Hernani Mota de Lima

Dr. Hernani Mota de Lima

orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2018 in Journal of Cleaner Production
Verified
Journal Article
Closed access
VTV.F. Navarro Torres
V.F. Navarro Torres
LSLeandro G.C. Silveira
Leandro G.C. Silveira
PLPaulo F.T. Lopes
Paulo F.T. Lopes
HLHernani Mota de Lima
Hernani Mota de Lima

1 May 2016 in Journal of Environmental Management
Verified
Journal Article
Closed access
EREdmo C Rodovalho
Edmo C Rodovalho
HLHernani Mota de Lima
Hernani Mota de Lima
GTGiorgio De Tomi
Giorgio De Tomi

1 December 2006 in Rem: Revista Escola de Minas
Verified
Journal Article
Open access
PDF file
HLHernani Mota de Lima
Hernani Mota de Lima
JFJosé Cruz Do Carmo Flores
José Cruz Do Carmo Flores
FCFlávio Luiz Costa
Flávio Luiz Costa
O presente artigo relata os resultados de uma análise de 20 Planos de Recuperação de Áreas Degradadas (PRADs) elaborados para minas localizadas no Quadrilátero Ferrífero (MG), de acordo com o Decreto nº 97.632, de 10 de abril de 1989. Usualmente, PRAD tem sido compreendido como plano de fechamento de mina. Portanto o objetivo desse estudo foi verificar o conteúdo e o cumprimento desses PRADs à Norma NBR 13030 - "Elaboração e apresentação de projeto de reabilitação de áreas degradadas pela mineração", bem como comparar tais conteúdos com o conteúdo típico de um Plano de Fechamento de Mina, estabelecendo similaridades e diferenças entre os instrumentos objetos do estudo. Esse trabalho sintetiza os resultados dessa análise comparativa e evidencia os riscos (ambientais, sócio-econômicos e culturais) de se considerar um PRAD como um Plano de Fechamento de Mina; ressalta a necessidade de discernir PRAD de Plano de fechamento e chama a atenção para a sobreposição de requerimentos às empresas de mineração.

1 June 2008 in Rem: Revista Escola de Minas
Verified
Journal Article
Open access
PDF file
FNFlávia Andrade Nóbrega
Flávia Andrade Nóbrega
HLHernani Mota de Lima
Hernani Mota de Lima
ALAdilson Do Lago Leite
Adilson Do Lago Leite
A Mina Osamu Utsumi das Indústrias Nucleares do Brasil (INB), localizada no município de Caldas/MG, esteve em operação de 1982 a 1995, quando ocorreu a paralisação definitiva da lavra e tratamento de minério de urânio. Desde então, a INB tem, como principal passivo, para fins de fechamento, a drenagem ácida gerada na cava, nas pilhas de estéril e na praia de rejeitos. A drenagem ácida de mina (DAM) na Mina Osamu Utsumi é relevante, tanto do ponto de vista ambiental, quanto pelos custos envolvidos na neutralização desta. Em dezembro de 2004, a INB assinou um termo de referência para elaboração e apresentação do plano de fechamento solicitado conjuntamente pelo IBAMA e CNEN. Diversos estudos têm sido realizados como subsídio à preparação do plano de fechamento. Esse artigo apresenta a aplicação do método da Análise de Múltiplas Variáveis (AMV) no estudo da melhor alternativa para o fechamento do "Bota-Fora" BF-4 da INB, dado seu potencial de geração de DAM.

19 April 2016 in IEEE Communications Magazine
Verified
Journal Article
Closed access
LGLuis G. Uzeda Garcia
Luis G. Uzeda Garcia
EAErika P. L. Almeida
Erika P. L. Almeida
VBViviane S. B. Barbosa
Viviane S. B. Barbosa
GCGeorge Caldwell
George Caldwell
Ignacio RodriguezIgnacio Rodriguez
Ignacio Rodriguez
PMPreben Mogensen
Preben Mogensen
The need for continuous safety improvements and increased operational efficiency is driving the mining industry through a transition toward automated operations. From a communications perspective, this transition introduces a new set of high-bandwidth business-critical and mission- critical applications that need to be met by the wireless network. This article introduces fundamental concepts behind open-pit mining and discusses why this ever-changing environment and strict industrial reliability requirements pose unique challenges to traditional broadband network planning and optimization techniques. On the other hand, unlike unpredictable disaster scenarios, mining is a carefully planned activity. Taking advantage of this predictability element, we propose a framework that integrates mine and radio network planning so that continuous and automated adaptation of the radio network becomes possible. The potential benefits of this framework are evaluated by means of an illustrative example.

1 February 2013 in Revista Brasileira de Ciência do Solo
Verified
Journal Article
Open access
PDF file
MBMichele Cristina Rufino Barbosa
Michele Cristina Rufino Barbosa
HLHernani Mota de Lima
Hernani Mota de Lima
Taludes vegetados são mais resistentes contra movimentos de massa e erosão pela água. A vegetação contribui para a estabilidade do solo, principalmente pelo aumento da resistência ao cisalhamento por meio do reforço oferecido pelas raízes. As espécies vegetais que mais têm sido eficientes na estabilização de taludes instáveis são as gramíneas, pertencentes à família Poaceae. Um exemplar dessa família, capim vetiver (Chrysopogonzizanioides (L.) Roberty), tem se revelado muito eficaz nessa estabilização. Com o objetivo de avaliar a melhoria dos parâmetros de resistência ao cisalhamento oferecida ao solo pelas raízes do capim vetiver com o tempo de plantio, realizaram-se experimentos de cisalhamento direto por meio de amostras indeformadas de solo sem vegetação e cultivadas com capim vetiver na idade de um, dois, três e quatro anos de plantio. Também foram realizados experimentos de cisalhamento direto em talude do mesmo solo sem vegetação e com cobertura desse capim. Os resultados do ensaio de cisalhamento direto das amostras de talude de solo foram avaliados por três métodos de equilíbrio limite para verificação de um fator de segurança médio nos taludes. A partir dos ensaios de cisalhamento direto, determinaram-se os parâmetros de resistência ao cisalhamento (intercepto de coesão e ângulo de atrito interno), verificando que o capim vetiver proporcionou incremento de coesão aparente ao solo, sendo esse destacado após três anos de plantio do capim. Esse capim promoveu melhoria nos parâmetros de resistência com consequente elevação do fator de segurança de taludes e aumento da resistência ao cisalhamento de solos, o que auxiliou na estabilização de taludes em planos superficiais de ruptura.