Unmanned Aerial Vehicles (UAVs) have been employed in the construction industry in the last decade for various purposes such as progress monitoring and building inspection. Recently, there has been a rising trend of employing UAVs with other digital technologies (DTs), such as Building Information Modeling and Extended Reality. The integration of these technologies encourages automation and digitization toward better project performance. However, little is known about the implementation of UAVs in conjunction with other DTs. Therefore, this study performs a systematic literature review to determine application areas and technology trends regarding UAVs’ integration with other DTs. The search yielded 287 articles, of which 36 satisfied the established inclusion criteria and formed the foundation of this systematic review. Seven application areas of UAV integration with other DTs were identified: progress monitoring, historic building conservation, information management, construction safety, construction education, structural and infrastructure inspection, and transportation. This study also revealed UAV technology trends encouraging automation and digitization: automated progress monitoring, automated UAV inspection planning, real-time video streaming, and parametric model development of historicbuildings. This study is expected to be a starting point of future in-depth research by providing a general understanding of the current applications of UAVs integration with other DTs.
Despite the rapid growth of infrastructure development in Indonesia, work safety remains a major concern in construction projects. Design-for-safety (DfS) is a critical strategy to prevent work accidents. The implementation of design-for-safety is one of the most important strategies for preventing work accidents. This study aimed to analyze multiple factors that influence the implementation of work safety design using two statistical approaches: structural equation modeling and an artificial neural network. Structural equation modeling analyzes the relationship pattern between variables and their indicators, and artificial neural network maps various similar patterns to predict variables that influence implementation. Designers, owners, policies, tools/equipment, knowledge, and contract documents positively affect design-for-safety implementation, with design and contract documents being the most significant variables. Accordingly, industry and government agencies are advised to prioritize contract documents and design factors, along with other variables as supporting factors in their programs to accelerate design-for-safety implementation in Indonesia.
The development of high-rise buildings worldwide has given rise to significant concerns regarding their excessive electricity consumption. Among the various categories of high-rise structures, hotels used for business and conferences stand out as particularly extravagant in their energy use. The consequence arising from excessive energy usage is an escalation in carbon emissions, which is a primary driver of global warming. Therefore, this study aims to investigate the energy use intensity (EUI) of a hotel building located in Jakarta, Indonesia. In order to improve energy performance, this study explored various options for renovating the building envelope, such as incorporating insulation and a roof covering, as well as implementing building-integrated photovoltaics (BIPV). The building envelope renovations demonstrated a notable reduction in energy use by 15.8–27.7% per year. BIPV, such as curtain walls and double-skin façades, generated an energy use reduction of 4.8–8.6% per year. Remarkably, by combining the two approaches (i.e., adding insulation and a roof covering in the building envelope and adopting BIPV as double-skin façades), the potential reduction in energy use reached up to 32.2% per year. The findings can assist decision-makers in developing building renovation strategies for high-rise buildings while considering energy conservation.
Unmanned aerial vehicle (UAV) is one of the most prominent technologies in the construction industry for data collection purposes. Compared with traditional methods, UAVs collect data faster and more efficiently at a lower cost. One of the construction works that can be monitored using UAV is earthwork. Earthwork monitoring is essential to complete the earthwork on time, according to plan, and within budget. This paper presents an application study on the UAV-based earthwork monitoring of a high-rise building project in the Republic of Korea. Earthwork of building projects have distinct characteristics. The area is excavated downwards to tens of meters deep, thus contractors deal with several types of soil. The building project is usually built in a densely built area. Therefore, contractors must monitor the slope as it poses landslide risk to surrounding areas. UAV can calculate the excavated volume, monitor the progress and the site, and document earthwork periodically and strategically. Based on case study, this study compared estimated volume based on GPS and actual excavated volume based on UAV survey and found 0.71% difference, indicating the reliability of surveying using UAV. However, the volume per soil type was quite different between both methods, resulting in 15.8% (USD 183,057) cost difference. This study shows that UAV technology is effective in monitoring the actual excavated volume, thus supporting fair business practices and transparency between stakeholders.
The frequency of work accidents in construction projects is relatively high. One contributing factor to work accidents is unsafe behavior by workers at construction sites. In Indonesia, this is the first study to investigate 2503 instances of unsafe behavior that occurred across Indonesian construction projects in relation to their attributes to obtain insightful knowledge by using the association rule mining (ARM) method. Association rule mining was used to explore the database. As a result, two consolidated rules were obtained. The most frequent unsafe behaviors were workers putting tools and materials in random places, workers not attaching safety lines at provided places, and workers moving work tools and materials in ways that were not in accordance with procedures. These unsafe behaviors were associated with accident types of falling, and being struck or cut by items, as well as violations of Manpower and Transmigration Ministerial Regulation 01/1980, and Manpower Ministerial Regulation 09/2016. The ARM results were evaluated with a reliability evaluation method before being validated by construction safety experts. Hence, the findings are reliable to be used as guideline information for safety trainers to prioritize related safety trainings and for safety inspectors when carrying out inspections on construction sites. As a result, safety management and safety performance can increase significantly.
Rebar usage and cutting waste contribute significantly to global greenhouse gas emissions, mainly CO2 and CH4. Researchers have explored various means to minimize cutting waste; however, these studies have yet to address reducing splices and utilizing a single specific special-length rebar. Hence, this study proposed an algorithm to minimize rebar usage and reduce rebar-cutting waste to less than 1% (near-zero rebar-cutting waste). The algorithm involves two main steps: (1) reducing the number of splices by utilizing special-length rebar and (2) adjusting the rebar accordingly based on the obtained special-length rebar. The algorithm was applied to the column rebars of an RC building to validate its effectiveness. The results confirmed a reduction in rebar usage by 3.226 tons (17.76%), a cutting waste rate of 0.83% (near-zero rebar-cutting waste achieved), a reduction of 11.18 tons in CO2 emissions, and a cost reduction of USD 3741. Employing the proposed algorithm in RC building and structure projects will amplify the corresponding benefits and contribute to the achievement of SDGs adopted by the United Nations to ensure sustainable resource usage and the acceleration of sustainable and green construction practices.