Many systems are required to execute a series of missions with a finite break between any two adjacent missions. In order to improve the reliability of the system completing the next mission successfully, it is necessary to perform maintenance actions on the components considering limited maintenance resources. A novel idea to solve the problem of selective maintenance for a series-parallel system is proposed in this paper. This problem consists in finding the best choice of maintenance actions on a multi-component system by maximizing the system reliability under limited resources. With the increased number of components in the system, the possible combinations of selective maintenance increase exponentially, which raises the difficulty of the problem. For better solution of the problem, from the perspective of maintenance benefit, we develop a selective maintenance policy under maintenance priority of components. Finally, numerical example of a series-parallel system is given to illustrate the proposed method and verify the correctness and accuracy of the method.
1 January 2023 in Mathematical Problems in Engineering
Most selective maintenance research strategies ignore the comprehensive evaluation of numerous following missions in favor of focusing just on the reliability of the next mission. In the same circumstance, however, assessing simply impending missions differs from considering the overall system’s maintenance planning outcomes. In this study, a decision‐making model for selective maintenance is developed by evaluating the total system reliability over a finite planning horizon. The purpose is to calculate the maintenance activities for each system component during each break and the best number of maintenance interruptions for the planning horizon to achieve maximum system reliability. Consequently, the selective maintenance problem is formulated as a max–min optimization model. Also, a hybrid imperfect maintenance model is used to formulate the component improvement after maintenance. Finally, simple case illustrations of maintaining the production system in coal transportation are given based on the assumed data.