Feng Chen

Dr. Feng Chen

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2021 in Electric Power Systems Research
Verified
Journal Article
Closed access
FCFeng Chen
Feng Chen
ZGZhixuan Gao
Zhixuan Gao
YSYanying Sun
Yanying Sun
PCPeng Chen
Peng Chen

25 April 2022 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
YWYanwen Wang
Yanwen Wang
CPChen Peng
Chen Peng
FCFeng Chen
Feng Chen
The voltage level of a coal mine power grid directly affects the starting and normal operation of the electric motor, but the current grid monitoring system cannot use real-time grid structure parameters and power flow distribution data to conduct early warning research on the running status and voltage level of the power grid, so it cannot eliminate hidden danger in the operation of the power grid. Therefore, it is necessary to accurately and effectively evaluate the voltage safety level of the coal mine power grid. In this paper, an improved AHP-FCE method is proposed to evaluate the voltage safety level of a coal mine power grid. By replacing the comparison judgment matrix with the interval judgment matrix, the objectivity of the weight vector is improved while retaining expert subjectivity. According to the real-time power flow distribution data of the power grid monitoring system, the current voltage safety level of the power grid is evaluated. The results show that the improved AHP-FCE method can accurately evaluate the current grid voltage level, analyze the voltage development trend, give early warnings regarding coal mine grid voltage operation, and improve the monitoring function of the power monitoring system.

17 May 2023 in Processes
Verified
Journal Article
Open access
PDF file
YWYanwen Wang
Yanwen Wang
YSYanying Sun
Yanying Sun
YLYalong Li
Yalong Li
FCFeng Chen
Feng Chen
PCPeng Chen
Peng Chen
Interval forecasting has become a research hotspot in recent years because it provides richer uncertainty information on wind power output than spot forecasting. However, compared with studies on single wind farms, fewer studies exist for multiple wind farms. To determine the aggregate output of multiple wind farms, this paper proposes an interval forecasting method based on long short-term memory (LSTM) networks and copula theory. The method uses LSTM networks for spot forecasting firstly and then uses the forecasting error data generated by LSTM networks to model the conditional joint probability distribution of the forecasting errors for multiple wind farms through the time-varying regular vine copula (TVRVC) model, so as to obtain the probability interval of aggregate output for multiple wind farms under different confidence levels. The proposed method is applied to three adjacent wind farms in Northwest China and the results show that the forecasting intervals generated by the proposed method have high reliability with narrow widths. Moreover, comparing the proposed method with other four methods, the results show that the proposed method has better forecasting performance due to the consideration of the time-varying correlations among multiple wind farms and the use of a spot forecasting model with smaller errors.

25 July 2019 in IEEE Access
Verified
Journal Article
Open access
ZGZhixuan Gao
Zhixuan Gao
CWCong Wang
Cong Wang
JFJunqing Fu
Junqing Fu
BHBangbang He
Bangbang He
FCFeng Chen
Feng Chen
QLQiwei Lu
Qiwei Lu
In cascaded H-bridge rectifier (CHBR), the DC capacitor voltages need to be controlled to balance by voltage balance controller when the loads are unbalanced. However the voltage balance controller will fail to balance the DC capacitor voltages when the load unbalancing range exceeds a certain limit under unity power factor; that limit is constrained by the AC voltage and transmission power of each H-bridge. Firstly, the relationships in CHBR was analyzed. Then, the expression between AC voltage and the power of each H-bridge was derived. Then the load unbalancing limits to maintain the DC capacitor voltage balance of each H-bridge were further deduced. In addition, the influence of ripple power and total load power on the load unbalancing limits was investigated. Finally, an experimental prototype of a singlephase three-cell cascade H-bridge rectifier was built and the correctness of the proposed load unbalancing limits was verified by experiment. The proposed load unbalancing limits are universal, which provides theoretical support for the stable operation and power transmission of CHBR.

25 April 2023 in Sensors
Verified
Journal Article
Open access
PDF file
YWYanwen Wang
Yanwen Wang
PCPeng Chen
Peng Chen
FCFeng Chen
Feng Chen
CCcaojiyuan cao
caojiyuan cao
The dielectric loss angle can better reflect the overall insulation level of mining cables, so it is necessary to implement reliable and effective online monitoring of the dielectric loss angle of mining cables. In order to improve the monitoring accuracy of the dielectric loss angle tan δ of mining cables, a low-frequency dielectric loss angle online monitoring method combining signal injection method and double-end synchronous measurement method is proposed in this paper. Firstly, the superiority of the low-frequency signal in improving the detection accuracy of dielectric loss angle is explained, and the feasibility of the low-frequency signal injection method is analyzed. Secondly, the cable leakage is calculated using the double-terminal synchronous measurement method to measure the core current at the first and last ends of the cable, and the phase sum of the voltage at the first and last ends is selected as the reference phase quantity to realize the effective calculation of the dielectric loss angle tan δ of the cable. Then, the simulation model for online monitoring of dielectric loss angle of mining cable is built, and the feasibility of the online monitoring method proposed in this paper is verified by combining the simulation results. Finally, the theoretical and simulation analysis of the monitoring error of dielectric loss angle of mining cable is carried out.

2 January 2025 in Processes
Verified
Journal Article
Open access
PDF file
ZHZihan Hu
Zihan Hu
ZXZeng Xiangjun
Zeng Xiangjun
FCFeng Chen
Feng Chen
HDHaoran Diao
Haoran Diao
The grid ancillary service capability of bus swapping stations (BSSs) is significantly affected by environmental temperature fluctuations and the disorderly charging and discharging of batteries. This study addressed these challenges by developing a comprehensive optimization model for scheduling BSS operations under varying environmental conditions. First, based on real-world energy consumption and temperature data, an energy consumption coefficient correction method was proposed to improve the accuracy of energy consumption calculations. Next, a greedy strategy was utilized to match vehicle battery swapping demands with available batteries in the BSS. A two-layer multi-objective optimization model was then constructed to optimize the charging and discharging power. The upper layer minimizes the total costs, including charging/discharging costs and battery degradation costs, while the lower layer minimizes the load peak-valley difference and maximizes the charging/discharging balance among all batteries. Numerical simulations of the proposed energy consumption correction coefficient improved the accuracy of electric bus energy consumption estimation. Additionally, the proposed optimization strategy reduced the operational cost of the bus battery swapping station by 53.09% and decreased the transformer’s maximum load rate by 28.28%.