Fernando Amoroso

Mr. Fernando Amoroso


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 January 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Jaqueline LitardoJaqueline Litardo
Jaqueline Litardo
Massimo PalmeMassimo Palme
Massimo Palme
Ruben HidalgoRuben Hidalgo
Ruben Hidalgo
FAFernando Amoroso
Fernando Amoroso
Guillermo SorianoGuillermo Soriano
Guillermo Soriano
This paper compares the potential for building energy saving of various passive and active strategies and on-site power generation through a grid-connected solar photovoltaic system (SPVS). The case study is a student welfare unit from a university campus located in the tropical climate (Aw) of Guayaquil, Ecuador. The proposed approach aims to identify the most effective energy saving strategy for building retrofit in this climate. For this purpose, we modeled the base line of the building and proposed energy saving scenarios that were evaluated independently. All building simulations were done in OpenStudio-EnergyPlus, while the on-site power generation was carried out using the Homer PRO software. Results indicated that the incorporation of daylighting controls accounted for the highest energy savings of around 20% and 14% in total building energy consumption, and cooling loads, respectively. Also, this strategy provided a reduction of about 35% and 43% in total building energy consumption, and cooling loads, respectively, when combined with triple low-e coating glazing and active measures. On the other hand, the total annual electric energy delivered by the SPVS (output power converter) was 66,590 kWh, from where 48,497 kWh was supplied to the building while the remaining electricity was injected into the grid.

28 February 2022 in Energies
Verified
Journal Article
Open access
PDF file
Ruben HidalgoRuben Hidalgo
Ruben Hidalgo
FAFernando Amoroso
Fernando Amoroso
Javier UrquizoJavier Urquizo
Javier Urquizo
VVViviana Vanessa Villavicencio
Viviana Vanessa Villavicencio
MIGUEL ALBERTO RODRIGUEZMIGUEL ALBERTO RODRIGUEZ
MIGUEL ALBERTO RODRIGUEZ
Guillermo SorianoGuillermo Soriano
Guillermo Soriano
This paper shows the technical–economic, operational and environmental feasibility of four off-grid hybrid power systems to supply energy to the Cerrito de los Morreños community in Ecuador. These configurations consist of combinations of diesel generators, solar photovoltaic systems, and battery energy storage systems. Each configuration was simulated and the results were analyzed for two different load conditions: (1) the existing load profile and (2) a reduced load profile by incorporating an energy efficiency initiative. Homer Pro software was used to perform the simulations. The planning horizon for the simulations was selected to be 15 years. The results showed the diesel/photovoltaic/battery configuration with energy efficiency showed the best performance, which was achieved with a photovoltaic system of 160 kWp, the existing generator of 165 kW and a storage system of 283 kWh. The stand-alone diesel generator and photovoltaic/diesel configurations showed higher Net Present Costs, instability problems and higher CO2 emissions. Additionally, the configurations without energy efficiency had increases of between 15% and 40% higher costs compared to their respective energy-efficient scenarios. The information in this work could be useful for some organizations in Ecuador who are interested in investing in rural electrification projects with renewable energy to reduce and/or compensate their CO2 emissions.

20 March 2021 in Energies
Verified
Journal Article
Open access
PDF file
Ruben HidalgoRuben Hidalgo
Ruben Hidalgo
FAFernando Amoroso
Fernando Amoroso
Jaqueline LitardoJaqueline Litardo
Jaqueline Litardo
Javier UrquizoJavier Urquizo
Javier Urquizo
MIGUEL ALBERTO RODRIGUEZMIGUEL ALBERTO RODRIGUEZ
MIGUEL ALBERTO RODRIGUEZ
Guillermo SorianoGuillermo Soriano
Guillermo Soriano
This paper presents a technical, economic, and environmental analysis and optimization of the impact of the reduction of diesel fuel subsidy in the design of an off-grid hybrid power system (OHPS). The OHPS includes a diesel generator, battery energy storage system (BESS), and a solar power system (SPS). This impact will focus on the electricity production levels of each of the OHPS components according to the increase of the fuel price and the SPS size. The Bellavista community in Ecuador was selected as the case study for this work. In this South American country, the government has begun a gradual increase in the diesel fuel price until it reaches international prices. Fifteen scenarios of OHPSs were simulated, in Homer Pro software, considering three SPS sizes and varying the diesel fuel price in five values. The annual load profile for the simulations was built based on the information of a previous study in this community. The results showed that for lower fuel prices (USD$0.26/L and USD$0.35/L), the OHPSs worked mostly with their diesel generators with reduced use of their BESSs. However, there was a higher penetration of the power delivered from the SPSs and BESSs, with higher fuel prices (USD$0.44/L, USD$0.53/L, and USD$0.62/L). These OHPSs considerably reduced their CO2 emissions compared with the standalone diesel generator scenario.

18 February 2023 in Energies
Verified
Journal Article
Open access
PDF file
FAFernando Amoroso
Fernando Amoroso
Ruben HidalgoRuben Hidalgo
Ruben Hidalgo
KMKevin Leopoldo Muñoz
Kevin Leopoldo Muñoz
Javier UrquizoJavier Urquizo
Javier Urquizo
PSPritpal Singh
Pritpal Singh
Guillermo SorianoGuillermo Soriano
Guillermo Soriano
This paper shows the technical–economic assessment of two power systems based on renewable electricity to cover the energy consumption requirements of a drinking water treatment plant in the town of Pile, Ecuador, with a planning horizon of 15 years. A stand-alone and a grid-connected solar PV system were proposed to power this plant, which was designed considering the maximum daily potable water supply condition. This plant operated under two scenarios: (1) 12 h during daylight hours and (2) 24 h. Both schedules were proposed to assess the impact of PV power systems on plant operation. We modeled and optimized a total of four scenarios, where each scenario consisted of one of the proposed PV power systems and the plant with one of its operating schedules. Homer Pro software was used to size and find an optimal solution in each scenario, considering the net present cost (NPC) as the main criterion for optimization. The results showed that the change in the plant operation schedule significantly influenced the parameters of each scenario, such as component sizing, electricity production, initial capital, NPC, and electricity purchase/sale capacity from the plant as a grid power service user to the electric utility company.