Coal mine solid waste backfill is a coal mining method employed to safeguard subterranean and surface geological formations, as well as water resources, against impairment. It stands as a pivotal technical approach for realizing ecologically sustainable mining endeavors, aiming to address China’s predicament of ’three down’ coal pressure, coal gangue emissions, and land resource scarcity. This manuscript delves into an in-depth exploration of the evolution and research status pertaining to solid backfill technology, encompassing backfill materials, rock mechanics, backfill processes, and their application across China’s coal sector. The developmental challenges and technical intricacies linked to solid backfill technology within coal mines are meticulously scrutinized. Building upon these challenges and complexities, this study sets forth a progressive trajectory for solid backfill technology within the contemporary era. This trajectory envisions the synchronized advancement of novel solid backfill materials, intelligent surveillance and regulation methodologies, and machine learning technologies for backfill quality assessment. By doing so, the overarching aim of achieving superlative quality, heightened efficiency, and automation in solid backfill practices can be effectively realized.
When the pulse current method is used for partial discharge (PD) monitoring of mining cables, the detected PD signals are seriously disturbed by the field noise, which are easily submerged in the noise and cannot be extracted. In order to realize the effective separation of the PD signal and the interference signal of the mining cable and improve the signal-to-noise ratio of the PD signal, a denoising method for the PD signal of the mining cable based on genetic algorithm optimization of variational mode decomposition (VMD) and wavelet threshold is proposed in this paper. Firstly, the genetic algorithm is used to optimize the VMD, and the optimal value of the number of modal components K and the quadratic penalty factor α is determined; secondly, the PD signal is decomposed by the VMD algorithm to obtain K intrinsic mode functions (IMF). Then, wavelet threshold denoising is applied to each IMF, and the denoised IMFs are reconstructed. Finally, the feasibility of the denoising method proposed in this paper is verified by simulation and experiment.
The voltage level of a coal mine power grid directly affects the starting and normal operation of the electric motor, but the current grid monitoring system cannot use real-time grid structure parameters and power flow distribution data to conduct early warning research on the running status and voltage level of the power grid, so it cannot eliminate hidden danger in the operation of the power grid. Therefore, it is necessary to accurately and effectively evaluate the voltage safety level of the coal mine power grid. In this paper, an improved AHP-FCE method is proposed to evaluate the voltage safety level of a coal mine power grid. By replacing the comparison judgment matrix with the interval judgment matrix, the objectivity of the weight vector is improved while retaining expert subjectivity. According to the real-time power flow distribution data of the power grid monitoring system, the current voltage safety level of the power grid is evaluated. The results show that the improved AHP-FCE method can accurately evaluate the current grid voltage level, analyze the voltage development trend, give early warnings regarding coal mine grid voltage operation, and improve the monitoring function of the power monitoring system.
Grid-forming (GFM) converters face significant challenges in low-voltage ride-through (LVRT) due to their limited overcurrent capacity. Various transient current-limiting methods have been proposed to address this issue. However, simple current-limiting settings during grid faults can severely compromise the transient stability and reactive power output of GFM, thereby affecting compliance with grid codes. To align with the global push for sustainable energy systems, this study proposes a virtual impedance tuning method (CL-TS VI) that simultaneously considers current-limiting and transient stability requirements, addressing the dual demands of high efficiency and reliable integration of renewable energy. By combining this method with an inner-loop control design based on balanced currents, an enhanced low-voltage ride-through (E-LVRT) scheme is developed. The proposed scheme achieves the coordinated fulfillment of both current-limiting and transient stability requirements by quantitatively analyzing the applicable range of virtual impedance parameters. Specifically, under the constraint of current-limiting conditions, fault scenarios are classified into two categories, with and without equilibrium points, depending on the severity of voltage sag. Then, based on the Lyapunov stability theory, separate virtual impedance design criteria are proposed for these two scenarios, ensuring that the GFM maintains both current-limiting capability and transient stability during fault ride-through while minimizing active power losses. Additionally, the proposed scheme enhances reactive power support capability in the post-fault phase, ensuring compliance with grid code requirements while promoting sustainable grid operation. The proposed strategy is validated through time-domain simulations and hardware experiments. The results demonstrate that the proposed scheme significantly improves the transient stability of GFM and provides a reliable solution for its efficient operation under complex grid conditions.
This paper investigates the path planning problem of the coal mine solid-filling and pushing mechanism and proposes a hybrid improved adaptive genetic particle swarm algorithm (AGAPSO). To enhance the efficiency and accuracy of path planning, the algorithm combines a particle swarm optimization algorithm (PSO) and a genetic algorithm (GA), introducing the sharing mechanism and local search capability of the particle swarm optimization algorithm. The path planning of the pushing mechanism for the solid-filling scenario is optimized by dynamically adjusting the algorithm parameters to accommodate different search environments. Subsequently, the proposed algorithm’s effectiveness in the filling equipment path planning problem is experimentally verified using a simulation model of the established filling equipment path planning scenario. The experimental findings indicate that the improved hybrid algorithm converges three times faster than the original algorithm. Furthermore, it demonstrates approximately 92% and 94% better stability and average performance, respectively, than the original algorithm. Additionally, AGAPSO achieves a 27.59% and 19.16% improvement in path length and material usage optimization compared to the GA and GAPSO algorithms, showcasing superior efficiency and adaptability. Therefore, the AGAPSO method offers significant advantages in the path planning of the coal mine solid-filling and pushing mechanism, which is crucial for enhancing the filling effect and efficiency.