Lixiong Gu

Dr. Lixiong Gu


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 February 2021 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
NMNiujing Ma
Niujing Ma
LGLixiong Gu
Lixiong Gu
CPChang-Li Peng
Chang-Li Peng
To make sure the tension adjustment in the cables of concrete cable-stayed bridges is conducted successfully, a new adjustment technique for the tension adjustment is presented, with the cable-girder temperature difference taken into account. The tensions are measured via frequency method. Prior to the tension adjustment, tensions and temperatures of all cables and girders are measured when the ambient temperature is stable, and this set of tensions is taken as reference tensions. During the tension adjustment, the relative variable quantities of the tensions are regarded as the control values, while the vertical displacement in the mid-span section of the main span is regarded as the verification value. After each pair of cables is adjusted, it is required to measure the temperatures of cables and girders as well as the vertical displacement variation in the mid-span section of the main span. To guarantee the structural behavior of entire bridge is controlled, at one-third cable points, two-third cable points and the farthest cable points, the frequencies of each pair of cables as well as the temperatures of each pair of cables and girders should be measured so as to recalculate the cable tensions. After that, these cable tensions are compared with the theoretical ones to ensure the structural behavior of entire bridge in control. Finally, Furong bridge, a concrete cable-stayed bridge with double inclined pylons, is taken as a sample application of this proposed technique. The results of cable tensions in this bridge illustrate the new adjustment technique is both accurate and efficient.

30 May 2024 in Buildings
Verified
Journal Article
Open access
PDF file
FLFanggang Liu
Fanggang Liu
LGLixiong Gu
Lixiong Gu
HFHaishan Fu
Haishan Fu
XLXinping Li
Xinping Li
XZXiaolong Zhao
Xiaolong Zhao
ZGZhaolong Guo
Zhaolong Guo
Based on the theory of zero bending moment under constant load, various optimization methods exist for the top beam of large-span continuous rigid frame bridges. These include achieving zero bending moment at the root of the cantilever beam, at the control stage section, and through the zero deflection method. This study aims to explore the methods and effects of optimizing roof beam design using the constant load zero bending moment method and the “three group bundle method”. Using finite element modeling, the total number and eccentricity of prestressed tendons required for each suspended pouring block are determined. Additionally, the “three group beam matching method” is employed to adjust the steel beam, adhering to the design concept of “large cantilever beam matching and small cantilever beam matching”, to achieve a reasonable configuration of the top plate beam. Through specific engineering examples, the results demonstrate that utilizing the constant load zero moment method and the “three group bundle method” can significantly enhance the structural performance and economy of large-span continuous rigid frame bridges. Moreover, it offers practical operability, providing an important reference basis for similar project designs.

26 December 2023 in Buildings
Verified
Journal Article
Open access
PDF file
JHJirong Huang
Jirong Huang
LGLixiong Gu
Lixiong Gu
ZHZhen He
Zhen He
JYJun Yu
Jun Yu
An analytical study was carried out on an anchored circular pit with a submerged free surface in layered soil. The seepage field around the anchor circular pit was divided into three zones. Separate variable method was used to obtain the graded solution forms of head distribution in the column coordinate system for each of the three regions. Combined with the continuity condition between the regions the Bessel function orthogonality was used to obtain the explicit analytical solution of the seepage field in each region, and the infiltration line was determined. Comparison with the calculation results of Plaxis 2D 8.5 software verified the correctness of the analytical solution. Based on the analytical solution, the influence of the radius of the pit and the distance of the retaining wall from the top surface of the impermeable layer on the total head distribution on both sides of the retaining wall was analyzed. And the variation in the infiltration line was determined with the above parameters. The results show that as the pit radius, r, decreased, the total head on both sides of the retaining wall gradually increased, and the height of the submerged surface drop also increased. As the distance, a, between the retaining wall and the impermeable boundary at the bottom increased, the hydraulic head on the outer side of the retaining wall decreased and the head on the inner side increased. The height of the submerged surface drop increased with decreasing depth of insertion of the retaining wall. The depth of insertion of the retaining wall had a greater influence on the degree of diving surface drop than the pit radius.

