of potentially measurable and significant effects on the environment and society as a whole. The main goal of our paper is to assess the financial and economic justification for variant V3 (as the most technically optimal) of the wastewater treatment plant (WWTP) construction project in Nov Dojran, North Macedonia, with the purpose of advancing municipal infrastructure and environmental benefits from improved water treatment. Based on the economic analysis conducted, we conclude that the investment in the WWTP project is justified, because the economic internal rate of return is higher than the opportunity cost of capital (EIRR = 16.38%), the economic net present value is higher than 0, and EBCR (benefit-cost ratio) is greater than 1 (EBCR = 2.11). The highest environmental benefit of 49.2% in total environmental benefits is associated with nitrogen, while phosphorus is the next pollutant in the structure of environmental benefits at 46.1%. The environmental benefits of removing biological oxygen demand (BOD) and chemical oxygen demand (COD) are significantly less important, despite the removal of significant amounts of these pollutants during treatment. The situation is similar with suspended particles.

5 February 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
SLSlobodan Lakić
Slobodan Lakić
AŽAngelina Živković
Angelina Živković
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
The European Union, as a signatory to the Paris Agreement, has approached the action against greenhouse gas (GHG) emissions and climate change quite ambitiously, striving to achieve climate neutrality by 2050. Extension of the European Green Deal policy implementation to the Western Balkans can only increase the chances of the climate neutral agenda. Expectations from Montenegro in the coming period are transposable to other Western Balkans countries as they are urged to start implementing the Paris Agreement by establishing appropriate policies and measures. In this regard, this paper presents the analysis of the financial and economic analysis results of measures to reduce GHG emissions in Montenegro. With this respect, least cost analysis—cost effectiveness analysis and cost–benefit analysis were conducted. The analysis results indicated that due to the thermal power plant reconstruction, increased use of renewable energy sources and measures to increase energy efficiency, the largest reduction in GHG emissions in Montenegro in the next 10 years is expected in the energy sector.

17 April 2022 in Processes
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
SLSlobodan Lakić
Slobodan Lakić
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
MKMiloš Knežević
Miloš Knežević
JCJelena Cvijović
Jelena Cvijović
Montenegro faces serious challenges in terms of waste tire management. The main goal of our paper is to consider the financial and economic justification of the implementation of the first phase of the project of collection, takeover and transport, sorting, and storage of waste tires from the three municipalities in Montenegro. The financial feasibility analysis pointed out the need to organize the second phase of the project and the production of commercially usable and energy efficient products. That phase would lead to the desired commercial effects and will probably ensure the financial sustainability of the project. The economic feasibility analysis of the project included an assessment of the socio-economic benefits from the emission reduction of the first group of pollutants (PM, SOX, NOX, VOC, CO) as a consequence of the waste tires’ destruction, predominantly by combusting them. Unit values of pollution costs by types of gases, adjusted for Montenegro, were defined in the interval from 192 EUR/t for CO to 24,294 EUR/t for PM. We proved that the direct socio-economic benefits of this project are savings in the cost of environmental pollution. The total present value of discounted costs in the observed time period was calculated at the level of EUR 1,620,080, while the total present value of the positive socio-economic effects was estimated at EUR 1,991,180. Dynamic justification indicators suggest that this investment has a satisfactory socio-economic justification, i.e., the economic rate of return is higher than the opportunity cost of capital (ERR = 15.82%), the economic net present value is greater than 0 (ENPV = 371,100 EUR), and the benefit–cost ratio is greater than 1 (B/C ratio = 1.23).

17 November 2022 in Animals
Verified
Journal Article
Open access
PDF file
JĆJasmina Ćetković
Jasmina Ćetković
Milos ZarkovicMilos Zarkovic
Milos Zarkovic
MKMiloš Knežević
Miloš Knežević
MCMeri Cvetkovska
Meri Cvetkovska
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
BABojan Adžić
Bojan Adžić
The modern world faces serious challenges associated with the presence of stray dogs on the streets, especially in urban areas. Vardar Planning Region in North Macedonia, which consists of nine municipalities, experiences such challenges. According to current reports, the number of stray dogs on the streets of cities in this region has increased, which has resulted in an increase in the number of dog attacks on residents. As the existing capacities are small in the registered shelters, we considered the possibility of building a new shelter for stray dogs to meet the needs of this region. The goal of our paper is the evaluation of the financial and socio-economic justifications for the construction of a shelter for stray dogs in the Vardar Planning Region (VPR). The results of the financial justification analysis show that the project does not provide satisfactory financial results. Namely, the Financial Net Present Value (FNPV) is negative, with a value of EUR 75,291. The Financial Internal Rate of Return (FIRR) is 0.57%, lower than the discount rate, which is not acceptable for a private investor. The Financial Benefit–Cost Ratio (FB/CR) of this project is 0.925, suggesting that the total discounted costs are greater than the total discounted revenues. On the other hand, the expected socio-economic benefits from this project are multifaceted, including savings in stray dog bite costs, savings in the cost of traffic accidents caused by stray dogs, and savings in the treatment of diseases caused by stray dogs. The results of the economic analysis show that this investment has full socio-economic justification and that it should be implemented. The Economic Net Present Value (ENPV) is positive and amounts to EUR 789,916. The Economic Internal Rate of Return (EIRR) is 25.94% and the Economic Benefit–Cost Ratio (EB/CR) amounts to 1.90, i.e., greater than 1. The results of the sensitivity analysis also confirm the justification for the realization of this project.