View All Publications
30 January 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YKYoung Je Kim
Young Je Kim
HJHyuk Sang Jung
Hyuk Sang Jung
YLYong-Joo Lee
Yong-Joo Lee
DODong-Wook Oh
Dong-Wook Oh
MSmin son
min son
YHYoon HwanHee
Yoon HwanHee
Reinforced soil retaining wall are ground structures that can be readily seen all around us. The development of reinforcements to these walls and their demand have increased rapidly. These walls are advantageous because they can be used not only in simple construction compared with reinforced concrete retaining walls but also when the height of the wall needs to be higher. However, unlike reinforced concrete retaining walls, in which the walls are integrated and resist the earth pressure on the back, the block-type reinforced earth retaining wall method secures its structural stability by frictional force between the buried land and reinforcements. A phenomenon in which a block is cracked or dropped owing to deformation has been frequently reported. In particular, this phenomenon is concentrated at the curved parts of a reinforced soil retaining wall and is mainly known as a stress concentration. However, to date, the design of reinforced soil retaining walls has been limited by the two-dimensional plane strain condition and has not considered the characteristics of the curved part. There is a lack of research on curved part. Therefore, this research determines the behavioural characteristics of curved-part reinforced soil retaining walls with regard to the shape (convex or concave) and angle (60°, 90°, 120°, and 150°). The displacement generated in the straight part and the curved part was analysed through an Laboratory Scale Test. The results showed that the horizontal displacement of the curved part increases as a convex angle becomes smaller, and the horizontal displacement of the curved part decreases as a concave angle becomes smaller. At the center (D and H have the same length, but H represents the height and D represents the separation distance from the center of the curved part) of the convex curve, the horizontal displacement of the 0.5 D section decreased to 13.8%; it decreased to 41.0% in the 1.0 D section. For concave angles, it was revealed that the horizontal displacement from the center 0.0 D to the 0.5 D section of the curved part increased by 25%, and from the 1.0 D section, by 75%. It was confirmed that the displacement difference was largely based on the value of 0.5 D. It was judged that this can be used as basic data for the design and construction guidelines for reinforced soil retaining wall of reinforced soil retaining walls.

15 May 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DODong-Wook Oh
Dong-Wook Oh
SKSuk-Min Kong
Suk-Min Kong
SKSu-Bin Kim
Su-Bin Kim
YLYong-Joo Lee
Yong-Joo Lee
Tunneling, especially in urban areas, affects many structures on the ground, which directly influences the usability and stability of the structures. The settlement of and axial stress on the pile foundation are important factors that determine the behavioral characteristics of the pile foundation. Therefore, this study uses numerical analysis and machine learning to derive a prediction model of pile axial stress due to tunnel excavation adjacent to the piled raft. Numerical analysis data were utilized for machine learning purposes, and the effects of the input data on the prediction model were scrutinized. The numerical analysis revealed that the change in the pile axial stress resulting from tunnel excavation differed depending on the pile’s location, with the greatest axial stress reduction occurring in the center of the piled raft. Furthermore, the rate of reduction was higher in soils with lower relative densities. Several algorithms were employed to derive the prediction model, with tree-based algorithms displaying notable performance in predicting pile axial stress. Additionally, preprocessing the data with appropriate feature engineering techniques exhibited superior predictive power, and incorporating settlement data aided in enhancing the prediction model’s performance.

28 June 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DODong-Wook Oh
Dong-Wook Oh
SKSuk-Min Kong
Suk-Min Kong
YLYong-Joo Lee
Yong-Joo Lee
HPHeon-Joon Park
Heon-Joon Park
For tunneling in urban areas, understanding the interaction and behavior of tunnels and the foundation of adjacent structures is very important, and various studies have been conducted. Superstructures in urban areas are designed and constructed with piled rafts, which are more effective than the conventional piled foundation. However, the settlement of a piled raft induced by tunneling mostly focuses on raft settlement. In this study, therefore, raft and pile settlements were obtained through 3D numerical analysis, and the change rate of settlement along the pile length was calculated by linear assumption. Machine learning was utilized to develop prediction models for raft and pile settlement and change rate of settlement along the pile length due to tunneling. In addition, raft settlement in the laboratory model test was used for the verification of the prediction model of raft settlement, derived through machine learning. As a result, the change rate of settlement along the pile length was between 0.64 and −0.71. In addition, among features, horizontal offset pile tunnel had the greatest influence, and pile diameter and number had relatively little influence.

27 July 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SKSuk-Min Kong
Suk-Min Kong
DODong-Wook Oh
Dong-Wook Oh
SLSeong-Won Lee
Seong-Won Lee
CKChang-Yong Kim
Chang-Yong Kim
YLYong-Joo Lee
Yong-Joo Lee
Vital underground structures such as sewers, power transmission lines, subways, and underpasses are potentially vulnerable to adverse effects from aboveground construction. In this study, the influence of pile installation on nearby existing tunnels was investigated. Both a laboratory model test and finite-element numerical analysis were conducted. Twelve different combinations of horizontal and vertical offsets between the pile and the tunnel were investigated. Different surcharge loads (allowable and ultimate) were also considered. In this way, the appropriate separation distance between the existing tunnel and the piles was established for sandy, medium-compaction soil. Although this study considers simple ground conditions, it facilitates safe construction by confirming the appropriate separation distance and comparing the areas that cannot be penetrated by the structures of each standard.

17 February 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SKSuk-Min Kong
Suk-Min Kong
SCSang-Il Choi
Sang-Il Choi
SSSeungbo Shim
Seungbo Shim
HLHana Lee
Hana Lee
DODong-Wook Oh
Dong-Wook Oh
SLSeong-Won Lee
Seong-Won Lee
Recent studies have increasingly investigated construction methods for tunnel excavation because of growing underground space development. Although the New Austrian tunneling method (NATM)—a representative tunnel excavation method—can be applied to various ground conditions, as well as having good constructability and economic feasibility, it suffers from problems such as vibration and noise. By contrast, excavation using a tunnel boring machine (TBM)—a representative mechanized construction method—affords advantages such as stable excavation, minimized ground and environmental damage, noise, and vibration. However, it cannot be applied easily to various ground conditions, and it suffers from problems such as high construction costs and delays owing to equipment defects. Therefore, the simultaneous pilot tunnel excavation using the TBM—which affords advantages such as constructability, economic feasibility, and minimized noise and vibration—and rear enlargement blasting using NATM was investigated in this study. A protection shield was installed to minimize accidents occurring from equipment defects (a disadvantage of TBM) and analyze the decrease in the effect of NATM blasting, which depends on the use of the protection shield and the separation distance through 3D numerical analysis.

31 May 2017 in Journal of Korean Tunnelling and Underground Space Association
Verified
Journal Article
Closed access
PDF file
DODong-Wook Oh
Dong-Wook Oh
YLYong-Joo Lee
Yong-Joo Lee