4 August 2024 in Buildings
Verified
Journal Article
Open access
PDF file
FLFanggang Liu
Fanggang Liu
LGLixiong Gu
Lixiong Gu
HFHaishan Fu
Haishan Fu
XLXinping Li
Xinping Li
XZXiaolong Zhao
Xiaolong Zhao
SLShixun Liu
Shixun Liu
This paper focuses on the analysis of the stress state of a large-span frame pier-continuous box girder bridge with pier crossbeams anchored by pier crossbeams on the main pier of the Guangfo-Zhao Expressway. The bridge is constructed by the cantilever method, and a refined finite element model of the entire bridge is established using the finite element software Midas/FEA to analyze the stress state of the frame pier during the cantilever construction process. It is found that under the possible combined action of an unbalanced load during construction, the torsional resistance of the frame pier crossbeam does not meet the requirements of the design code. In order to eliminate the torsion of the frame piers, counterweights were used to monitor the frame piers during the construction of the box girders. In this paper, the theoretical calculation formula of the inclination angle of the end section of the frame pier crossbeam with the change of unbalanced bending moment, the calculation formula of the relationship between the horizontal displacement of the frame pier and the unbalanced bending moment, and the calculation formula corresponding to the relationship with the water tank counterweight are derived using the structural mechanics method. Two monitoring methods for the frame pier are proposed. In the construction monitoring of the bridge, the numerical fitting formula obtained by finite element numerical analysis calculation is compared with the calculated formula obtained by substituting the design parameters of the frame pier into the theoretical formula. The basic constants in both formulas are basically equal, verifying the correctness of the monitoring calculation formula proposed in this paper for the torsional resistance of the frame pier crossbeam. The applicability of the two monitoring methods is also compared and analyzed. This paper takes the main pier of Chaoyang overpass’s mainline bridge as the engineering background, which adopts the framework pier with a large-span prestressed concrete continuous box girder bridge. It analyzes the torsional state of the beam of the framework pier during the bridge construction process and conducts research on the construction monitoring of the framework pier crossbeam, providing valuable references for the construction monitoring of framework pier crossbeams in the construction of large-span framework pier continuous bridges in the future. The research results of this paper can provide assistance for the construction monitoring of similar projects. This paper’s innovation primarily resides in employing structural mechanics methods to compute the torsion of frame piers. On this basis, a simplified beam torsion calculation formula is proposed to strengthen its practical application in construction monitoring. The findings of this paper can help in the construction monitoring of similar projects.

18 May 2023 in Buildings
Verified
Journal Article
Open access
PDF file
LGLixiong Gu
Lixiong Gu
CDChunguang Dong
Chunguang Dong
YZYi Zhang
Yi Zhang
XZXiaoxia Zhen
Xiaoxia Zhen
GLGuiyuan Liu
Guiyuan Liu
JJJianyi Ji
Jianyi Ji
An approach is presented to investigate the 1:2 internal resonance of the sling and beam of a suspension sling–beam system. The beam was taken as the geometrically linear Euler beam, and the sling was considered to be geometrically nonlinear. The dynamic equilibrium equation of the structures was derived using the modal superposition method, the D’Alembert principle and the Hamilton principle. The nonlinear dynamic equilibrium equations of free vibration and forced oscillation were solved by the multiple-scales method. We derived the first approximation solutions for the single-modal motion of the system. Numerical examples are provided to verify the correctness of formula derivation and obtain the amplitude–time response of free vibration, the primary resonance response, the amplitude–frequency response, and the amplitude–force response of forced oscillation. According to the analysis, it is evident that the combination system exhibits robust nonlinear coupling properties due to the presence of internal resonance, which are useful for engineering design.