Wei Li

Dr. Wei Li

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 December 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
WLWei Li
Wei Li
RSRui Sun
Rui Sun
YTYe Tian
Ye Tian
Nature-based solutions (NbS) rapidly develop globally to address societal challenges and provide human well-being and biodiversity. Watershed restoration plays an essential role in enhancing the ecological and socio-economic benefits of the region. The design and implementation of watershed restoration projects are crucial to their effectiveness, and NbS has been applied as a concept in ecosystem-related projects. This paper proposes an evaluation method to assess the implementation of the Shan-Shui Initiative in the Jiulong River Watershed restoration projects based on the eight criteria proposed by the International Union for the Conservation of Nature (IUCN) Global Standard for Nature-Based Solutions. The aim is to standardize the implementation process of watershed restoration projects to achieve more significant benefits and practically apply the concept of NbS in watershed restoration. The implementation scheme of the Shan-Shui Initiative in the Jiulong River Watershed is designed to evaluate and improve the design and implementation scheme of ecological restoration projects in the actual basin. According to the assessment results, the degree of matching based on NbS for the implementation scheme of the Jiulong River Watershed Shan-Shui Initiative is 73%, which meets the criteria of NbS but needs to be improved in terms of monitoring and assessment, synergistic management, and benefit trade-offs.

2 November 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
WLWei Li
Wei Li
RSRui Sun
Rui Sun
YTYe Tian
Ye Tian
Nature-based solutions (NbS) rapidly develop globally to address societal challenges and provide human well-being and biodiversity. Watershed restoration plays an essential role in enhancing the ecological and socio-economic benefits of the region. The design and implementation of watershed restoration projects play a crucial role in their effectiveness, and NbS has been applied as a concept in ecosystem-related projects. This paper provides an idea to evaluate the design or implementation of watershed restoration projects based on the eight criteria proposed by the IUCN Global Standard for Nature-Based Solutions and to adjust the projects based on the evaluation results. The aim is to standardize the implementation process of watershed restoration projects to achieve more significant benefits and practically apply the concept of NbS in watershed restoration. implementation scheme of the Shan-Shui Initiative in the Jiulong River Watershed and concludes that the method is feasible in evaluating and improving the design and implementation scheme of ecological restoration projects in the actual basin. According to the assessment results, the degree of matching based on NbS for the implementation scheme of the Jiulong River Watershed Shan-Shui Initiative is 73%, which meets the criteria of NbS but needs to be improved in terms of monitoring and assessment, synergistic management, and benefit trade-offs.